INSP - Final | 1/14/1997 | | 1/14/1997 | | PASS |
|
|
|
|
INSP - Occupancy Sign-off | 1/13/1997 | 1/13/1997 | 1/13/1997 | | PASS |
|
|
|
Inspected by Art Yingling - Proj. is in compliance w/CU-21-95/DR-15-95. Final Occ. Signed - OK to release Bond (10/10/96 - $79,123.00).
|
INSP - Occupancy Sign-off | 11/15/1996 | 11/15/1996 | 11/21/1996 | | FAIL |
|
|
|
Issues of meeting DR cond. #1b, #1e (add'l shrubs and moving a tree). Providing specific approved shrubs. Cond. #1c - ground cover for NW Pad/pedestrian walkway, stiping drives and issue of Off-Premise Adv. Sign
|
INSP - Final | 10/16/1996 | 10/16/1996 | 10/16/1996 | | PASS |
|
|
|
/ / 405 -
|
INSP - Final | 10/14/1996 | 10/14/1996 | 10/14/1996 | | PART |
|
|
|
Ok for temp. occ.. Items from CN dated 10/11/96 still outstanding.
|
INSP - Final | 10/11/1996 | 10/11/1996 | 10/11/1996 | | PASS |
|
|
|
temp occ approved, c/n issued for final
|
INSP - Temporary occupancy | 10/10/1996 | 10/10/1996 | 10/10/1996 | | PASS |
|
|
|
Insp for temp. by Art Y./Required bonding for landscaping & sprinkler system/Bond posted for $79,123.00 on 10/10/96 temporary occupancy signed.
|
INSP - Final | 10/9/1996 | 10/9/1996 | 10/9/1996 | P | PART |
|
|
|
10/09/96 405 - SMOKE DETECTORS complete need closers, elevator heats, ex
|
INSP - Final | 9/12/1996 | 9/12/1996 | 9/12/1996 | | PART |
|
|
|
/ / 405 - final alarms - lobby use only.... hvac smokes ok, kitchen ho
|
INSP - Final | 9/9/1996 | 9/10/1996 | 9/10/1996 | A | PART |
Wes Worcester
|
|
|
AREA A temp ok
|
INSP - Final | 9/9/1996 | 9/9/1996 | 9/9/1996 | | FAIL |
|
|
|
not ready
|
INSP - Final | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PART |
|
|
|
calss 1 hood ok, alarms ok for lobby area
|
INSP - Final | 9/9/1996 | 9/9/1996 | 9/9/1996 | P | CANC |
Wes Worcester
|
|
|
area A CANCELLED BY NICE GUY FROM CM/ DUE TO WES BEING BUSY/ RESCHEDULED FOR 09/10/AM. AJB
|
INSP - Final | 9/6/1996 | 9/6/1996 | 9/6/1996 | | FAIL |
|
|
|
alarms system not ready
|
INSP-Sprinkler Rough-in/Hydro | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PASS |
|
|
|
wet system
|
INSP-Sprinkler Rough-in/Hydro | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
|
|
|
dry system
|
INSP - Framing/Rough-in | 8/27/1996 | 8/28/1996 | 8/28/1996 | A | PART |
Wes Worcester
|
|
|
FIRE CALKING
|
INSP-Supply line flush | 8/20/1996 | 8/21/1996 | 8/21/1996 | A | PASS |
|
|
|
08/22/96 405 - SYSTEM FLUSH OK
|
INSP - Framing/Rough-in | 6/13/1996 | 6/14/1996 | 6/13/1996 | A | PART |
Wes Worcester
|
|
|
06/13/96 342 - c-1 ok
|
INSP - Framing/Rough-in | 5/28/1996 | 5/29/1996 | 5/29/1996 | P | CANC |
Jim Sly
|
|
|
05/28/96 316 - Cancel until thurs AM.
