INSP - Final | 4/30/1996 | 5/1/1996 | 5/1/1996 | A | CANC |
Jim Soden
|
|
|
final fire wall WRONG INSPECTOR
|
Permanent Occupancy | | 5/1/1996 | 5/1/1996 | | DONE |
|
|
|
|
INSP - Partial final | 5/1/1996 | 5/1/1996 | 4/26/1996 | P | PASS |
Wes Worcester
|
|
|
05/01/96 342 -
|
INSP - Temporary occupancy | 4/30/1996 | 5/1/1996 | 4/26/1996 | A | PASS |
Wes Worcester
|
|
|
05/01/96 342 - YOU BETTER BE THERE AT 8:15 OR BE SQUARE
|
INSP - Conference | 4/25/1996 | 4/25/1996 | 4/25/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - w/Bob and k-2
|
INSP - Set-back | 4/25/1996 | 4/25/1996 | 4/25/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - wall is on or at property line
|
INSP - Carpentry | 4/11/1996 | 4/11/1996 | 4/11/1996 | P | FAIL |
|
|
|
"SCRATCH COAT ON PLASTER ON FIREWALL.......?????" unable to find contractor
|
INSP - Carpentry | 4/9/1996 | 4/10/1996 | 4/10/1996 | A | NR |
Wes Worcester
|
|
|
FIREWALL
|
INSP - Carpentry | 4/10/1996 | 4/10/1996 | 4/10/1996 | P | CANC |
Wes Worcester
|
|
|
FIREWALL NAILING. (HE THINKS HE WILL BE READY AROUND 4 PM. J Sly looked at
|
INSP - Carpentry | 4/10/1996 | 4/10/1996 | 4/10/1996 | P | PASS |
Jim Sly
|
|
|
04/10/96 316 - LATE PM. HE THINKS HE WILL BE READY AROUND 4 PM. Looked at self firring 17ga lath....nailing at approx. 12-14" on center non corrosive nails....some bent over,...but more than schedule. schedule 16"-24".
|
INSP - Temporary occupancy | 4/5/1996 | 4/5/1996 | 4/5/1996 | P | PART |
Wes Worcester
|
|
|
attach phased construction agreement to approved plans
|
INSP - Final | 3/8/1996 | 3/8/1996 | 3/8/1996 | P | CANC |
Wes Worcester
|
|
|
THE FIRE DEPT. IS SCHEDULED FOR AROUND 1 P.M.
|
INSP - Carpentry | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | PASS |
Wes Worcester
|
|
|
FIREWALL
|
INSP - Carpentry | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | PASS |
Jim Sly
|
|
|
FIREWALL Wes looked at today.
|
INSP - Carpentry | 2/12/1996 | 2/12/1996 | 2/12/1996 | P | PASS |
Jim Sly
|
|
|
FIREWALL - LATE PM 1hr firewall OK.....Correction notice on other areas covered without inspection i.e. header above new bathroom door, steel post bearing...
|
INSP - Carpentry | 2/12/1996 | 2/12/1996 | 2/12/1996 | P | FAIL |
Wes Worcester
|
|
|
FIRE WALL LATE PM.
|
INSP - Carpentry | 2/12/1996 | 2/12/1996 | 2/12/1996 | P | PASS |
Wes Worcester
|
|
|
J sly looked at late in pm and was ok
|
INSP - Framing/Rough-in | 1/31/1996 | 1/31/1996 | 1/31/1996 | P | PART |
Jim Sly
|
|
|
early pm OK to cover handicap bath and furnace area. OK to insulate.
|
INSP - Framing/Rough-in | 1/31/1996 | 1/31/1996 | 1/31/1996 | P | PART |
Wes Worcester
|
|
|
early pm. draft stop at ceiling line
|
INSP - Roof | 1/12/1996 | 1/16/1996 | 1/16/1996 | A | PASS |
Wes Worcester
|
|
|
01/12/96 342 - ROOF NAILING ok as per J Sly
|
INSP - Conference | 12/19/1995 | 12/19/1995 | 12/19/1995 | | PASS |
Jim Sly
|
|
|
Wes no show at conference...called in sick.
|
INSP - Foundation | 12/15/1995 | 12/15/1995 | 12/15/1995 | | PASS |
Jim Sly
|
|
|
Foundation inspection and footing inspection for small wall at east of new structure.
|
INSP - Foundation | 12/14/1995 | 12/14/1995 | 12/14/1995 | P | PASS |
Jim Sly
|
|
|
CLOSE TO 1 PM AS POSSIBLE......
|
INSP - Footings | 12/12/1995 | 12/13/1995 | 12/13/1995 | A | PASS |
Jim Sly
|
|
|
|
INSP - Conference | 1/16/1996 | 1/16/1996 | 1/16/1995 | P | FAIL |
Jim Sly
|
|
|
Talked about problems.
|