Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD95-01556
StatusFinaled
Name COURTYARD BY MARRIOTT HOTEL
Site Address 222 S BROADWAY AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
COURTYARD BY MARRIOTT HOTEL-BUILDING SECTION #3-THIS HOTEL BUILDING IS BEING DIVIDED INTO THREE BUILDINGS BY TWO AREA SEPARATION WALLS FOR ALLOWABLE AREA. PHASE I-TO POUR CONCRETE FOUNDATION AND SLAB FLOOR AND TO DO RELATED SITE WORK ONLY. (SEE CONDITIONS FOR PHASE I CONSTRUCTION). TO CONSTRUCT A NEW 34755 SQ. FT., FOUR STORY, WOOD FRAME HOTEL BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING CONTAINS THE LOBBY/RECEPTION AREA, THE RESTAURANT/KITCHEN AREA, TWO CONFERENCE ROOMS, LAUNDRY/HOUSEKEEPING, OFFICES AND OTHER EMPLOYEE AREAS AND 55 HOTEL GUEST ROOMS AND RELATED HOTEL STORAGE AREAS. THIS BUILDING IS FULLY FIRE SPRINKLED FOR ALLOWABLE ONE STORY HEIGHT INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. JCM/95-442/CU-21-95/DR-15-95
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final1/14/1997 1/14/1997 PASS
INSP - Occupancy Sign-off1/13/19971/13/19971/13/1997 PASS
Inspected by Art Yingling - Proj. is in compliance w/CU-21-95/DR-15-95. Final Occ. Signed - OK to release Bond (10/10/96 - $79,123.00).
INSP - Occupancy Sign-off11/15/199611/15/199611/21/1996 FAIL
Issues of meeting DR cond. #1b, #1e (add'l shrubs and moving a tree). Providing specific approved shrubs. Cond. #1c - ground cover for NW Pad/pedestrian walkway, stiping drives and issue of Off-Premise Adv. Sign
INSP - Final10/16/199610/16/199610/16/1996 PASS
Details
/ / 405 -
INSP - Final10/14/199610/14/199610/14/1996 PART
Ok for temp. occ.. Items from CN dated 10/11/96 still outstanding.
INSP - Final10/11/199610/11/199610/11/1996 PASS
temp occ approved, c/n issued for final
INSP - Temporary occupancy10/10/199610/10/199610/10/1996 PASS
Insp for temp. by Art Y./Required bonding for landscaping & sprinkler system/Bond posted for $79,123.00 on 10/10/96 temporary occupancy signed.
INSP - Final10/9/199610/9/199610/9/1996PPART
Details
10/09/96 405 - SMOKE DETECTORS complete need closers, elevator heats, ex
INSP - Final9/12/19969/12/19969/12/1996 PART
Details
/ / 405 - final alarms - lobby use only.... hvac smokes ok, kitchen ho
INSP - Final9/9/19969/10/19969/10/1996APART
DetailsWes Worcester
AREA A temp ok
INSP - Final9/9/19969/9/19969/9/1996 FAIL
not ready
INSP - Final9/9/19969/9/19969/9/1996 PART
calss 1 hood ok, alarms ok for lobby area
INSP - Final9/9/19969/9/19969/9/1996PCANC
DetailsWes Worcester
area A CANCELLED BY NICE GUY FROM CM/ DUE TO WES BEING BUSY/ RESCHEDULED FOR 09/10/AM. AJB
INSP - Final9/6/19969/6/19969/6/1996 FAIL
alarms system not ready
INSP-Sprinkler Rough-in/Hydro9/5/19969/5/19969/5/1996 PASS
wet system
INSP-Sprinkler Rough-in/Hydro9/3/19969/3/19969/3/1996 PASS
dry system
INSP - Framing/Rough-in8/27/19968/28/19968/28/1996APART
DetailsWes Worcester
FIRE CALKING
INSP-Supply line flush8/20/19968/21/19968/21/1996APASS
Details
08/22/96 405 - SYSTEM FLUSH OK
INSP - Framing/Rough-in6/13/19966/14/19966/13/1996APART
DetailsWes Worcester
06/13/96 342 - c-1 ok
INSP - Framing/Rough-in5/28/19965/29/19965/29/1996PCANC
DetailsJim Sly
05/28/96 316 - Cancel until thurs AM.
