INSP - Framing/Rough-in | 6/7/1996 | 6/7/1996 | 6/7/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING FNL -OK FINAL LCI-LETTER OF
|
INSP - Final | 6/5/1996 | 6/5/1996 | 6/5/1996 | P | FAIL |
Jim Storey
|
|
|
06/05/96 301 - LATE P.M. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED NO PRINT ON SITE NO FRAMING I REQUSTED.
|
INSP - Final | 5/16/1996 | 5/17/1996 | 5/19/1996 | A | CANC |
|
|
|
05/17/96 400 -
|
INSP - Set-back | 3/6/1996 | 3/7/1996 | 3/7/1996 | P | PASS |
|
|
|
CARD INSIDE WHITE SHED IN PLASTIC BAG. PLEASE SIGN IT.
|