Permit Information
Permit NumberBLD95-01716
StatusFinaled
Name CAPITAL HIGH SCHOOL (GYMNASIUM
Site Address 8055 W GODDARD RD
Project Name 
Customer Number 
ePlanReviewNo
Description
Capital High School Gymnasium. To construct a 7,730 square foot addition as approved by the State of Idaho Department of Labor and Industrial Services. All additional conditions and questions are to be handled by the Boise City Building Department, Inspection Division and the Boise City Fire Department. C.U.#68-95, P.C.#590-95. DAR
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 3/30/19983/30/1998 DONE
Details
INSP - Conference3/3/19973/3/19973/3/1997 PASS
DetailsCarl Dependahl
/ / 340 - NEED CHK W/ CATHY W. IF ALL SIGS NOW ON CARD
INSP - Occupancy Sign-off11/22/199611/25/199611/25/1996 PASS
Insp. by Art Yingling (AA-103-95); Signed Final - complies with Staff Level Approval.
INSP - Final11/22/199611/22/199611/22/1996 PART
DetailsCarl Dependahl
/ / 340 - final of 11-21-96 signed off in error...need Pub. wks & p&z
INSP - Framing/Rough-in11/22/199611/22/199611/22/1996 PASS
DetailsCarl Dependahl
/ / 340 - frame ok...entry made for finaal insp of 11-21-96
INSP - Conference11/21/199611/21/199611/21/1996 PASS
DetailsCarl Dependahl
/ / 340 - W/ SHELBY, SUPT FOR CONNOLY RE ENG'G TO BE SUBMITTED AT FINA
INSP - Final11/20/199611/21/199611/21/1996APASS
DetailsCarl Dependahl
11/21/96 340 - REC'D ENG'G FOR WALL REINFORCEMENT RETRO FIT; OK FOR C/O
INSP - Final11/20/199611/20/199611/20/1996PPASS
DetailsJoe Tawney
11/20/96 406 - 3 p.m. appointment. GIL - PAGER ###-#### OK FOR PERM OCC OR LETTR OF COMP
INSP - Final11/12/199611/12/199611/12/1996 FAIL
DetailsJoe Tawney
11/08/96 406 - WANTS INSP.AFTER 3PM. CALL GIL AT DIG.PAGER ###-####. FAILED PREACTION SPKLR SYSTEM NOT OPERABLE
INSP - Conference11/5/199611/5/199611/5/1996 PASS
DetailsCarl Dependahl
/ / 340 - RE T/O FOR GYM...TOLD TO GET ALL OTHER INSP'S & SIGN OFFS
INSP - Conference11/5/199611/5/199611/5/1996 PASS
DetailsCarl Dependahl
/ / 340 - RE T/O FOR GYM...TOLD TO GET ALL OTHER INSP'S & SIGN OFFS
INSP - Ceiling grid9/30/199610/1/199610/1/1996APART
DetailsCarl Dependahl
09/30/96 340 - PART; UPPER STAIR LANDING AREA, LOBBY 1ST FL SOUTH. NEED AT UPPER LANDING & SEAL CONDUIT, PIPE PENETRATIONS. OK TO DROP TILE
INSP - Carpentry9/24/19969/24/19969/24/1996 PART
DetailsCarl Dependahl
/ / 340 - CHK FIRESTOPS ABOVE NON-RATED CEILING,NEED TO SEAL AT DUCT A CONTINUE
INSP - Ceiling grid9/20/19969/23/19969/23/1996APART
DetailsCarl Dependahl
09/20/96 340 - PART, CORRIDOR & STAIR LID AT EAST SIDE, STAIR AT NW. NEE AT CHASE NW CORNER
INSP - Ceiling grid9/17/19969/17/19969/17/1996PPART
DetailsCarl Dependahl
09/17/96 340 - suspended ceiling... PART, PE & WRESTLING RMS; FIRESTOPS AT FINAL. SEISMIC OK
INSP - Ceiling grid9/13/19969/16/19969/16/1996PFAIL
DetailsCarl Dependahl
09/13/96 340 - EARLY P.M. ..C/N, NEED COMPLETE FIRESTOPS, GYP REPAIR, & P.E. & WRESTLING RMS
INSP - Conference9/13/19969/13/19969/13/1996 PART
DetailsCarl Dependahl
/ / 340 - RE CLG GRID DETAILS
INSP - Conference9/11/19969/11/19969/11/1996 PASS
DetailsCarl Dependahl
/ / 340 - NEED SPEC INSP REPORTS
INSP-Sprinkler Rough-in/Hydro9/9/19969/9/19969/9/1996PPASS
Details
09/09/96 405 - READY AFTER 3:00 TODAY-WILL PUMP UP AROUND 2:00
INSP - Carpentry9/5/19969/5/19969/5/1996 PART
DetailsCarl Dependahl
