INSP - Framing/Rough-in | 8/16/1996 | 8/21/1996 | 8/21/1996 | P | PASS |
Alan Hauser
|
|
|
08/21/96 350 - FRAME OK ARCHITECT AND STRUCTURAL ENG'G ARE TO DO A WALK TO BUILDING DEPARTMENT OF APPROVAL. STAIRS AS PER APPROVED PLANS
|
INSP - Foundation | 3/20/1996 | 3/20/1996 | 3/20/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Re-bar inspection..OK as per engineering notes.
|
INSP - Footings | 3/14/1996 | 3/14/1996 | 3/14/1996 | P | PART |
Jim Sly
|
|
|
03/14/96 316 - Poured W/O inspection.....2/3rds complete when I arrived Re-bar complete...cover and laps OK on what I could see.
|