Permanent Occupancy | | 6/3/1997 | 6/3/1997 | | DONE |
|
|
|
|
INSP-Final Inspection | 5/1/1997 | 5/2/1997 | 5/2/1997 | A | PASS |
|
|
|
completed alarm testing, kim to verify access to sfd's provided, moving/adding exit sign in corridor TA-DAH!
|
INSP - Final | 5/1/1997 | 5/2/1997 | 5/1/1997 | A | PART |
|
|
|
05/02/97 333 - LATE P.M. FLOYD WILL BE GOING OUT EARLY A.M.???? OTH-OTHER AGENCIES NOT APPROVED FNL -OK FINAL
|
INSP-Final Inspection | 4/29/1997 | 4/30/1997 | 4/30/1997 | A | FAIL |
|
|
|
need mtc contract on alarms, need access to test SFD in phase III
|
INSP - Final | 4/29/1997 | 4/30/1997 | 4/29/1997 | A | FAIL |
|
|
|
04/30/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 4/24/1997 | 4/25/1997 | 4/25/1997 | A | FAIL |
|
|
|
ISSUED CORRECTION NOTICE, NEED TO RELO 2 HEADS DUE TO FIXTURE OBSTRUCTION, FINISH CORRIDOR PROTECTION, CLEAN 3 PAINTED HEADS, REMOVE 2 EXIT SIGNS TO LOCKED PATIO, TEST ALARMS
|
INSP - Temporary occupancy | 4/24/1997 | 4/25/1997 | 4/24/1997 | P | NR |
|
|
|
04/25/97 333 - not ready
|
INSP - Ceiling grid | 4/21/1997 | 4/22/1997 | 4/21/1997 | A | PASS |
|
|
|
04/22/97 333 - SCLG-OK SUSPENDED CEILING
|
INSP - Partial final | 4/10/1997 | 4/10/1997 | 4/10/1997 | P | |
George Slane
|
|
|
insp. for temp.occ. HE WANTED THIS A/S/A/P!!!! AS EARLY PM AS POSSIBLE..... ok for temp occ phase ii. gs
|
INSP - Temporary occupancy | 4/8/1997 | 4/9/1997 | 4/8/1997 | P | FAIL |
|
|
|
04/09/97 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Conference | 4/7/1997 | 4/8/1997 | 4/8/1997 | A | PASS |
|
|
|
would like early a.m. alarm and sprinkler tsting CORRECTION NOTICE ISSUED, FIRE WATCH REQUIREMENT RELIEVED PHASE I AND II APPROVED FOR TEMP OCCUPANCY
|
INSP-Final Inspection | 4/8/1997 | 4/8/1997 | 4/8/1997 | A | PART |
|
|
|
PHASE I AND PHASE II APPROVED FOR TEMP, CORRECTION NOTICE ISSUED WITH ITEMS REQUIRED FOR PERM
|
INSP-Final Inspection | 4/2/1997 | 4/3/1997 | 4/3/1997 | P | FAIL |
|
|
|
STEVE - ###-#### FIRE ALARMS city tie and digital communicator not installed, could not test alarms completely
|
INSP-Conference | 3/24/1997 | 3/24/1997 | 3/24/1997 | A | PASS |
|
|
|
MEETING W/ RENN, TIM, PARKS, HUMMEL ON FIRE WATCH AND PHASE 2. SITE VISIT W/ GEORGE AND KIM ON BASEMENT CORRIDOR ISSUES
|
INSP-Sprinkler Rough-in/Hydro | 3/19/1997 | 3/20/1997 | 3/20/1997 | A | PART |
|
|
|
phase ii hydro and rough in only
|
INSP - Final | 3/18/1997 | 3/18/1997 | 3/18/1997 | A | FAIL |
|
|
|
sprinkler and alarm testing for phase I and basement (finally) deluge not working, alarms not working, no fe's, stairway not complete, c/n issued to george/boise parks, and steve/cobra
|
INSP - Final | 3/17/1997 | 3/18/1997 | 3/17/1997 | A | NR |
|
|
|
03/18/97 333 - not ready.
|
INSP - Final | 3/17/1997 | 3/17/1997 | 3/17/1997 | P | FAIL |
|
|
|
c/n issued, basement only, need h/s..fe's..alarms tested, emergency and exit lights to be tested.