/ / 340 - WENT OVER PLAN & SPECS; CHK'D RETRO FIT/ REPAIR NOTED ON C/N ENG'S REPORT & SPEC INSP OK. KEEP C/N
INSP - Carpentry9/3/19969/3/19969/3/1996 PASS
DetailsCarl Dependahl
/ / 340 - MET MIKE, NEW SUPT...TOLD TO CHK FIRESTOPPING & 2HR CONST
INSP - Conference8/6/1996 8/6/1996 PASS
met w/ arch.spec insp m.t.i...eng. and b.u.s.d. reps to discuss retro-fitting repairs at Capitol High Gym, etc...process to proceed. Stamped drawings and arch's approval per previous correction
INSP - Ceiling grid7/18/19967/18/19967/18/1996PPART
Details
07/18/96 338 - ok to cover insulated large room hall and room with sha insulate only
INSP - Carpentry7/8/19967/8/19967/8/1996PPART
DetailsCarl Dependahl
07/08/96 340 - CHK'D CLG GRID AT VESTIBULE. DISCUSSED OVERSIZE DOORS(FIR
INSP - Carpentry6/28/19966/28/19966/28/1996 PASS
DetailsCarl Dependahl
/ / 340 - NEED ENG'S FULL STRUCT REPORT...TENTED LITES OK PER SCHMER,C
INSP - Carpentry6/28/19966/28/19966/28/1996 PASS
DetailsCarl Dependahl
/ / 340 - NEED ENG'S FULL STRUCT REPORT...TENTED LITES OK PER SCHMER,C
INSP - Ceiling grid6/17/19966/18/19966/18/1996PPART
DetailsCarl Dependahl
06/18/96 340 - CEILING FRAME P.M. clg grid ok, is moving j-boxes into light "tents" due to elec c/n per To says Jim Schmer has ok'd cover of boxes at gym lid
INSP - Conference6/17/19966/17/19966/17/1996 PASS
DetailsCarl Dependahl
/ / 340 - met w/ new supt... discussed plan & eng'g reqs, need submitt of existing structure.
INSP - Conference6/17/19966/17/19966/17/1996 PASS
DetailsCarl Dependahl
/ / 340 - met w/ new supt... discussed plan & eng'g reqs, need submitt of existing structure.
INSP - Wall cover6/12/19966/13/19966/13/1996APART
DetailsCarl Dependahl
06/13/96 340 - THURS.A.M. CHK'D GYP ASSY AT MEZZ LID; OK,NEED 1HR SEALANT AT PENETRATIONS. NEW SUPT: BUD
INSP - Conference6/6/19966/6/19966/6/1996 PASS
DetailsCarl Dependahl
/ / 340 - W BOB MINNAS. JOB SUPT...REC'D ENG'S LETTER RE C/N, STILL NE LID AT RECESSED LIGHTS. KEEP C/N
INSP - Conference6/6/19966/6/19966/6/1996 PASS
DetailsCarl Dependahl
/ / 340 - W BOB MINNAS. JOB SUPT...REC'D ENG'S LETTER RE C/N, STILL NE LID AT RECESSED LIGHTS. KEEP C/N
INSP - Conference6/3/19966/3/19966/3/1996 PASS
DetailsCarl Dependahl
/ / 340 - REC'D ARCH'S RESPONSE TO C/N: ENG'G REVIEW OF EXISTING STRUC MONITOR FOR CHANGES REQ'D
INSP - Conference5/28/19965/28/19965/28/1996 FAIL
DetailsCarl Dependahl
/ / 340 - C/N, NEED DETAIL FOR 1HR AT LITES IN LID & ENG'S REPORT
INSP - Conference5/28/19965/28/19965/28/1996 FAIL
DetailsCarl Dependahl
/ / 340 - C/N, NEED DETAIL FOR 1HR AT LITES IN LID & ENG'S REPORT
INSP - Carpentry5/24/19965/24/19965/24/1996 PART
DetailsCarl Dependahl
/ / 340 - ENG. IS RE EVALUATING STRUCTURE FOR BRG OF ROOF ON HOLLOW MA CHK'D HAT CHANNEL AT MEZZ LID, OK TO COVER PART...NEED SUBMITTAL ON LITE
INSP - Conference5/23/19965/24/19965/24/1996APART
DetailsCarl Dependahl
05/24/96 340 - HE CALLED & WANTED A "CONFERENCE". HE CALLED AGAIN LATER INSPECTION....SHEETROCK. GUESS YOU CAN FIGURE OUT WHAT HE REALLY WANTS. need submittal for lights in 1hr lid
INSP - Conference5/22/19965/22/19965/22/1996 PASS
DetailsCarl Dependahl
/ / 340 - DISCUSSED RESPONSE TO C/N W/ BOB MINNIS
INSP - Carpentry5/17/19965/17/19965/17/1996PPART
DetailsCarl Dependahl
05/17/96 340 - DISCUSSED PREVIOUS C/N: NEED RESPONSE FROM ARCH...CHK'D N PILASTERS,& SPEC. INSP. REPORTS. NEED TO HAVE ARCH'S OK FOR ANCHORAGE OF SYSTEM TO UNGROUTED EXISTING MASONRY. KEEP C/N.
