INSP - Final | 9/19/1996 | 9/19/1996 | 9/19/1996 | | PASS |
|
|
|
Routed to Cathy for issuance of CO.
|
INSP - Final | 9/10/1996 | 9/10/1996 | 9/10/1996 | | PASS |
|
|
|
/ / 405 - hydrant installed...showed owner location of bollards to pro
|
INSP - Framing/Rough-in | 9/9/1996 | 9/9/1996 | 9/9/1996 | P | NH |
Wes Worcester
|
|
|
no one on site...no address...
|
INSP - Fire Dept. Request | 8/13/1996 | 8/13/1996 | 8/13/1996 | | PART |
|
|
|
/ / 405 - reviewed proposed alternate location of hydrant with owner.. n with DSM, hydrant needs to be located so it is visible and obvious fro road..... responded to contractor 8/13/96 11:45 am. told earl gafford t locate hydrant along bo
|
INSP - Conference | 8/8/1996 | 8/8/1996 | 8/8/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Final | 8/8/1996 | 8/8/1996 | 8/8/1996 | P | PART |
Wes Worcester
|
|
|
08/08/96 342 - need eng for dormer, truss fix for split heels at brng, b resubmittal, mech c/n, fire dept c/n, temp only
|
INSP - Final | 8/7/1996 | 8/8/1996 | 8/8/1996 | A | NR |
Wes Worcester
|
|
|
08/08/96 342 - FINAL FOR C/O ì
|
INSP - Carpentry | 8/5/1996 | 8/5/1996 | 8/5/1996 | P | FAIL |
Wes Worcester
|
|
|
firewall STILL NOT RIGHT.... WENT OVER W/CREW
|
INSP - Carpentry | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | NR |
Wes Worcester
|
|
|
still working on 1 hr wall
|
INSP - Conference | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | PART |
Wes Worcester
|
|
|
met w/phillips in plan ck
|
INSP - Framing/Rough-in | 7/31/1996 | 8/1/1996 | 8/1/1996 | A | FAIL |
Wes Worcester
|
|
|
1 hr wall done incorrectly
|
INSP - Masonry | 7/1/1996 | 7/1/1996 | 7/1/1996 | P | PASS |
Wes Worcester
|
|
|
MASONARY REBAR
|
INSP - Masonry | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Masonry | 6/21/1996 | 6/21/1996 | 6/21/1996 | | NR |
Wes Worcester
|
|
|
06/19/96 342 -
|
INSP - Masonry | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Masonry | 6/18/1996 | 6/19/1996 | 6/18/1996 | A | PASS |
Wes Worcester
|
|
|
06/18/96 342 -
|
INSP - Masonry | 6/18/1996 | 6/18/1996 | 6/18/1996 | | PASS |
Wes Worcester
|
|
|
06/18/96 342 -
|
INSP - Foundation | 5/9/1996 | 5/13/1996 | 5/7/1996 | A | PASS |
Wes Worcester
|
|
|
05/10/96 342 - READY 10:00...REBAR last of walls/foundation ok
|
INSP - Foundation | 5/8/1996 | 5/8/1996 | 5/2/1996 | P | PART |
Wes Worcester
|
|
|
05/08/96 342 - REBAR
|
INSP - Foundation | 5/7/1996 | 5/7/1996 | 5/1/1996 | P | PART |
Wes Worcester
|
|
|
05/07/96 342 - TUES. MID-P.M.
|
INSP - Foundation | 4/30/1996 | 4/30/1996 | 4/25/1996 | P | PASS |
Wes Worcester
|
|
|
04/30/96 342 - late pm
|
INSP - Conference | 4/26/1996 | 4/29/1996 | 4/23/1996 | A | PASS |
Wes Worcester
|
|
|
04/26/96 342 - MON AT 1:00 ftgs to North ok'd 4/29/96
|
INSP - Footings | 4/23/1996 | 4/23/1996 | 4/23/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - ftgs to No ok
|
INSP - Footings | 4/19/1996 | 4/22/1996 | 4/22/1996 | A | FAIL |
Wes Worcester
|
|
|
3" COVER AND 1 1/2" COVER INADEQUATE AND REMOVE MUD AND DRAIN WATER OR USE A TREME
|
INSP - Footings | 4/22/1996 | 4/19/1996 | 4/22/1996 | A | NR |
Wes Worcester
|
|
|
1st thing this am
|
INSP - Framing/Rough-in | 4/25/1996 | 4/26/1996 | 4/20/1996 | A | CANC |
Wes Worcester
|
|
|
04/26/96 342 - late morning
|
INSP - Footings | 4/20/1996 | 4/20/1996 | 4/20/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - poured w/o insp....rejected
|
INSP - Foundation | 4/19/1996 | 4/19/1996 | 4/19/1996 | P | NR |
Wes Worcester
|
|
|
fnd.rebar
|
INSP - Footings | 4/17/1996 | 4/18/1996 | 4/18/1996 | A | CANC |
Wes Worcester
|
|
|
|
INSP - Foundation | 4/22/1996 | 4/23/1996 | 4/17/1996 | A | PASS |
Wes Worcester
|
|
|
04/22/96 342 - REBAR
|
INSP - Footings | 4/17/1996 | 4/17/1996 | 4/17/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - c/c removed
|