Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD95-02218
StatusFinaled
Name OVERLOOK CONDO'S
Site Address 5122 S SURPRISE WAY
Project NameOVERLOOK
Customer Number 
ePlanReviewNo
Description
To build the SOUTHWEST portion (5262 sf) of the two story structure containing one each of the living units A (1055sf) and D (1268sf) on the FIRST floor and one each of living units E (1758 sf) and B (1181 sf) on the SECOND floor, separated from the remaining structure by AREA SEPARATION WALLS, as per approved plans and attached requirement lists. (First Floor=2323 sf) (Second Floor=2939 sf with lofts). A separate Plumbing, Mechanical, and Electrical Permit must be purchased for this project. A letter of Compliance must be obtained before occupying this space. CU-45-95. ACHD #96-0497. Plan Check # 657-95. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 1/16/19971/16/1997 DONE
Details
INSP - Final1/16/1997 1/16/1997 PASS
INSP - Conference1/13/19971/13/19971/13/1997 PASS
DetailsCarl Dependahl
/ / 340 - OK, REQUESTED BOB A. TO INSP???
INSP - Final1/10/19971/13/19971/13/1997ANR
DetailsCarl Dependahl
01/13/97 340 - LATE A.M. CALL LEONARD @ ###-####...SENT IN ERROR, REFER
INSP - Final1/10/19971/13/19971/13/1997APART
Details
CONDO. UNIT G2 need street sign, unit 202 loft detector not connected
INSP - Final1/13/19971/13/19971/13/1997PPASS
Details
reinspect, c/n corrected
INSP - Final1/13/1997 1/13/1997 FAIL
CN issued. Signatures required also.
INSP - Energy code compliance9/26/19969/26/19969/26/1996PPASS
Details
09/26/96 400 - UNIT 101 -102-202-203.
INSP - Framing/Rough-in9/19/19969/20/19969/20/1996PPASS
Details
09/20/96 400 - UNIT 101
INSP - Framing/Rough-in9/19/19969/19/19969/19/1996PFAIL
Details
G-2 #101-102-202-203
INSP - Energy code compliance7/23/19967/23/19967/23/1996PPASS
Details
07/23/96 333 - bath party wall and ceiling only FRAM-OK FRAMING INSL-OK INSULATION
INSP - Framing/Rough-in7/8/19967/8/19967/8/1996PFAIL
Details
07/08/96 333 - cn placed
INSP - Carpentry6/23/19966/23/19966/23/1996 PASS
Details
/ / 400 - walk thru with james
INSP - Carpentry6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - walk thru with james unit G2
INSP - Carpentry6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - walk thru with james unit G2
INSP - Conference6/20/19966/20/19966/20/1996 PASS
Details
/ / 400 - confer with super&subs
INSP - Foundation5/28/19965/29/19965/29/1996PCANC
DetailsDave Lightfoot
05/28/96 337 - PM EARLY G2
INSP - Footings5/23/19965/24/19965/24/1996APASS
Details
05/23/96 400 - EARLY A.M. setbacks seem ok