INSP - Foundation | 3/21/1997 | 3/24/1997 | 3/24/1997 | A | PART |
Carl Dependahl
|
|
|
03/24/97 340 - FND. REBAR (SUMP AREA)...NW AERATION SUMP, BAR LOOKS OK
|
INSP - Footings | 3/20/1997 | 3/21/1997 | 3/20/1997 | A | PASS |
|
|
|
03/21/97 333 - SUMP AREA FTG -OK FOOTING
|
INSP - Framing/Rough-in | 3/18/1997 | 3/18/1997 | 3/18/1997 | | PASS |
Alan Hauser
|
|
|
/ / 350 - u.v. wall 1st half ok to pour, as per plan
|
INSP - Carpentry | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | PASS |
Alan Hauser
|
|
|
03/13/97 350 - beam on wall rebar clearances ok, as per plan
|
INSP - Foundation | 3/10/1997 | 3/11/1997 | 3/10/1997 | A | PASS |
|
|
|
03/11/97 333 - WALL FDN -OK FOUNDATION
|
INSP - Flatwork | 3/7/1997 | 3/10/1997 | 3/10/1997 | A | NR |
Alan Hauser
|
|
|
03/10/97 350 - SLAB no work being done at this time, talked to both contractors on site.
|
INSP - Foundation | 3/4/1997 | 3/5/1997 | 3/4/1997 | P | PART |
|
|
|
03/05/97 333 - RETAINING WALL??? ok pending special inspection report
|
INSP - Footings | 2/24/1997 | 2/25/1997 | 2/25/1997 | P | PART |
Jim Storey
|
|
|
02/25/97 301 - PENDING SPECIAL INSP. REPORT.
|
INSP - Foundation | 2/18/1997 | 2/18/1997 | 2/18/1997 | P | PART |
Jim Storey
|
|
|
02/18/97 301 - placed w/special insp. verrified w/gs
|
INSP - Foundation | 12/12/1996 | 12/12/1996 | 12/12/1996 | P | PASS |
Wes Worcester
|
|
|
FND.WALLS
|
INSP - Flatwork | 12/11/1996 | 12/11/1996 | 12/11/1996 | P | PASS |
Wes Worcester
|
|
|
mud coming at 2:30 slab pour
|
INSP - Footings | 11/18/1996 | 11/19/1996 | 11/19/1996 | A | NR |
Wes Worcester
|
|
|
apt - 11 a.m. not quite ready, called special insp to look at
|
INSP - Conference | 11/18/1996 | 11/18/1996 | 11/18/1996 | A | PART |
Wes Worcester
|
|
|
POSTPONED COLUMN INSPECTION UNTIL TUESDAY
|
INSP - Foundation | 11/18/1996 | 11/18/1996 | 11/18/1996 | A | CANC |
Wes Worcester
|
|
|
|
INSP - Foundation | 11/8/1996 | 11/12/1996 | 11/12/1996 | A | PASS |
Wes Worcester
|
|
|
BETWEEN 10 & 10:30. CONCRETE BEAM
|
INSP - Conference | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - FAXED ENG TO OFFICE FOR 2 CY POUR W/O INSPECTION
|
INSP - Foundation | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - BLK OUTS OK
|
INSP - Wall cover | 11/6/1996 | 11/7/1996 | 11/7/1996 | A | PASS |
Wes Worcester
|
|
|
11/06/96 342 - BETWEEN 11 AND 11:30
|
INSP - Footings | 11/5/1996 | 11/5/1996 | 11/5/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - still couldn't locate super, left c/n on plans and gave card
|
INSP - Foundation | 11/4/1996 | 11/5/1996 | 11/4/1996 | P | NR |
Wes Worcester
|
|
|
11/04/96 342 - LATE P.M. CONCRETE WALL
|
INSP - Conference | 11/4/1996 | 11/4/1996 | 11/4/1996 | | FAIL |
|
|
|
note: ftg poured w/o insp. Report from Gary attached to c/n issued this date for a pour on 10/30/96. I was to be rescheduled to look at, but was not sent to me. Gary was asked to look at and I talked with him @ spec ins req'mts
|
INSP - Foundation | 10/28/1996 | 10/29/1996 | 10/29/1996 | P | PART |
Wes Worcester
|
|
|
10/28/96 342 - TRAMMELS 4 P.M. APPOINTMENT
|
INSP - Foundation | 10/29/1996 | 10/29/1996 | 10/29/1996 | | NR |
|
|
|
not ready will ck tomorrow, asked to reschedule
|
INSP - Flatwork | 10/22/1996 | 10/24/1996 | 10/24/1996 | A | PART |
Wes Worcester
|
|
|
9 A.M. APPOINTMENT TRAMMELS
|
INSP - Flatwork | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | PASS |
Wes Worcester
|
|
|
EARLY P.M...BETWEEN 1:30 & 2PM.
