INSP - Final | 6/17/1996 | | 6/17/1996 | | PASS |
|
|
|
final ok
|
INSP - Final | 4/18/1996 | 4/19/1996 | 4/19/1996 | A | TEMP |
|
|
|
A.M.
|
INSP - Carpentry | 2/20/1996 | 2/20/1996 | 2/20/1996 | P | PASS |
|
|
|
1 HR. FIREWALL
|
INSP - Carpentry | 2/15/1996 | 2/16/1996 | 2/16/1996 | A | PASS |
|
|
|
2 HR.FIRE WALL PENETRATION
|
INSP - Carpentry | 2/12/1996 | 2/13/1996 | 2/13/1996 | A | CANC |
|
|
|
02/13/96 338 - FIREWALLS - 2ND LAYER BY 400
|
INSP - Carpentry | 2/9/1996 | 2/9/1996 | 2/9/1996 | P | PASS |
|
|
|
02/09/96 338 - FIREWALL nailing of the 2-hr wall 1st layer
|
INSP - Masonry | 2/7/1996 | 2/7/1996 | 2/7/1996 | P | PASS |
|
|
|
02/07/96 338 -
|
INSP - Masonry | 2/6/1996 | 2/6/1996 | 2/6/1996 | P | CANC |
|
|
|
02/06/96 338 - CANCELLED BY THE CONTRACTOR SPECIAL INSP PASSED
|
INSP - Masonry | 2/1/1996 | 2/2/1996 | 2/2/1996 | A | NR |
|
|
|
02/02/96 338 -
|
INSP - Masonry | 1/30/1996 | 1/30/1996 | 1/30/1996 | P | PASS |
|
|
|
01/30/96 338 - made ok
|
INSP - Masonry | 1/26/1996 | 1/29/1996 | 1/29/1996 | A | CANC |
|
|
|
01/26/96 338 - cancelled by contractor.
|
INSP - Conference | 1/26/1996 | 1/26/1996 | 1/26/1996 | | PASS |
|
|
|
/ / 338 - ABOUT THE 1-HOUR PROP LINE WALLS
|
INSP - Masonry | 1/26/1996 | 1/26/1996 | 1/26/1996 | P | CANC |
|
|
|
01/26/96 338 - CANCELLED BY THE CONTRACTOR
|
INSP - Masonry | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PASS |
George Slane
|
|
|
/ / 38 -
|
INSP - Masonry | 1/24/1996 | 1/25/1996 | 1/25/1996 | A | FAIL |
George Slane
|
|
|
01/25/96 38 - REBAR
|
INSP - Masonry | 1/25/1996 | 1/25/1996 | 1/25/1996 | | PASS |
George Slane
|
|
|
/ / 38 -
|
INSP - Foundation | 12/19/1995 | 12/19/1995 | 12/19/1995 | P | PASS |
|
|
|
12/19/95 338 - STEM WALL SPECIAL INSP MADE OK
|
INSP - Foundation | 12/18/1995 | 12/18/1995 | 12/18/1995 | P | PASS |
|
|
|
12/18/95 338 - STEM WALL
|
INSP - Footings | 12/13/1995 | 12/14/1995 | 12/14/1995 | P | PART |
|
|
|
12/14/95 338 - grade ok r-bar to be checked by special insp.
|
INSP - Foundation | 12/12/1995 | 12/12/1995 | 12/12/1995 | P | PASS |
|
|
|
12/12/95 338 - SPECIAL INSP MADE OK
|
INSP - Footings | 12/8/1995 | 12/8/1995 | 12/8/1995 | P | PASS |
|
|
|
12/08/95 338 -
|
INSP - Conference | 11/30/1995 | 11/30/1995 | 11/30/1995 | | PASS |
|
|
|
/ / 338 - UPDATE
|
INSP - Footings | 11/29/1995 | 11/29/1995 | 11/29/1995 | P | FAIL |
Jim Storey
|
|
|
11/29/95 301 -
|