INSP - Framing/Rough-in5/31/19966/3/19965/28/1996PPART
DetailsWes Worcester
05/31/96 342 - MON. P.M. area A part and area B final caulking ok
INSP - Framing/Rough-in5/31/19965/31/19965/25/1996PPART
DetailsWes Worcester
05/31/96 342 - 2pm
INSP - Carpentry5/25/19965/25/19965/25/1996 PASS
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in5/29/19965/30/19965/24/1996APART
DetailsWes Worcester
05/29/96 342 -
INSP - Framing/Rough-in5/24/19965/24/19965/18/1996PPART
DetailsWes Worcester
05/24/96 342 - firecaulking in progress
INSP - Carpentry5/22/19965/22/19965/16/1996PPART
DetailsWes Worcester
05/22/96 342 - firecaulking B-1 replacing 1 metacaulk ftg and finishing some penetrations
INSP - Framing/Rough-in5/17/19965/20/19965/14/1996AFAIL
DetailsWes Worcester
05/17/96 342 - Request for 8:00 a.m. inspection. c/n for 2 hr area sep walls extending to roof deck and through overframe roof extension, and how to provide for attic ventilation.
INSP - Conference5/14/19965/14/19965/14/1996 PASS
DetailsWes Worcester
/ / 342 - area b-3 and b-4 ok
INSP - Framing/Rough-in5/14/19965/14/19965/14/1996 PART
DetailsWes Worcester
/ / 342 -
INSP - Framing/Rough-in5/16/19965/17/19965/11/1996ANR
DetailsWes Worcester
05/16/96 342 - PLEASE GO BY IN THE AM
INSP - Framing/Rough-in4/17/19964/18/19964/18/1996APART
DetailsWes Worcester
AREA A
INSP - Framing/Rough-in4/11/19964/11/19964/11/1996PPASS
Details
ceilings in corridors and bathrooms
INSP - Framing/Rough-in3/14/19963/15/19963/11/1996PNR
DetailsWes Worcester
03/15/96 342 -
INSP - Carpentry3/11/19963/11/19963/11/1996 PART
DetailsWes Worcester
/ / 342 - ? on 2 hr wall and fireproofing, will go out Mon w/Bob
INSP - Conference2/7/19962/12/19962/12/1996APASS
DetailsWes Worcester
HE WILL CALL YOU FOR A TIME.
INSP - Flatwork1/26/19961/26/19961/26/1996PPASS
DetailsWes Worcester
slab inspection not required, but this one is ok
INSP - Conference1/4/19961/4/19961/4/1996 PASS
DetailsWes Worcester
/ / 342 - resubmitting 1 hr requirements and wants another conference
INSP - Footings1/3/19961/3/19961/4/1996PPART
DetailsWes Worcester
01/03/96 342 - poured with spec insp on site
INSP - Foundation1/3/19961/3/19961/4/1996PPART
DetailsWes Worcester
01/03/96 342 - pouring with spec insp on site
INSP - Footings12/28/199512/29/19951/4/1996APART
DetailsWes Worcester
12/28/95 342 - spec insp on site
INSP - Conference12/20/199512/28/19951/4/1996PPASS
DetailsWes Worcester
12/28/95 342 - 1: 00 pre const conf. letter comming plumbing was only one that attended. E-mailed thanks to him and asked ot to contact respective subs
INSP - Foundation12/19/199512/19/199512/19/1995PPART
DetailsWes Worcester
12/19/95 342 - rebar without adequate cover. called MTI
INSP - Footings12/18/199512/18/199512/19/1995PPASS
DetailsWes Worcester
12/18/95 342 -
INSP - Conference10/5/199510/5/199510/5/1995 PASS
Details
/ / 338 -