Permit Information
Permit NumberBLD95-01555
StatusFinaled
Name COURTYARD BY MARRIOTT HOTEL
Site Address 222 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
COURTYARD BY MARRIOTT HOTEL-BUILDING SECTION #2-THIS BUILDING IS BEING DIVIDED INTO THREE BUILDINGS BY TWO AREA SEPARATION WALLS FOR ALLOWABLE AREA. PHASE I-TO POUR CONCRETE FOUNDATION AND SLAB FLOOR AND TO DO RELATED SITE WORK ONLY. (SEE CONDITONS FOR PHASE I CONSTRUCTION). TO CONSTRUCT A NEW 17740 SQ. FT., FOUR STORY, WOOD FRAME HOTEL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING CONTAINS 48 GUEST ROOMS. THIS BUILDING IS FULLY FIRE SPRINKLERED FOR ALLOWABLE ONE STORY INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. JCM/95-442/CU-21-95/DR-15-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/14/19971/14/19971/14/1997 PASS
INSP - Occupancy Sign-off1/13/19971/13/19971/13/1997 PASS
Inspected by Art Yingling - Proj. is in compliance w/CU-21-95/DR-15-95. Final Occ. Signed - OK to release Bond (10/10/96 - $79,123.00).
INSP - Occupancy Sign-off11/15/199611/15/199611/21/1996 FAIL
Issues of meeting DR cond. #1b, #1e (add'l shrubs and moving a tree). Providing specific approved shrubs. Cond. #1c - ground cover for NW Pad/pedestrian walkway, stiping drives and issue of Off-Premise Adv. Sign
INSP - Final10/16/199610/16/199610/16/1996 PASS
Details
/ / 405 - final occ check
INSP - Final10/14/199610/14/199610/14/1996 PART
OK for temp. occ. omly. Items on CN dated 10/11/96 still outstanding.
INSP - Final10/11/199610/11/199610/11/1996 PASS
temp occ approved, c/n issued for perm
INSP - Temporary occupancy10/10/199610/10/199610/10/1996 PASS
Insp for temp. by Art Y./Required bonding for landscaping & sprinkler system/Bond posted for $79,123.00 on 10/10/96 temporary occupancy signed.
INSP - Conference10/3/199610/3/199610/3/1996 PASS
Details
/ / 405 - punchlist, lane markers, hvac smokes to create list for temp pending alarm system changes
INSP - Conference10/1/199610/1/199610/1/1996AFAIL
DetailsWes Worcester
NEED TO FIRECAULK RATED WALLS AND COMPLETE bcec
INSP-Conference9/27/199610/1/199610/1/1996AFAIL
Details
09/30/96 405 - c/n issued on several items
INSP - Conference9/30/19969/30/19969/30/1996ANH
DetailsWes Worcester
INSP - Conference9/30/19969/30/19969/30/1996PNR
DetailsWes Worcester
checked lower handicapped and hot H2O lines not insulated
INSP - Conference9/27/19969/27/19969/27/1996PPART
DetailsWes Worcester
Handicap insp
INSP - Carpentry7/25/19967/25/19967/25/1996PNH
DetailsWes Worcester
corridors for fire caulking no one there at 5 pm
INSP - Framing/Rough-in6/24/19966/25/19966/25/1996APART
DetailsWes Worcester
06/25/96 342 - 8:15 A.M. TUESDAY c-3 and c-4 fire caulking ok
INSP - Framing/Rough-in6/21/19966/24/19966/24/1996ACANC
DetailsWes Worcester
06/24/96 342 - sent in am but not received until pm as computers were do am 1st thing Tues
INSP - Framing/Rough-in6/12/19966/13/19966/12/1996APASS
DetailsWes Worcester
06/12/96 342 - EARLY A.M. area b..3rd flr caulk & frame....106 being done
INSP - Framing/Rough-in6/11/19966/12/19966/12/1996ANR
DetailsWes Worcester
06/12/96 342 - FRAME AND FIRE CAULK EARLY P.M.
INSP - Wall cover6/12/19966/12/19966/12/1996 NR
DetailsWes Worcester
/ / 342 - area c-1
INSP - Framing/Rough-in6/11/19966/11/19966/11/1996PCANC
DetailsWes Worcester
06/11/96 342 - also caulking postponed to Wed am at 8 am ì
INSP - Framing/Rough-in5/16/19965/16/19965/16/1996PNR
DetailsJim Storey
05/16/96 301 - SENT TO YOU, WES IS SICK
INSP - Framing/Rough-in5/9/19965/16/19965/11/1996ACANC
DetailsWes Worcester
05/15/96 342 - Kim and Jim Storey went by, Wes sick
INSP - Framing/Rough-in5/9/19965/14/19965/9/1996ANR
DetailsWes Worcester
05/14/96 342 - still firecaulking and bracing trusses.. Called for corre
INSP - Framing/Rough-in5/8/19965/9/19965/3/1996APART
DetailsWes Worcester
05/08/96 342 - THURS AM
INSP - Carpentry4/29/19964/30/19964/25/1996APART
DetailsWes Worcester
04/30/96 342 - SET FOR 11:30 ì
INSP - Carpentry4/29/19964/29/19964/23/1996PCANC
DetailsWes Worcester
04/29/96 342 - CORRIDORS 3C & 3B.
INSP - Framing/Rough-in4/23/19964/25/19964/20/1996APART
DetailsWes Worcester
04/25/96 342 - AREA B-1 C-1 GUEST ROOMS WOULD LIKE A 9:00AM INSPECTION. still fire caulking and working on shafts and fireproofing steel I beam
INSP - Carpentry4/15/19964/16/19964/16/1996AFAIL
DetailsWes Worcester
EXTERIOR SHEATHING not stapled on vertical seam and staples have broken paper membrane
INSP - Framing/Rough-in4/4/19964/4/19964/4/1996PFAIL
DetailsWes Worcester
PRE-FRAMING. AREA C corridors and elevator shaft have been compromised. Letter of Transmittal sent 04/05/96
INSP - Conference3/1/19963/1/19963/1/1996PPASS
DetailsWes Worcester
1:30 pm please RC channel and 2 hr area sep wall ok to this point
INSP - Conference2/23/19962/23/19962/23/1996PPART
DetailsWes Worcester
went over spec requests, engineering and architectural rfi's
INSP - Carpentry2/22/19962/22/19962/22/1996PPASS
DetailsWes Worcester
INSP - Wall cover2/22/19962/22/19962/22/1996PCANC
DetailsWes Worcester
JIM -C/M CO. 1 PM PER WES..............