Permanent Occupancy | | 1/16/1997 | 1/16/1997 | | DONE |
|
|
|
|
INSP - Final | 1/16/1997 | | 1/16/1997 | | PASS |
|
|
|
|
INSP - Conference | 1/13/1997 | 1/13/1997 | 1/13/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - OK, REQUESTED BOB A. TO INSP???
|
INSP - Final | 1/10/1997 | 1/13/1997 | 1/13/1997 | A | NR |
Carl Dependahl
|
|
|
01/13/97 340 - LATE A.M. CALL LEONARD @ ###-####...SENT IN ERROR, REFER
|
INSP - Final | 1/10/1997 | 1/13/1997 | 1/13/1997 | A | PART |
|
|
|
CONDO. UNIT G2 need street sign, unit 202 loft detector not connected
|
INSP - Final | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | PASS |
|
|
|
reinspect, c/n corrected
|
INSP - Final | 1/13/1997 | | 1/13/1997 | | FAIL |
|
|
|
CN issued. Signatures required also.
|
INSP - Energy code compliance | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
|
|
|
09/26/96 400 - UNIT 101 -102-202-203.
|
INSP - Framing/Rough-in | 9/19/1996 | 9/20/1996 | 9/20/1996 | P | PASS |
|
|
|
09/20/96 400 - UNIT 101
|
INSP - Framing/Rough-in | 9/19/1996 | 9/19/1996 | 9/19/1996 | P | FAIL |
|
|
|
G-2 #101-102-202-203
|
INSP - Energy code compliance | 7/23/1996 | 7/23/1996 | 7/23/1996 | P | PASS |
|
|
|
07/23/96 333 - bath party wall and ceiling only FRAM-OK FRAMING INSL-OK INSULATION
|
INSP - Framing/Rough-in | 7/8/1996 | 7/8/1996 | 7/8/1996 | P | FAIL |
|
|
|
07/08/96 333 - cn placed
|
INSP - Carpentry | 6/23/1996 | 6/23/1996 | 6/23/1996 | | PASS |
|
|
|
/ / 400 - walk thru with james
|
INSP - Carpentry | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
|
|
|
/ / 400 - walk thru with james unit G2
|
INSP - Carpentry | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
|
|
|
/ / 400 - walk thru with james unit G2
|
INSP - Conference | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
|
|
|
/ / 400 - confer with super&subs
|
INSP - Foundation | 5/28/1996 | 5/29/1996 | 5/29/1996 | P | CANC |
Dave Lightfoot
|
|
|
05/28/96 337 - PM EARLY G2
|
INSP - Footings | 5/23/1996 | 5/24/1996 | 5/24/1996 | A | PASS |
|
|
|
05/23/96 400 - EARLY A.M. setbacks seem ok
|