Permit Number | BLD95-01562 |
Status | Finaled |
Name |
FUNKE WILLIAM H JR & DIANE T
|
Site Address |
480 W RIDGELINE DR
|
Project Name | |
Customer Number | |
ePlanReview | No |
Description |
TO REMOVE EXISTING DECK, ESCAVATE, FORM, POUR, NEW FOUNDATION AS PER RECOMENDED DESIGN AND ELEVATIONS BY MIT, BUILD A NEW OFFICE, CLOSET ADDITION ON THE EXISTING MASTERBEDROOM AS PER APPROVED PLANS, ENGINEERING AND ATTACHED REQUIREMENT (CONDITIONS) LIST. Build approximatly 20lf of 5'6" Retaining wall Engineered by Stapley Engineering and approved by P&Z under HS-9-97. CAT III- HILLSIDE REQUIREMENTS APPLY ON THIS LOT. FINAL GRADING AND DRAINAGE INSPECTIONS MUST BE DONE BY THE DESIGNING ENGINEER AND PUBLIC WORKS DEPARTMENT OF THE CITY OF BOISE AND AN APPROVAL LETTER SUBMITTED TO THE BUILDING DEPARTMENT PRIOR TO APPROVAL FOR OCCUPANCY. NO DECK CONSTRUCTION UNDER THIS PERMIT. PRP.
|