INSP - Final | 7/11/1996 | 7/12/1996 | 7/12/1996 | P | PASS |
Wes Worcester
|
|
|
needs to do hvac boots and they were in process of so I left c/c
|
INSP - Final | 6/21/1996 | 6/21/1996 | 6/21/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 - RESENDER --
|
INSP - Final | 6/19/1996 | 6/20/1996 | 6/19/1996 | A | NR |
Wes Worcester
|
|
|
RESENDER -- needs to post bond as per Terry Records of $1000, need tempered glass, work on handrail, caulking & insulating hvac boots
|
INSP - Framing/Rough-in | 6/12/1996 | 6/13/1996 | 6/12/1996 | A | CANC |
Wes Worcester
|
|
|
06/12/96 342 - REINSPECTION frame has already been done...final maybe?
|
INSP - Energy code compliance | 3/12/1996 | 3/13/1996 | 3/13/1996 | A | PASS |
Wes Worcester
|
|
|
finishing w/vinyl vapor barrier
|
INSP - Framing/Rough-in | 3/11/1996 | 3/11/1996 | 3/11/1996 | P | PASS |
Wes Worcester
|
|
|
FRAME REINSPECTION
|
INSP - Framing/Rough-in | 3/5/1996 | 3/6/1996 | 3/6/1996 | A | FAIL |
Wes Worcester
|
|
|
10 A.M. they were late and caught me after I had posted another c/n. Numerous items still not done and engineering required for walls over 10'. I told them I would not do a punch list and for them to get the house ready for inspection. $42 reinspection fee
|
INSP - Framing/Rough-in | 3/4/1996 | 3/5/1996 | 3/5/1996 | A | NR |
Wes Worcester
|
|
|
called Barker and rescheduled for tommorrow. will call Molly w/time
|
INSP - Framing/Rough-in | 2/26/1996 | 2/27/1996 | 2/27/1996 | P | NR |
Wes Worcester
|
|
|
mech nor frame ready
|
INSP - Foundation | 1/4/1996 | 1/4/1996 | 1/4/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - still trying to get proper clearance while I was on site
|
INSP - Foundation | 1/4/1996 | 1/4/1996 | 1/4/1996 | | NR |
Wes Worcester
|
|
|
/ / 342 - still not ready at 2 pm
|
INSP - Framing/Rough-in | 1/3/1996 | 1/4/1996 | 1/4/1996 | A | NR |
Carl Dependahl
|
|
|
01/03/96 340 -
|
INSP - Foundation | 12/29/1995 | 1/2/1996 | 1/4/1996 | | NR |
Wes Worcester
|
|
|
01/02/96 342 - rebar pouring at 11:00
|
INSP - Footings | 12/22/1995 | 12/22/1995 | 12/22/1995 | | PART |
Wes Worcester
|
|
|
/ / 342 - hanging bar, waited on site for over 30 min, 2 trucks and a next time they are not ready I'm rejecting ftg and they can recall. this was called for yesterday (not close to ready), asked to recall w/time fo today. 1st call was 1
|
INSP - Footings | 12/21/1995 | 12/21/1995 | 12/21/1995 | P | NR |
Wes Worcester
|
|
|
12/21/95 342 -
|