INSP - Framing/Rough-in5/13/19965/13/19965/13/1996PFAIL
DetailsCarl Dependahl
05/13/96 340 - WANTED TO LET YOU KNOW THEY ARE GOING FULL BORE..THE SPEC BEEN NOTIFIED...PLACED C/N RE: ROOF EXISTING WALL CONNECTION & OMITTED W PLATES AT PILASTERS; NEED ENG'S OK
INSP - Conference5/3/19965/3/19965/3/1996 PASS
DetailsCarl Dependahl
/ / 340 - WENT OVER SPECS, INSP REQ'S W BOB MINNAS, SUPT...NEED CONTIN GROUTING, PERIODIC FOR WELDS. WIP
INSP - Flatwork5/2/19965/2/19965/2/1996PPART
DetailsCarl Dependahl
05/02/96 340 - slab.... SPECIAL INSPECTOR SCHEDULED.
INSP - Foundation4/25/19964/26/19964/26/1996APART
DetailsCarl Dependahl
04/26/96 340 - FLOOR..THEY ALREADY NOTIFIED THE SPECIAL INSPECTOR.
INSP - Flatwork4/22/19964/22/19964/22/1996PPASS
DetailsCarl Dependahl
04/22/96 340 - THEY WERE POURING SLAB AT 10:00 THIS AM SLAB OK, CHK'D PLAN W/ BOB MINNAS, NEW SUP'T
INSP - Flatwork4/19/19964/19/19964/19/1996PFAIL
Details
04/19/96 338 - slab - special inspector has been notified. pm poured w
INSP - Flatwork4/16/19964/17/19964/17/1996PPART
DetailsCarl Dependahl
04/17/96 340 - SLABS - SPECIAL INSPECTOR HAS BEEN NOTIFIED. EARLY PM TALKED W/ DAVE CRAMM, OK
INSP - Footings4/12/19964/15/19964/15/1996PPART
DetailsCarl Dependahl
04/12/96 340 - FOOTING & FND.CONCRETE POUR AT 1 PM. SPECIAL INSPECTOR CA DICUSSED INSP W/ DAVE CRAMM OF MTI
INSP - Foundation4/8/19964/9/19964/15/1996PPART
DetailsCarl Dependahl
04/09/96 340 - 1 P.M. CHANGED FROM 8:30 A.M.
INSP - Foundation4/8/19964/9/19964/15/1996APART
DetailsCarl Dependahl
04/09/96 340 - CONTRACTOR CALLED AND CHANGED THE TIME FROM 8:30 TO 1 PM. TOLD CONT NEED SPEC INSP PRIOR TO POUR...REBAR LOOKS OK
INSP - Foundation4/11/19964/11/19964/11/1996PFAIL
Details
04/11/96 338 - POURING 14' OF CONCRETE AROUND 1 P.M. THE SPECIAL INSP. SAID THAT SPECIAL INSP NOT REQUIRED. TOLD THE SUPER TO CONTACT THE CORR INSPECTOR AND RESOLVE THIS PROBLEM ASAP
INSP - Conference4/8/19964/8/19964/8/1996 PASS
DetailsCarl Dependahl
/ / 340 - MET NEW SUPER, BOB MINNAS (?)....CHK'D SPEC INSP LOGS, EXPLA PROCEDURE
INSP - Foundation3/27/19963/27/19963/27/1996PPART
DetailsCarl Dependahl
03/27/96 340 - FND. STEM WALL HE SAID YOU SAID AROUND 1:30 TODAY....... CHK'D PLAN W/ SUPER & CARLSON, BUSD PROJ MGR; HAS SPEC INSP
INSP - Conference3/22/19963/22/19963/22/1996 PASS
DetailsCarl Dependahl
/ / 340 - CAPITOL HIGH GYM ADD'N CHK'D SPEC INSP LOGS, DISCUSSED INSP PROCESS W/ CONCRETE FOREMAN\
INSP - Footings3/13/19963/13/19963/13/1996PPART
DetailsCarl Dependahl
03/13/96 340 - THEY HAVE SPECIAL INSPECTION.