|
INSP - Final | 3/14/1997 | 3/17/1997 | 3/17/1997 | A | FAIL |
|
|
|
basement- need two exits, need fire alarms tested, k maurer checking on fire rating requirement of basement corridor. need to check heads in sauna for high temp, need fe in basement, need to remove wedges from doors
|
INSP - Final | 3/14/1997 | 3/17/1997 | 3/16/1997 | A | FAIL |
|
|
|
03/17/97 333 - not ready no approved plan \ OTH-OTHER AGENCIES NOT APPROVED
|
INSP - Framing/Rough-in | 3/10/1997 | 3/11/1997 | 3/10/1997 | A | PASS |
|
|
|
03/11/97 333 - FRAM-OK FRAMING
|
INSP-Conference | 3/10/1997 | 3/10/1997 | 3/10/1997 | P | PART |
|
|
|
returned alarm plans, complete except for wire run lengths and size documentation
|
INSP - Final | 2/24/1997 | 2/25/1997 | 2/25/1997 | A | PART |
|
|
|
ALARM SYSTEM REVIEW W/CONTRATOR
|
INSP-Conference | 2/20/1997 | 2/20/1997 | 2/21/1997 | P | PART |
|
|
|
pick up alarm specs from cobra, auto drive, delores INFORMED TREVOR THAT THE ALARM PLANS WERE STILL NOT COMPLETE, WILL REVIEW ANYWAY
|
INSP - Roof | 2/10/1997 | 2/11/1997 | 2/11/1997 | A | PASS |
|
|
|
02/11/97 333 - ok pending insp reports
|
INSP-Conference | 2/11/1997 | 2/11/1997 | 2/11/1997 | P | PART |
|
|
|
ALARM PLANS RECIEVED & REVIEWED WAITING FOR DATA SHEETS ON DEVICES TO COMPLETE REVIEW
|
INSP-Conference | 2/10/1997 | 2/7/1997 | 2/7/1997 | P | PART |
|
|
|
meeting with dennis from AEI to finalize alarm plans for project
|
INSP - Masonry | 1/23/1997 | 1/24/1997 | 1/24/1997 | A | PASS |
|
|
|
01/24/97 333 - MASN-REBAR OK
|
INSP-Conference | 1/24/1997 | 1/24/1997 | 1/24/1997 | A | PART |
|
|
|
meeting on need to submit alarm plans w/ dumont, cobra, allen of hummel, AEI, and elec sub. all agreed that alarm plans need to be preapred and submitted.
|
INSP - Framing/Rough-in | 1/22/1997 | 1/22/1997 | 1/22/1997 | P | PART |
|
|
|
01/22/97 333 - corridors ok
|
INSP - Masonry | 1/22/1997 | 1/22/1997 | 1/22/1997 | P | |
Wes Worcester
|
|
|
|
INSP - Masonry | 1/17/1997 | 1/17/1997 | 1/17/1997 | P | PASS |
|
|
|
01/17/97 333 - REBAR PLACEMENT AND MASONRY MASN-REBAR OK
|
INSP - Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 | A | PASS |
Wes Worcester
|
|
|
faving engineer's report
|
INSP - Foundation | 1/13/1997 | 1/14/1997 | 1/14/1997 | A | PART |
Wes Worcester
|
|
|
engineer's stamped change to be faxed to Building Dept
|
INSP - Masonry | 1/14/1997 | 1/14/1997 | 1/14/1997 | A | PASS |
Wes Worcester
|
|
|
2nd lift, special inspector on site, hairpins changed, Engineer to address. 1/4" clearance ok (as per engineer)
|
INSP - Final | 1/10/1997 | 1/10/1997 | 1/10/1997 | A | PART |
|
|
|
FE'S MOUNTED, FIRE WATCH IN PROGRESS, SPRINKLERS (LESS DELUDE) WET. TEMP OCC W/ WATCH APPROVED. CONDITIONS LISTED ON C/N, COPIES TO COBRA, TREVOR AND gEORGE AT p&r.
|
INSP - Masonry | 1/9/1997 | 1/10/1997 | 1/10/1997 | A | FAIL |
Wes Worcester
|
|
|
re-bar inadequate cover on #3 ties, special inspector log and scope of work letter not on site
|
INSP - Final | 1/9/1997 | 1/9/1997 | 1/9/1997 | P | PART |
|
|
|
ALARM SYSTEM TESTING FOR PHASE 1, C/N ISSUED WITH 8 OUTSTANDING ITEMS.
