INSP - Final | 5/2/1996 | 5/3/1996 | 4/27/1996 | P | CANC |
Wes Worcester
|
|
|
05/03/96 342 - already done
|
INSP - Conference | 4/4/1996 | 4/4/1996 | 4/4/1996 | P | PASS |
|
|
|
conference with shelly
|
INSP - Energy code compliance | 4/3/1996 | 4/4/1996 | 4/4/1996 | A | PASS |
|
|
|
set backs ok
|
INSP - Framing/Rough-in | 3/28/1996 | 3/29/1996 | 3/29/1996 | A | PASS |
|
|
|
|
INSP - Footings | 2/29/1996 | 2/29/1996 | 2/29/1996 | P | PASS |
|
|
|
early start poured pior to inspection
|