INSP - Final | 11/14/1997 | 11/14/1997 | 11/14/1997 | | PASS |
|
|
|
Final
|
Permanent Occupancy | | 11/14/1997 | 11/14/1997 | | DONE |
|
|
|
|
INSP - Final | 2/27/1997 | 2/27/1997 | 2/27/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL TEMP OCC PENDING P.W. AND P &Z AND STRUC.
|
INSP - Final | 2/24/1997 | 2/25/1997 | 2/25/1997 | A | PART |
Jim Storey
|
|
|
/ / 301 - FINAL FOR C/O OTH-OTHER AGENCIES NOT APPROVED CORR-CORREC-CALL FOR REINSP WHEN COMPLETED HAND RAIL AS PER PLAN NW STAI
|
INSP - Final | 2/24/1997 | 2/24/1997 | 2/24/1997 | P | PASS |
|
|
|
CHECKED MSDS FILE FOR FLASH POINTS, FILL PIPES PERMANENTLY SUPPORTED, VENT SYSTEM INSTALLED W/ EMERGENCY SHUTOFF
|
INSP - Final | 2/14/1997 | 2/14/1997 | 2/14/1997 | P | FAIL |
Jim Storey
|
|
|
02/14/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 2/14/1997 | 2/14/1997 | 2/14/1997 | P | FAIL |
|
|
|
need basement ventilation for tank venting, verify all fluids are IIIB
|
INSP - Framing/Rough-in | 1/21/1997 | 1/22/1997 | 1/22/1997 | P | PART |
Jim Storey
|
|
|
01/22/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO GYP CEILLING PENDING ME
|
INSP - Framing/Rough-in | 12/17/1996 | 12/18/1996 | 12/18/1996 | P | NR |
Jim Storey
|
|
|
12/18/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED resubmital not aproved, other not done. no insp. preformed c/n posted.
|
INSP - Masonry | 11/21/1996 | 11/22/1996 | 11/22/1996 | P | PASS |
|
|
|
11/22/96 333 - BLOCK BUILDING BEFORE POUR. MASN-REBAR OK
|
INSP - Carpentry | 11/15/1996 | 11/15/1996 | 11/15/1996 | P | PASS |
|
|
|
11/15/96 333 - BLOCK BUILDING -PRE-INSPECTION FOR STEEL......
|
INSP - Framing/Rough-in | 11/14/1996 | 11/15/1996 | 11/15/1996 | A | CANC |
|
|
|
11/14/96 333 - masonry
|
INSP - Masonry | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
|
|
|
11/13/96 333 - STRUCTURAL STEEL - BLK.WALL. MASN-REBAR OK
|
INSP - Framing/Rough-in | 10/28/1996 | 10/29/1996 | 10/29/1996 | P | FAIL |
Jim Storey
|
|
|
10/29/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Footings | 9/25/1996 | 9/26/1996 | 9/26/1996 | A | PASS |
Jim Storey
|
|
|
09/25/96 301 - INTERIOR FOOTING REBAR FRMS-OK FORMS-REBAR
|
INSP - Footings | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | PART |
Jim Storey
|
|
|
09/18/96 301 - MID AM PLEASE!!! FRMS-OK FORMS-REBAR covered by special insp.
|
INSP - Foundation | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | PASS |
Jim Storey
|
|
|
09/18/96 301 - MID AM PLEASE!! FRMS-OK FORMS-REBAR covered by special insp.
|
INSP - Foundation | 9/6/1996 | 9/9/1996 | 9/9/1996 | A | PASS |
Jim Storey
|
|
|
09/06/96 301 - FND. WALLS FRMS-OK FORMS-REBAR
|
INSP - Footings | 9/6/1996 | 9/6/1996 | 9/9/1996 | P | NR |
Jim Storey
|
|
|
09/06/96 301 - trans to carl d.
|
INSP - Footings | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SPEC INSP ONSITE; TOLD TO VERIFY SETBACK AT EXCAVATION, PROC PART, PENDING SPEC INSP REPORT...LOOKS OK. 301 AREA
|
INSP - Footings | 8/30/1996 | 8/30/1996 | 8/30/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRMS-OK FORMS-REBAR
|