INSP - Final | 5/30/1996 | 5/30/1996 | 5/30/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/N removed...C/C #11280
|
INSP - Letter of compliance | 5/30/1996 | 5/30/1996 | 5/30/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 11280
|
INSP - Letter of compliance | 5/30/1996 | 5/30/1996 | 5/30/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/C # 11280
|
INSP - Final | 5/29/1996 | 5/29/1996 | 5/29/1996 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N Needs Mech and Plumb final and hazardous glazing located at rear hinged door.
|
INSP - Final | 5/29/1996 | 5/29/1996 | 5/29/1996 | P | CANC |
Jim Sly
|
|
|
05/29/96 316 - Cancel til 5/30...AM
|
INSP - Framing/Rough-in | 4/2/1996 | 4/2/1996 | 4/2/1996 | P | PART |
Jim Sly
|
|
|
04/02/96 316 - Electrical contractor relocating wiring and has not insta outlets and wiring in wall required in garage to create bonus room...OK to cover when elect. is re-inspected.
|
INSP - Framing/Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 | P | PASS |
Jim Sly
|
|
|
03/29/96 316 - FRAME REINSPECT OK
|
INSP - Framing/Rough-in | 3/26/1996 | 3/26/1996 | 3/26/1996 | P | FAIL |
Jim Sly
|
|
|
03/26/96 316 - Correction notice.
|
INSP - Footings | 12/20/1995 | 12/21/1995 | 12/21/1995 | A | PASS |
Jim Sly
|
|
|
Checked setbacks ...OK Poured without inspection of soil directly under footings. Jim Sly
|