Permanent Occupancy | | 3/30/1998 | 3/30/1998 | | DONE |
|
|
|
|
INSP - Conference | 3/3/1997 | 3/3/1997 | 3/3/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED CHK W/ CATHY W. IF ALL SIGS NOW ON CARD
|
INSP - Occupancy Sign-off | 11/22/1996 | 11/25/1996 | 11/25/1996 | | PASS |
|
|
|
Insp. by Art Yingling (AA-103-95); Signed Final - complies with Staff Level Approval.
|
INSP - Final | 11/22/1996 | 11/22/1996 | 11/22/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - final of 11-21-96 signed off in error...need Pub. wks & p&z
|
INSP - Framing/Rough-in | 11/22/1996 | 11/22/1996 | 11/22/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - frame ok...entry made for finaal insp of 11-21-96
|
INSP - Conference | 11/21/1996 | 11/21/1996 | 11/21/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ SHELBY, SUPT FOR CONNOLY RE ENG'G TO BE SUBMITTED AT FINA
|
INSP - Final | 11/20/1996 | 11/21/1996 | 11/21/1996 | A | PASS |
Carl Dependahl
|
|
|
11/21/96 340 - REC'D ENG'G FOR WALL REINFORCEMENT RETRO FIT; OK FOR C/O
|
INSP - Final | 11/20/1996 | 11/20/1996 | 11/20/1996 | P | PASS |
Joe Tawney
|
|
|
11/20/96 406 - 3 p.m. appointment. GIL - PAGER ###-#### OK FOR PERM OCC OR LETTR OF COMP
|
INSP - Final | 11/12/1996 | 11/12/1996 | 11/12/1996 | | FAIL |
Joe Tawney
|
|
|
11/08/96 406 - WANTS INSP.AFTER 3PM. CALL GIL AT DIG.PAGER ###-####. FAILED PREACTION SPKLR SYSTEM NOT OPERABLE
|
INSP - Conference | 11/5/1996 | 11/5/1996 | 11/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE T/O FOR GYM...TOLD TO GET ALL OTHER INSP'S & SIGN OFFS
|
INSP - Conference | 11/5/1996 | 11/5/1996 | 11/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE T/O FOR GYM...TOLD TO GET ALL OTHER INSP'S & SIGN OFFS
|
INSP - Ceiling grid | 9/30/1996 | 10/1/1996 | 10/1/1996 | A | PART |
Carl Dependahl
|
|
|
09/30/96 340 - PART; UPPER STAIR LANDING AREA, LOBBY 1ST FL SOUTH. NEED AT UPPER LANDING & SEAL CONDUIT, PIPE PENETRATIONS. OK TO DROP TILE
|
INSP - Carpentry | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHK FIRESTOPS ABOVE NON-RATED CEILING,NEED TO SEAL AT DUCT A CONTINUE
|
INSP - Ceiling grid | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | PART |
Carl Dependahl
|
|
|
09/20/96 340 - PART, CORRIDOR & STAIR LID AT EAST SIDE, STAIR AT NW. NEE AT CHASE NW CORNER
|
INSP - Ceiling grid | 9/17/1996 | 9/17/1996 | 9/17/1996 | P | PART |
Carl Dependahl
|
|
|
09/17/96 340 - suspended ceiling... PART, PE & WRESTLING RMS; FIRESTOPS AT FINAL. SEISMIC OK
|
INSP - Ceiling grid | 9/13/1996 | 9/16/1996 | 9/16/1996 | P | FAIL |
Carl Dependahl
|
|
|
09/13/96 340 - EARLY P.M. ..C/N, NEED COMPLETE FIRESTOPS, GYP REPAIR, & P.E. & WRESTLING RMS
|
INSP - Conference | 9/13/1996 | 9/13/1996 | 9/13/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - RE CLG GRID DETAILS
|
INSP - Conference | 9/11/1996 | 9/11/1996 | 9/11/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED SPEC INSP REPORTS
|
INSP-Sprinkler Rough-in/Hydro | 9/9/1996 | 9/9/1996 | 9/9/1996 | P | PASS |
|
|
|
09/09/96 405 - READY AFTER 3:00 TODAY-WILL PUMP UP AROUND 2:00
|
INSP - Carpentry | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - WENT OVER PLAN & SPECS; CHK'D RETRO FIT/ REPAIR NOTED ON C/N ENG'S REPORT & SPEC INSP OK. KEEP C/N
|
INSP - Carpentry | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET MIKE, NEW SUPT...TOLD TO CHK FIRESTOPPING & 2HR CONST
|
INSP - Conference | 8/6/1996 | | 8/6/1996 | | PASS |
