INSP - Final | 12/31/1996 | 12/31/1996 | 12/31/1996 | | PASS |
|
|
|
/ / 405 - shell and core, sprinkler system w/ flow and tamper alarms c by sep permit only
|
INSP - Final | 12/30/1996 | 12/31/1996 | 12/31/1996 | A | NR |
|
|
|
12/30/96 405 - LATE MORNING not ready, reschedule
|
INSP - Temporary occupancy | 12/30/1996 | 12/31/1996 | 12/31/1996 | P | PASS |
|
|
|
12/31/96 333 - READY 1:00 card signed FNL -OK FINAL
|
INSP - Temporary occupancy | 12/19/1996 | 12/20/1996 | 12/26/1996 | | PASS |
|
|
|
Art Yingling scheduled insp. for temp. occ/on 12/20/96 Bonding for sprinkling & landscaping will be required (approx. $17,815.00) Letter of Credit in the amount of $17, 815.00 rec'd. on 12/26/96 - Temporary Signed.
|
INSP-Supply line flush | 12/11/1996 | 12/12/1996 | 12/12/1996 | A | PASS |
|
|
|
RICH FRY - ###-#### pass
|
INSP-Supply line flush | 12/11/1996 | 12/11/1996 | 12/12/1996 | A | CANC |
|
|
|
FLUSH PIPE - RICK FRY PAGER ###-####. was not posted until 12/11 am not picked up
|
INSP - Carpentry | 11/20/1996 | 11/20/1996 | 11/20/1996 | P | PART |
Wes Worcester
|
|
|
WAREHOUSE FLOORS..... special inspector on site
|
INSP - Foundation | 11/15/1996 | 11/18/1996 | 11/18/1996 | A | PART |
Wes Worcester
|
|
|
pouring floor monday
|
INSP - Foundation | 11/12/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Wes Worcester
|
|
|
REBAR FOUNDATION FOR WALLS.
|
INSP - Conference | 11/8/1996 | 11/8/1996 | 11/8/1996 | A | PART |
Wes Worcester
|
|
|
|
INSP - Footings | 11/8/1996 | 11/8/1996 | 11/8/1996 | A | FAIL |
Wes Worcester
|
|
|
|
INSP - Footings | 11/8/1996 | 11/8/1996 | 11/8/1996 | P | PASS |
Wes Worcester
|
|
|
RETAINING WALL
|
INSP - Site Preparation | 11/8/1996 | 11/8/1996 | 11/8/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Carpentry | 10/28/1996 | 10/29/1996 | 10/29/1996 | A | PART |
|
|
|
10/28/96 400 - HANDICAP RAMPS special inspector eric is covering this in
|
INSP - Footings | 9/19/1996 | 9/19/1996 | 9/19/1996 | P | PASS |
|
|
|
special insp
|
INSP - Conference | 9/6/1996 | 9/6/1996 | 9/6/1996 | | PASS |
|
|
|
/ / 400 - confer with scott special insp for EISI, req scope of work i
|
INSP - Foundation | 9/5/1996 | 9/5/1996 | 9/5/1996 | P | PASS |
|
|
|
09/05/96 400 - REBAR special insp req
|
INSP - Conference | 8/29/1996 | 8/29/1996 | 8/29/1996 | | PASS |
|
|
|
/ / 400 - confer with EISI special insp-req scope of work action doc
|
INSP - Foundation | 8/28/1996 | 8/29/1996 | 8/29/1996 | A | PASS |
|
|
|
08/28/96 400 - check stemwall-req special inspection follow up
|
INSP - Foundation | 8/22/1996 | 8/23/1996 | 8/23/1996 | P | PASS |
|
|
|
08/22/96 400 - LATE AM special inspector on site
|
INSP - Footings | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PASS |
|
|
|
08/15/96 400 - talked to ron, will pour am fri, special insp, req report
|
INSP - Footings | 8/14/1996 | 8/15/1996 | 8/15/1996 | P | PASS |
|
|
|
insp foot, req special insp report, insp on site
|
INSP - Footings | 8/8/1996 | 8/9/1996 | 8/9/1996 | A | PASS |
|
|
|
insp setback & insp gridline G & partial on line E footing
|