|
INSP - Masonry | 1/8/1997 | 1/9/1997 | 1/9/1997 | A | PART |
Wes Worcester
|
|
|
special inspector on site and attempting to get cover
|
INSP-Sprinkler Rough-in/Hydro | 1/8/1997 | 1/9/1997 | 1/9/1997 | A | NR |
|
|
|
FIRST THING arrived at 8, no one there, debest arrived at 8:45, dispute with owner and general on liability of testing basement with new system
|
INSP-Sprinkler Rough-in/Hydro | 1/9/1997 | 1/9/1997 | 1/9/1997 | | PASS |
|
|
|
/ / 405 - on at 3:35 pm, 205 psi. off 5:30 pm
|
INSP-Sprinkler Rough-in/Hydro | 1/9/1997 | 1/9/1997 | 1/9/1997 | | PASS |
|
|
|
/ / 405 - leaks fixed, pressurized at 3:35pm
|
INSP-Sprinkler Rough-in/Hydro | 1/10/1997 | 1/9/1997 | 1/9/1997 | P | PASS |
|
|
|
new system hydro tested, riser not yet installed, temp occ setup
|
INSP-Sprinkler Rough-in/Hydro | 1/9/1997 | 1/9/1997 | 1/9/1997 | | PASS |
|
|
|
/ / 405 - new loop and basement, not deluge
|
INSP - Final | 1/8/1997 | 1/8/1997 | 1/8/1997 | A | FAIL |
|
|
|
CHECKED ON FLUSHING, PROBLEMS CONNECTING....Alarm panel discovered to be too small
|
INSP-Supply line flush | 1/8/1997 | 1/8/1997 | 1/8/1997 | P | PASS |
|
|
|
flush complete, hydro scheduled for 1/9..am
|
INSP - Final | 1/7/1997 | 1/7/1997 | 1/7/1997 | | FAIL |
|
|
|
/ / 405 - checked on progress for meeting conditions set by hattrick. sprinklers shut off, ug not flushed, new above ground connected to basem system. issued c/n to stop all further sprinkler work until ug is flush Also informed owner an
|
INSP - Conference | 1/6/1997 | 1/6/1997 | 1/6/1997 | A | PART |
Wes Worcester
|
|
|
walked w/architect at project re: penetrations in ceiling and basement. Basement ok
|
INSP - Conference | 1/3/1997 | 1/6/1997 | 1/6/1997 | A | PART |
Wes Worcester
|
|
|
A fire guard is to be posted with a written narrative submitted by Parks to Building
|
INSP - Masonry | 1/6/1997 | 1/6/1997 | 1/6/1997 | A | PART |
Wes Worcester
|
|
|
correcting cover issues and will recheck later. ok to grout 1st lift West wall. Tenting and special inspector to be on site at lift as per scope of work description.
|
INSP - Masonry | 1/6/1997 | 1/6/1997 | 1/6/1997 | A | NR |
Wes Worcester
|
|
|
inadequate cover and where narrative in letter form differs from approved plan detail....follow approved plan
|
INSP-Conference | 1/6/1997 | 1/6/1997 | 1/6/1997 | | PART |
|
|
|
/ / 405 - meeting with hattrick, slane, worchester, hummel, parks dept hattrick gave conditions for use of phase I. need fire watch, basement sprinklers functional, fe's, and establish exit path from south gym door
|
INSP-Supply line flush | 1/6/1997 | 1/6/1997 | 1/6/1997 | | PART |
|
|
|
/ / 405 - checked basement sprinklers for dirt, ok
|
INSP - Conference | 1/3/1997 | 1/3/1997 | 1/3/1997 | P | FAIL |
Wes Worcester
|
|
|
Unable to approve temp occupancy as hazards exist. A meeting will be scheduled for Monday.
|
INSP - Final | 1/2/1997 | 1/3/1997 | 1/3/1997 | A | FAIL |
|
|
|
NO ALARMS INSTALLED, NO SPRINKLERS CONNECTED OR TESTED, SMOKE/FIRE DAMPERS NOT FUNCTIONAL, NO FIRE EXTINGUISHERS, 90 min door not installed in 2hr wall between gym and new corridor. SPrinklers required for size increase and change of rating. smoke detection required for corridor, classrooms have no exterior exits. Manual alarms required for A occupancy. exit to corridor from gym required due to size and also temp partioning walls.