|
INSP - Framing/Rough-in | 5/31/1996 | 6/3/1996 | 5/28/1996 | P | PART |
Wes Worcester
|
|
|
05/31/96 342 - MON. P.M. area A part and area B final caulking ok
|
INSP - Framing/Rough-in | 5/31/1996 | 5/31/1996 | 5/25/1996 | P | PART |
Wes Worcester
|
|
|
05/31/96 342 - 2pm
|
INSP - Carpentry | 5/25/1996 | 5/25/1996 | 5/25/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 5/29/1996 | 5/30/1996 | 5/24/1996 | A | PART |
Wes Worcester
|
|
|
05/29/96 342 -
|
INSP - Framing/Rough-in | 5/24/1996 | 5/24/1996 | 5/18/1996 | P | PART |
Wes Worcester
|
|
|
05/24/96 342 - firecaulking in progress
|
INSP - Carpentry | 5/22/1996 | 5/22/1996 | 5/16/1996 | P | PART |
Wes Worcester
|
|
|
05/22/96 342 - firecaulking B-1 replacing 1 metacaulk ftg and finishing some penetrations
|
INSP - Framing/Rough-in | 5/17/1996 | 5/20/1996 | 5/14/1996 | A | FAIL |
Wes Worcester
|
|
|
05/17/96 342 - Request for 8:00 a.m. inspection. c/n for 2 hr area sep walls extending to roof deck and through overframe roof extension, and how to provide for attic ventilation.
|
INSP - Conference | 5/14/1996 | 5/14/1996 | 5/14/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - area b-3 and b-4 ok
|
INSP - Framing/Rough-in | 5/14/1996 | 5/14/1996 | 5/14/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Framing/Rough-in | 5/16/1996 | 5/17/1996 | 5/11/1996 | A | NR |
Wes Worcester
|
|
|
05/16/96 342 - PLEASE GO BY IN THE AM
|
INSP - Framing/Rough-in | 4/17/1996 | 4/18/1996 | 4/18/1996 | A | PART |
Wes Worcester
|
|
|
AREA A
|
INSP - Framing/Rough-in | 4/11/1996 | 4/11/1996 | 4/11/1996 | P | PASS |
|
|
|
ceilings in corridors and bathrooms
|
INSP - Framing/Rough-in | 3/14/1996 | 3/15/1996 | 3/11/1996 | P | NR |
Wes Worcester
|
|
|
03/15/96 342 -
|
INSP - Carpentry | 3/11/1996 | 3/11/1996 | 3/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - ? on 2 hr wall and fireproofing, will go out Mon w/Bob
|
INSP - Conference | 2/7/1996 | 2/12/1996 | 2/12/1996 | A | PASS |
Wes Worcester
|
|
|
HE WILL CALL YOU FOR A TIME.
|
INSP - Flatwork | 1/26/1996 | 1/26/1996 | 1/26/1996 | P | PASS |
Wes Worcester
|
|
|
slab inspection not required, but this one is ok
|
INSP - Conference | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - resubmitting 1 hr requirements and wants another conference
|
INSP - Footings | 1/3/1996 | 1/3/1996 | 1/4/1996 | P | PART |
Wes Worcester
|
|
|
01/03/96 342 - poured with spec insp on site
|
INSP - Foundation | 1/3/1996 | 1/3/1996 | 1/4/1996 | P | PART |
Wes Worcester
|
|
|
01/03/96 342 - pouring with spec insp on site
|
INSP - Footings | 12/28/1995 | 12/29/1995 | 1/4/1996 | A | PART |
Wes Worcester
|
|
|
12/28/95 342 - spec insp on site
|
INSP - Conference | 12/20/1995 | 12/28/1995 | 1/4/1996 | P | PASS |
Wes Worcester
|
|
|
12/28/95 342 - 1: 00 pre const conf. letter comming plumbing was only one that attended. E-mailed thanks to him and asked ot to contact respective subs
|
INSP - Foundation | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PART |
Wes Worcester
|
|
|
12/19/95 342 - rebar without adequate cover. called MTI
|
INSP - Footings | 12/18/1995 | 12/18/1995 | 12/19/1995 | P | PASS |
Wes Worcester
|
|
|
12/18/95 342 -
|
INSP - Conference | 10/5/1995 | 10/5/1995 | 10/5/1995 | | PASS |
|
|
|
/ / 338 -
|