|
|
|
met w/ arch.spec insp m.t.i...eng. and b.u.s.d. reps to discuss retro-fitting repairs at Capitol High Gym, etc...process to proceed. Stamped drawings and arch's approval per previous correction
|
INSP - Ceiling grid | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PART |
|
|
|
07/18/96 338 - ok to cover insulated large room hall and room with sha insulate only
|
INSP - Carpentry | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | PART |
Carl Dependahl
|
|
|
07/08/96 340 - CHK'D CLG GRID AT VESTIBULE. DISCUSSED OVERSIZE DOORS(FIR
|
INSP - Carpentry | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED ENG'S FULL STRUCT REPORT...TENTED LITES OK PER SCHMER,C
|
INSP - Carpentry | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED ENG'S FULL STRUCT REPORT...TENTED LITES OK PER SCHMER,C
|
INSP - Ceiling grid | 6/17/1996 | 6/18/1996 | 6/18/1996 | P | PART |
Carl Dependahl
|
|
|
06/18/96 340 - CEILING FRAME P.M. clg grid ok, is moving j-boxes into light "tents" due to elec c/n per To says Jim Schmer has ok'd cover of boxes at gym lid
|
INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - met w/ new supt... discussed plan & eng'g reqs, need submitt of existing structure.
|
INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - met w/ new supt... discussed plan & eng'g reqs, need submitt of existing structure.
|
INSP - Wall cover | 6/12/1996 | 6/13/1996 | 6/13/1996 | A | PART |
Carl Dependahl
|
|
|
06/13/96 340 - THURS.A.M. CHK'D GYP ASSY AT MEZZ LID; OK,NEED 1HR SEALANT AT PENETRATIONS. NEW SUPT: BUD
|
INSP - Conference | 6/6/1996 | 6/6/1996 | 6/6/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W BOB MINNAS. JOB SUPT...REC'D ENG'S LETTER RE C/N, STILL NE LID AT RECESSED LIGHTS. KEEP C/N
|
INSP - Conference | 6/6/1996 | 6/6/1996 | 6/6/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W BOB MINNAS. JOB SUPT...REC'D ENG'S LETTER RE C/N, STILL NE LID AT RECESSED LIGHTS. KEEP C/N
|
INSP - Conference | 6/3/1996 | 6/3/1996 | 6/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REC'D ARCH'S RESPONSE TO C/N: ENG'G REVIEW OF EXISTING STRUC MONITOR FOR CHANGES REQ'D
|
INSP - Conference | 5/28/1996 | 5/28/1996 | 5/28/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N, NEED DETAIL FOR 1HR AT LITES IN LID & ENG'S REPORT
|
INSP - Conference | 5/28/1996 | 5/28/1996 | 5/28/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N, NEED DETAIL FOR 1HR AT LITES IN LID & ENG'S REPORT
|
INSP - Carpentry | 5/24/1996 | 5/24/1996 | 5/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - ENG. IS RE EVALUATING STRUCTURE FOR BRG OF ROOF ON HOLLOW MA CHK'D HAT CHANNEL AT MEZZ LID, OK TO COVER PART...NEED SUBMITTAL ON LITE
|
INSP - Conference | 5/23/1996 | 5/24/1996 | 5/24/1996 | A | PART |
Carl Dependahl
|
|
|
05/24/96 340 - HE CALLED & WANTED A "CONFERENCE". HE CALLED AGAIN LATER INSPECTION....SHEETROCK. GUESS YOU CAN FIGURE OUT WHAT HE REALLY WANTS. need submittal for lights in 1hr lid
|
INSP - Conference | 5/22/1996 | 5/22/1996 | 5/22/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED RESPONSE TO C/N W/ BOB MINNIS
|
INSP - Carpentry | 5/17/1996 | 5/17/1996 | 5/17/1996 | P | PART |
Carl Dependahl
|
|
|
05/17/96 340 - DISCUSSED PREVIOUS C/N: NEED RESPONSE FROM ARCH...CHK'D N PILASTERS,& SPEC. INSP. REPORTS. NEED TO HAVE ARCH'S OK FOR ANCHORAGE OF SYSTEM TO UNGROUTED EXISTING MASONRY. KEEP C/N.