|
INSP - Foundation | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | PART |
Wes Worcester
|
|
|
TRUMMELS. DON'T KNOW WHAT INSP.? 10 A.M.
|
INSP - Foundation | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | NR |
Wes Worcester
|
|
|
TRAMMEL
|
INSP - Foundation | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Foundation | 9/17/1996 | 9/18/1996 | 9/18/1996 | P | PASS |
Bob Archibald
|
|
|
EARLY WED.P.M. FND. WALL Covered by special inspection, spoke with contractor.
|
INSP - Foundation | 9/11/1996 | 9/16/1996 | 9/16/1996 | A | CANC |
Alan Hauser
|
|
|
09/16/96 350 - PREFER AROUND 9AM COVERED BY SPECIAL INSPECTOR ACCORDING TO BOB A.
|
INSP - Foundation | 9/9/1996 | 9/10/1996 | 9/10/1996 | A | PART |
Wes Worcester
|
|
|
WALLS REBAR READY AROUND 10:00
|
INSP - Foundation | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | PART |
Wes Worcester
|
|
|
TRAMMEL Joel to call @ special insp procedures
|
INSP - Foundation | 8/29/1996 | 8/29/1996 | 8/29/1996 | P | PART |
Wes Worcester
|
|
|
APPOINTMENT BETWEEN 1:30 & 2 P.M.
|
INSP - Conference | 8/12/1996 | 8/12/1996 | 8/12/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - met w/Joel ref: cover of even small pours
|
INSP - Flatwork | 8/12/1996 | 8/12/1996 | 8/12/1996 | P | PART |
Wes Worcester
|
|
|
08/12/96 342 - 1:30 p.m. pads trammels
|
INSP - Flatwork | 8/9/1996 | 8/9/1996 | 8/9/1996 | P | PART |
Wes Worcester
|
|
|
08/09/96 342 - slab 1:30 p.m. appointment
|
INSP - Conference | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PART |
Wes Worcester
|
|
|
discussed using 100 psf exit load on walkway at ras bldg
|
INSP - Foundation | 8/7/1996 | 8/7/1996 | 8/7/1996 | P | PART |
Wes Worcester
|
|
|
wed. 2 p.m. appointment to pipe penetrations ok on East wall
|
INSP - Flatwork | 7/30/1996 | 7/30/1996 | 7/30/1996 | P | PASS |
Wes Worcester
|
|
|
floor slab. 4 P.M.
|
INSP - Conference | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | PASS |
Wes Worcester
|
|
|
2pm appointment
|
INSP - Footings | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Site Preparation | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | PART |
Wes Worcester
|
|
|
still trying to water down rd mix and get 3" clearance
|
INSP - Footings | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Footings | 6/28/1996 | 6/28/1996 | 6/28/1996 | P | PASS |
Wes Worcester
|
|
|
1:30-2 p.m.
|
INSP - Foundation | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Wall cover | 6/25/1996 | 6/25/1996 | 6/25/1996 | P | NR |
Wes Worcester
|
|
|
AT 2PM PER YOUR REQUEST.
|
INSP - Foundation | 6/17/1996 | 6/18/1996 | 6/17/1996 | A | PART |
Wes Worcester
|
|
|
06/17/96 342 - 10:30 APPOINTMENT, TUESDAY. TRAMMEL CONSTRUCTION CO.
|
INSP - Foundation | 6/12/1996 | 6/12/1996 | 6/12/1996 | P | PART |
Wes Worcester
|
|
|
06/12/96 342 - fnd. & beam. 2 P.M.
|
INSP - Foundation | 6/6/1996 | 6/6/1996 | 6/6/1996 | P | PART |
Wes Worcester
|
|
|
06/06/96 342 - 1:30 P.M. sumo pump wall
|
INSP - Carpentry | 6/4/1996 | 6/4/1996 | 5/29/1996 | P | PART |
Wes Worcester
|
|
|
06/04/96 342 - INSPECTION IS FOR "SUMP".....
|
INSP - Conference | 5/29/1996 | 5/29/1996 | 5/29/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - Kelly w/Trammel has an attitude problem. He stormed off whil in progress w/Joel about concrete pour in moving water and cover issue.
|
INSP - Footings | 5/29/1996 | 5/29/1996 | 5/29/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - Agreement w/ asst Trammel coordinator that they are to get a Joel is to verify that, as well as correct conditions for a pour in wate met as outlined in the approved plan and UBC criteria. Also agreed to ha ready all future ite
|
INSP - Footings | 5/29/1996 | 5/29/1996 | 5/29/1996 | | FAIL |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Footings | 6/3/1996 | 6/3/1996 | 5/28/1996 | P | NR |
Wes Worcester
|
|
|
06/03/96 342 - TRAMMELS
|
INSP - Footings | 5/28/1996 | 5/28/1996 | 5/28/1996 | P | NH |
Jim Sly
|
|
|
05/28/96 316 - TRAMMELS -LATE P.M. Inspected by special inspector... Joel Hethorn.