|
INSP - Final | 1/2/1997 | 1/2/1997 | 1/2/1997 | P | FAIL |
Wes Worcester
|
|
|
TREVOR ###-#### - CALL HIM IF HE HASN'T REACHED YOU BY NOW. need all other agencies signature
|
INSP - Masonry | 1/2/1997 | 1/2/1997 | 1/2/1997 | P | PART |
Wes Worcester
|
|
|
met w/architect and sub on site...that that was ready was ok. sub to meet w/engineer
|
INSP - Masonry | 1/2/1997 | 1/2/1997 | 1/2/1997 | P | PASS |
Wes Worcester
|
|
|
1st lift ok
|
INSP - Masonry | 12/23/1996 | 12/26/1996 | 12/26/1996 | A | CANC |
Carl Dependahl
|
|
|
called and canceled inspection for today
|
INSP - Conference | 12/23/1996 | 12/24/1996 | 12/24/1996 | A | PASS |
Wes Worcester
|
|
|
putting in tempered glass as guardrail would be insufficient
|
INSP - Framing/Rough-in | 12/19/1996 | 12/20/1996 | 12/20/1996 | A | NR |
Wes Worcester
|
|
|
masonary inspect
|
INSP - Masonry | 12/20/1996 | 12/20/1996 | 12/20/1996 | A | FAIL |
Wes Worcester
|
|
|
not to approved plan nor UBC ctiteria. ie inadequate cover on splices, hairpins and ties. splices not lapped enough, verticals at beam pockets not spliced and w/o adequate cover, bar at bond beams w/o cover & not in..
|
INSP - Conference | 12/19/1996 | 12/19/1996 | 12/19/1996 | P | PASS |
Wes Worcester
|
|
|
plan approved as per Bob Garrison and will be delivered to site
|
INSP - Ceiling grid | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | PART |
Wes Worcester
|
|
|
turning down siesmic clips
|
INSP - Masonry | 12/3/1996 | 12/4/1996 | 12/4/1996 | P | PASS |
Wes Worcester
|
|
|
THIS IS YOU A.M. APPOINT. REBAR & COLUMNS
|
INSP-Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 | A | FAIL |
|
|
|
reviewed alarm plans, noted problems on c/n, returned to cobra cascade
|
INSP - Conference | 11/12/1996 | 11/13/1996 | 11/13/1996 | P | PART |
Wes Worcester
|
|
|
submittal approved for sidewalk/landing
|
INSP-Conference | 11/13/1996 | 11/13/1996 | 11/13/1996 | | PART |
|
|
|
gave contractor code references for sprinkler requirements questioned from rough-in c/n
|
INSP - Foundation | 11/12/1996 | 11/12/1996 | 11/12/1996 | P | PASS |
Wes Worcester
|
|
|
RE-BAR
|
INSP-Conference | 11/7/1996 | 11/8/1996 | 11/12/1996 | A | PART |
|
|
|
advised on tamper requirements, will follow with letter and docs
|
INSP - Foundation | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - SLAB W/REBAR STRUCTURAL OK
|
INSP - Framing/Rough-in | 11/6/1996 | 11/7/1996 | 11/7/1996 | A | NR |
Wes Worcester
|
|
|
/ / 342 - rebar INSPECTION
|
INSP-Sprinkler Rough-in/Hydro | 11/1/1996 | 11/4/1996 | 11/4/1996 | A | PART |
|
|
|
CALL RANDY - ###-####. C/N ISSUED...OK TO COVER
|
INSP - Flatwork | 10/29/1996 | 10/29/1996 | 10/29/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 -
|
INSP - Flatwork | 10/24/1996 | 10/25/1996 | 10/29/1996 | A | NR |
Wes Worcester
|
|
|
10/29/96 342 - SLAB rebar being added where necessary at CJ and placing
|
INSP - Foundation | 10/16/1996 | 10/16/1996 | 10/16/1996 | | PASS |
Wes Worcester
|
|
|
/ / 342 - placing dobbie for two inch clearance
|
INSP - Foundation | 10/15/1996 | 10/16/1996 | 10/16/1996 | A | NR |
Wes Worcester
|
|
|
10/16/96 342 - FROST WALL
|
INSP - Conference | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PART |
Wes Worcester
|
|
|
contact architect for compliance instructions in the future, not Building Dept.
