INSP - Final | 7/10/1996 | 7/11/1996 | 7/11/1996 | A | PASS |
|
|
|
07/11/96 333 - final reinspect. a.m. FNL -OK FINAL
|
INSP - Letter of compliance | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PASS |
|
|
|
/ / 333 - letter #10759
|
INSP - Letter of compliance | 7/11/1996 | 7/11/1996 | 7/11/1996 | | PASS |
|
|
|
/ / 333 - letter #10759
|
INSP - Final | 7/9/1996 | 7/10/1996 | 7/11/1996 | P | FAIL |
|
|
|
07/10/96 333 - PM WED. cn
|
INSP - Energy code compliance | 4/12/1996 | 4/12/1996 | 4/12/1996 | P | PASS |
|
|
|
|
INSP - Energy code compliance | 4/11/1996 | 4/11/1996 | 4/11/1996 | P | NR |
Jim Storey
|
|
|
04/11/96 301 - TRANSPHERED TO D.WEILGE BY PHONE.
|
INSP - Framing/Rough-in | 3/13/1996 | 3/14/1996 | 3/14/1996 | A | PASS |
|
|
|
|
INSP - Framing/Rough-in | 3/4/1996 | 3/4/1996 | 3/4/1996 | P | FAIL |
|
|
|
require engineering information,calculations on steel support beams in garage and basement, steel beam in basement rest on wood in beam pocket and not connected, steel beam in garage rest on channel iron post- not connected at top or bottom
|
INSP - Conference | 12/12/1995 | 12/12/1995 | 12/12/1995 | | PASS |
|
|
|
/ / 338 - PDATE
|
INSP - Conference | 12/12/1995 | 12/12/1995 | 12/12/1995 | | PASS |
|
|
|
/ / 338 - PDATE
|