INSP - Final | 10/8/1996 | 10/8/1996 | 10/8/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL ROUTED FOR ADMIT. SIGN OFF.
|
INSP - Final | 10/8/1996 | 10/8/1996 | 10/8/1996 | | PASS |
|
|
|
/ / 405 - final, alternate hydrant plan approved
|
Permanent Occupancy | | 10/8/1996 | 10/8/1996 | | DONE |
|
|
|
|
INSP - Framing/Rough-in | 9/30/1996 | 9/30/1996 | 9/30/1996 | P | FAIL |
Jim Storey
|
|
|
09/30/96 301 - FRAME REINSPECT c/n pending
|
INSP - Final | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | FAIL |
|
|
|
PERMANENT OCCUPANCY -- THE CARD YOU SIGN IS IN THE PANEL BOX IN THE MAIN OFFICE req fire safty insp not ready fee due
|
INSP - Final | 8/26/1996 | 8/27/1996 | 8/27/1996 | A | FAIL |
Jim Storey
|
|
|
08/27/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Occupancy Sign-off | 8/26/1996 | 8/27/1996 | 8/27/1996 | A | NR |
Jim Storey
|
|
|
08/27/96 301 - PERMANENT OCCUPANCY
|
INSP - Final | 8/26/1996 | 8/26/1996 | 8/26/1996 | | FAIL |
|
|
|
/ / 405 - power systems - missing indicated hydrant, addresss not visi not striped
|
INSP - Framing/Rough-in | 6/3/1996 | 6/4/1996 | 6/4/1996 | A | PASS |
Jim Storey
|
|
|
06/03/96 301 - APPT..MID A.M. FRAM-OK FRAMING
|
INSP - Conference | 5/24/1996 | 5/24/1996 | 5/24/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - NWP -GENERAL INSPECTION - NO WORK IN PROGRESS qustions before second pha office. ok
|
INSP - Temporary occupancy | 5/16/1996 | 5/17/1996 | 5/17/1996 | A | FAIL |
Jim Storey
|
|
|
05/17/96 301 - OTH-OTHER AGENCIES NOT APPROVED MEC,ELE,PLMB.
|
INSP - Framing/Rough-in | 5/3/1996 | 5/3/1996 | 5/3/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING VERIFIED ENG. SPANS TO CALULATIONS SUBMITED ARCH. PRINT DEMITIONED CORLECTY.
|
INSP - Wall cover | 4/30/1996 | 4/30/1996 | 4/30/1996 | P | FAIL |
Jim Storey
|
|
|
04/30/96 301 - job on hold until justifcation for resubmital on mezanine is aproved.
|
INSP - Conference | 4/5/1996 | 4/5/1996 | 4/5/1996 | | FAIL |
Jim Storey
|
|
|
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED RESOLVE SPECIAL INSP.REPORT O STANDING WITH ENGINEERS DESIGN. RESUBMIT PLANS FOR CHANGE IN WORK AT MEZ
|
INSP - Ceiling grid | 3/26/1996 | 3/26/1996 | 3/26/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Conference | 3/26/1996 | 3/26/1996 | 3/26/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 -
|
INSP - Framing/Rough-in | 2/26/1996 | 2/27/1996 | 2/27/1996 | A | PART |
Jim Storey
|
|
|
frame 2.5-3 ok pending ele aproval
|