Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD95-02103
StatusFinaled
Name MICRON SEMCONDUCTOR, INC
Site Address 8000 S FEDERAL WAY
Project NameMIC #24 (FAB#4 PHS2)
Customer Number 
ePlanReviewNo
Description
(MICRON BLDG. #24)(FAB #4 PHASE 2) TO REMODEL A EXISTING AREA OF APPROXIMATELY 9864 SQUARE FEET LOCATED ON THE MAIN FLOOR AND SECOND FLOOR 5520 SQUARE FEET ALSO CONSTRUCT A 1400 SQUARE FOOT SECOND FLOOR ADDITION ALL LOCATED IN MICRON BUILDING #24. CONSTRUCTION TO BE ALL NONCOMBUSTIBLE MATERIALS, STRUCTURAL STEEL FRAMING, ELEVATED ACCESS FLOOR SYSTEMS, EIFS EXTERIOR FINISH SYSTEM, STEEL STUDS AND MICRON ALUMINUM WALL SYSTEMS, SUSPENDED CEILING SYSTEMS AND HEPA FILTER SYSTEMS, NEW JIB CRANE, CONCRETE FOUNDATIONS. NOTE! THIS BUILDING IS FULLY FIRE SPRINKLERED. ALL PER APPROVED PLANS ON FILE. RGG INITIAL CERTIFICATE OF VALUE ON FILE ELECTRICAL 2,831,793 PLG. 3,024,000 MECH. 3,311,587 COMBINED 6,335,589 FIRE SPRINKLER 192,000
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 10/11/199610/11/1996 DONE
Details
INSP - Final10/10/199610/10/199610/10/1996PPASS
DetailsJim Storey
10/10/96 301 - FNL -OK FINAL ROUTED FOR SIGN OFF ADMIT.
INSP - Final7/31/19967/31/19967/31/1996 PART
Ok for temp. occ. routed to Debbie for issuance.
INSP - Framing/Rough-in5/10/19965/10/19965/10/1996 FAIL
DetailsJim Storey
/ / 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in4/5/19964/5/19964/5/1996 PASS
DetailsJim Storey
/ / 301 - GEN -GENERAL INSPECTION WOK IN PROGESS.
INSP - Framing/Rough-in4/5/19964/5/19964/5/1996 PASS
DetailsJim Storey
/ / 301 - GEN -GENERAL INSPECTION WOK IN PROGESS.
INSP - Conference3/26/19963/26/19963/26/1996 PASS
DetailsJim Storey
/ / 301 -