|
INSP - Framing/Rough-in | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | NR |
Wes Worcester
|
|
|
FIRE WALL
|
INSP - Wall cover | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PASS |
Wes Worcester
|
|
|
ceiling and beam ok
|
INSP-Conference | 9/17/1996 | 9/17/1996 | 9/17/1996 | P | PASS |
|
|
|
09/17/96 405 - reviewed elevator alarm and general alarm requirements w/ contractor...will supply copy of code
|
INSP - Foundation | 9/13/1996 | 9/16/1996 | 9/16/1996 | A | PASS |
Alan Hauser
|
|
|
09/16/96 350 - FOUNDATIONS FOR PATIO AND TWO INTERIOR COLUMN PADS OK
|
INSP - Conference | 9/10/1996 | 9/13/1996 | 9/13/1996 | A | PART |
Wes Worcester
|
|
|
WOULD LIKE AROUND 10:00 IF POSSIBLE PERRY TO CONTINUE
|
INSP - Foundation | 9/11/1996 | 9/13/1996 | 9/13/1996 | A | FAIL |
Wes Worcester
|
|
|
NO COVER, NOT PLACED CORRECTLY, INSTALLED INCORRECTLY, NOT READY
|
INSP - Framing/Rough-in | 9/11/1996 | 9/12/1996 | 9/12/1996 | A | FAIL |
Wes Worcester
|
|
|
STILL HAVE TO PROVIDE SHEETROCK BACKING, FINISH BRACING & FIREBLOCKING
|
INSP - Conference | 9/10/1996 | 9/10/1996 | 9/10/1996 | P | PART |
Wes Worcester
|
|
|
HE SAID YOU SAID YOU WOULD MEET HIM AT 1:30
|
INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 | P | NH |
Wes Worcester
|
|
|
|
INSP - Carpentry | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | PART |
Wes Worcester
|
|
|
1st layer of rock at I beam ok
|
INSP - Conference | 9/3/1996 | 9/5/1996 | 9/5/1996 | A | NR |
Wes Worcester
|
|
|
BERRY WILL CALL YOU FOR AN APPT. Eng to be on site Fri, called MTI also to be on site
|
INSP - Framing/Rough-in | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | PART |
Wes Worcester
|
|
|
some metal studs ok....still working
|
INSP - Framing/Rough-in | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | PART |
Wes Worcester
|
|
|
portion of 1 hr wall
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | PART |
Wes Worcester
|
|
|
talked @ insp procedures, special inspections
|
INSP - Foundation | 9/3/1996 | 9/4/1996 | 9/4/1996 | P | FAIL |
Wes Worcester
|
|
|
SHE CALLED & SAID YOU HAD SET APPT. FOR 3 P.M. WED. poured w/o inspection, submit engineered design and approval of
|
INSP - Site Preparation | 9/4/1996 | 9/4/1996 | 9/4/1996 | P | FAIL |
Wes Worcester
|
|
|
column pads out of alignment and repositioned w/o insp
|
INSP - Conference | 8/29/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
Wes Worcester
|
|
|
met w/general again re:changes and resubmittal process
|
INSP - Footings | 8/29/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Foundation | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | PART |
Wes Worcester
|
|
|
MON. EARLY A.M. REBAR
|
INSP - Site Preparation | 8/29/1996 | 8/19/1996 | 8/19/1996 | A | PASS |
Wes Worcester
|
|
|
provided adequate cover for rebar
|
INSP - Footings | 8/16/1996 | 8/16/1996 | 8/16/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Footings | 8/16/1996 | 8/16/1996 | 8/16/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Foundation | 8/16/1996 | 8/16/1996 | 8/16/1996 | A | PART |
Wes Worcester
|
|
|
going from three steps to two....ck w/engineer for change
|
INSP - Site Preparation | 8/16/1996 | 8/16/1996 | 8/16/1996 | A | FAIL |
Wes Worcester
|
|
|
inadequate cover
|
INSP - Site Preparation | 8/16/1996 | 8/16/1996 | 8/16/1996 | P | PART |
Wes Worcester
|
|
|
getting cover in several places
|
INSP - Conference | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | PASS |
Wes Worcester
|
|
|
discussed plans w/foriegn owner
|
INSP - Conference | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Footings | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Footings | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | NR |
Wes Worcester
|
|
|
changing bds for edge cover
|
INSP - Footings | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | NR |
Wes Worcester
|
|
|
REBAR
|
INSP - Site Preparation | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | NR |
Wes Worcester
|
|
|
still working on cover and missing some horizontals
|
INSP - Site Preparation | 8/15/1996 | 8/15/1996 | 8/15/1996 | P | PART |
Wes Worcester
|
|
|
requested compaction report on soils
|
INSP - Footings | 8/12/1996 | 8/13/1996 | 8/13/1996 | A | CANC |
Wes Worcester
|
|
|
called after the fact...tried to schedule pre-con meeting
|
INSP - Footings | 8/13/1996 | 8/13/1996 | 8/13/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Footings | 8/9/1996 | 8/12/1996 | 8/11/1996 | A | NR |
Wes Worcester
|
|
|
08/12/96 342 -
|
INSP - Conference | 8/11/1996 | 8/11/1996 | 8/11/1996 | | PART |
Wes Worcester
|
|
|
/ / 342 - schedule pre-con mtg....discussed plan and cover
|