|
INSP - Footings | 5/30/1996 | 5/31/1996 | 5/25/1996 | A | NR |
Wes Worcester
|
|
|
05/30/96 342 - LATE A.M. TRAMMELS
|
INSP - Set-back | 5/25/1996 | 5/25/1996 | 5/25/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - wall poured w/o insp...talked to J Sly and he told them to g would look at it. that will not happen again..Joel is a special insp onl
|
INSP - Footings | 5/21/1996 | 5/21/1996 | 5/15/1996 | P | CANC |
Wes Worcester
|
|
|
05/21/96 342 - contractor called to cancel Request for late p.m.
|
INSP - Footings | 4/12/1996 | 4/15/1996 | 5/15/1996 | A | PART |
Wes Worcester
|
|
|
hairpin clearance insufficient
|
INSP - Footings | 5/16/1996 | 5/17/1996 | 5/11/1996 | P | NR |
Wes Worcester
|
|
|
05/16/96 342 -
|
INSP - Foundation | 5/11/1996 | 5/11/1996 | 5/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - getting cover will ck back mon am
|
INSP - Foundation | 5/11/1996 | 5/11/1996 | 5/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - getting cover will ck back mon am
|
INSP - Footings | 4/29/1996 | 4/30/1996 | 4/30/1996 | A | PART |
Wes Worcester
|
|
|
LATE AM
|
INSP - Foundation | 4/29/1996 | 4/30/1996 | 4/30/1996 | A | PART |
Wes Worcester
|
|
|
LATE AM
|
INSP - Footings | 4/24/1996 | 4/24/1996 | 4/19/1996 | P | PART |
Wes Worcester
|
|
|
04/24/96 342 - EARLY PM pouring in water w/tremme and maintaining min cl
|
INSP - Footings | 4/18/1996 | 4/18/1996 | 4/18/1996 | P | PART |
Wes Worcester
|
|
|
POURING AROUND 1 P.M. short wall section by effluent channel
|
INSP - Footings | 4/17/1996 | 4/17/1996 | 4/17/1996 | P | PASS |
Wes Worcester
|
|
|
I TOLD THEM IF FEE WASN'T PAID - NO INSPECTION WILL BE MADE..... TRAMMEL
|
INSP - Footings | 4/16/1996 | 4/17/1996 | 4/17/1996 | A | FAIL |
Wes Worcester
|
|
|
KELLY WILSON - TRAMEL CONST. SAID YOU SAID 1ST THING IN THE A.M....inadequate cover, not ready yesterday... $42 reinspection fee due
|
INSP - Footings | 4/17/1996 | 4/17/1996 | 4/17/1996 | P | PASS |
Wes Worcester
|
|
|
$40 reinspection fee due
|
INSP - Foundation | 4/17/1996 | 4/17/1996 | 4/17/1996 | P | PASS |
Wes Worcester
|
|
|
$40 reinspection fee paid
|
INSP - Foundation | 4/17/1996 | 4/17/1996 | 4/17/1996 | P | PASS |
Wes Worcester
|
|
|
FND. REBAR. WED.PM. CONTRACT. NORTHWEST THIS IS THE ONE YOU ARE TO GET THE RIGHT PERMIT NUMBER FROM.
|
INSP - Footings | 4/16/1996 | 4/16/1996 | 4/16/1996 | P | NR |
Wes Worcester
|
|
|
nr will recall for am and wants to pour @ 11am
|
INSP - Footings | 4/8/1996 | 4/8/1996 | 4/8/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Footings | 4/4/1996 | 4/4/1996 | 4/4/1996 | P | FAIL |
Wes Worcester
|
|
|
poured w/o insp. Special Inspector did look at it and will sign off as to that pour. Notified Super not to pour until inspected
|
INSP - Footings | 3/25/1996 | 3/26/1996 | 3/23/1996 | A | PART |
Wes Worcester
|
|
|
03/26/96 342 - special inspector on site
|
INSP - Footings | 3/20/1996 | 3/21/1996 | 3/21/1996 | A | PART |
Wes Worcester
|
|
|
ck clearance and compaction effort, in process of finishing, special inspector on site
|
INSP - Footings | 3/13/1996 | 3/13/1996 | 3/13/1996 | P | PART |
Wes Worcester
|
|
|
late pm. what was done looked ok. Special insp on site
|
INSP - Footings | 3/6/1996 | 3/11/1996 | 3/11/1996 | P | PART |
Wes Worcester
|
|
|
spec insp on site
|
INSP - Footings | 3/4/1996 | 3/5/1996 | 3/5/1996 | A | NR |
Wes Worcester
|
|
|
did not find Cox and forms at all 3 areas to be poured not ready
|
INSP - Foundation | 2/29/1996 | 3/1/1996 | 3/1/1996 | A | PART |
Wes Worcester
|
|
|
LATE A.M. REBAR, ETC. spec insp on site, partial pour ok
|