Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberBLD96-00026
StatusFinaled
Name PUBLIC PARK SHELTER/JULIA DAVIS PARK
Site Address 700 S CAPITOL
Project Name 
Customer Number 
ePlanReviewNo
Description
To remove the wood shakes to 2 x 6 spaced sheathing, to install 1/2" plywood sheathing over spaced framing, apply felt underlayment and install 1600 sq. ft. of Architectural 80 fiberglass shingles as manufactured by GS Roofing Products Co., page 11, 1995 UL Roofing Systems Directory. Installation per manufactures specifications and Chapter 15, 1994 UBC. drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final3/11/19973/11/19973/10/1997PPASS
Details
03/11/97 333 - FNL -OK FINAL
INSP - Letter of compliance3/10/19973/10/19973/10/1997 PASS
Details
/ / 333 - letter #12257
INSP - Letter of compliance3/10/19973/10/19973/10/1997 PASS
Details
/ / 333 - letter #12257
INSP - Final3/6/19973/7/19973/6/1997PPASS
Details
03/07/97 333 - FINAL FOR C/O FNL -OK FINAL card not found ì
INSP - Conference3/5/19973/5/19973/4/1997PPASS
Details
03/05/97 333 - sent letter of trans
INSP - Framing/Rough-in2/12/19962/12/19962/12/1996 PASS
DetailsBob Archibald
ok to roof inspected by #401.
INSP - Wall cover2/7/19962/7/19962/7/1996PCANC
Details
02/07/96 333 - PICNIC SHELTER WEST SIDE OF THE DUCK POND. WHERE THE OLD
INSP - Wall cover2/6/19962/6/19962/6/1996PNR
Details
02/06/96 333 - dry wall nailing.
INSP - Carpentry1/18/19961/18/19961/18/1996 PASS
DetailsBob Archibald
existing framing ok for new sheathing.