|
INSP - Framing/Rough-in | 5/13/1996 | 5/13/1996 | 5/13/1996 | P | FAIL |
Carl Dependahl
|
|
|
05/13/96 340 - WANTED TO LET YOU KNOW THEY ARE GOING FULL BORE..THE SPEC BEEN NOTIFIED...PLACED C/N RE: ROOF EXISTING WALL CONNECTION & OMITTED W PLATES AT PILASTERS; NEED ENG'S OK
|
INSP - Conference | 5/3/1996 | 5/3/1996 | 5/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - WENT OVER SPECS, INSP REQ'S W BOB MINNAS, SUPT...NEED CONTIN GROUTING, PERIODIC FOR WELDS. WIP
|
INSP - Flatwork | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | PART |
Carl Dependahl
|
|
|
05/02/96 340 - slab.... SPECIAL INSPECTOR SCHEDULED.
|
INSP - Foundation | 4/25/1996 | 4/26/1996 | 4/26/1996 | A | PART |
Carl Dependahl
|
|
|
04/26/96 340 - FLOOR..THEY ALREADY NOTIFIED THE SPECIAL INSPECTOR.
|
INSP - Flatwork | 4/22/1996 | 4/22/1996 | 4/22/1996 | P | PASS |
Carl Dependahl
|
|
|
04/22/96 340 - THEY WERE POURING SLAB AT 10:00 THIS AM SLAB OK, CHK'D PLAN W/ BOB MINNAS, NEW SUP'T
|
INSP - Flatwork | 4/19/1996 | 4/19/1996 | 4/19/1996 | P | FAIL |
|
|
|
04/19/96 338 - slab - special inspector has been notified. pm poured w
|
INSP - Flatwork | 4/16/1996 | 4/17/1996 | 4/17/1996 | P | PART |
Carl Dependahl
|
|
|
04/17/96 340 - SLABS - SPECIAL INSPECTOR HAS BEEN NOTIFIED. EARLY PM TALKED W/ DAVE CRAMM, OK
|
INSP - Footings | 4/12/1996 | 4/15/1996 | 4/15/1996 | P | PART |
Carl Dependahl
|
|
|
04/12/96 340 - FOOTING & FND.CONCRETE POUR AT 1 PM. SPECIAL INSPECTOR CA DICUSSED INSP W/ DAVE CRAMM OF MTI
|
INSP - Foundation | 4/8/1996 | 4/9/1996 | 4/15/1996 | P | PART |
Carl Dependahl
|
|
|
04/09/96 340 - 1 P.M. CHANGED FROM 8:30 A.M.
|
INSP - Foundation | 4/8/1996 | 4/9/1996 | 4/15/1996 | A | PART |
Carl Dependahl
|
|
|
04/09/96 340 - CONTRACTOR CALLED AND CHANGED THE TIME FROM 8:30 TO 1 PM. TOLD CONT NEED SPEC INSP PRIOR TO POUR...REBAR LOOKS OK
|
INSP - Foundation | 4/11/1996 | 4/11/1996 | 4/11/1996 | P | FAIL |
|
|
|
04/11/96 338 - POURING 14' OF CONCRETE AROUND 1 P.M. THE SPECIAL INSP. SAID THAT SPECIAL INSP NOT REQUIRED. TOLD THE SUPER TO CONTACT THE CORR INSPECTOR AND RESOLVE THIS PROBLEM ASAP
|
INSP - Conference | 4/8/1996 | 4/8/1996 | 4/8/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET NEW SUPER, BOB MINNAS (?)....CHK'D SPEC INSP LOGS, EXPLA PROCEDURE
|
INSP - Foundation | 3/27/1996 | 3/27/1996 | 3/27/1996 | P | PART |
Carl Dependahl
|
|
|
03/27/96 340 - FND. STEM WALL HE SAID YOU SAID AROUND 1:30 TODAY....... CHK'D PLAN W/ SUPER & CARLSON, BUSD PROJ MGR; HAS SPEC INSP
|
INSP - Conference | 3/22/1996 | 3/22/1996 | 3/22/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CAPITOL HIGH GYM ADD'N CHK'D SPEC INSP LOGS, DISCUSSED INSP PROCESS W/ CONCRETE FOREMAN\
|
INSP - Footings | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | PART |
Carl Dependahl
|
|
|
03/13/96 340 - THEY HAVE SPECIAL INSPECTION.
|