INSP - Final | 3/13/1997 | 3/13/1997 | 3/13/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL
|
INSP - Final | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | FAIL |
Jim Storey
|
|
|
03/13/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Letter of compliance | 3/13/1997 | 3/13/1997 | 3/13/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13739
|
INSP - Letter of compliance | 3/13/1997 | 3/13/1997 | 3/13/1997 | | PASS |
Jim Storey
|
|
|
/ / 301 - LCI-LETTER OF COMPLIANCE ISSUED 13739
|
INSP - Framing/Rough-in | 1/23/1997 | 1/24/1997 | 1/24/1997 | P | PASS |
Alan Hauser
|
|
|
01/24/97 350 - FRAME REINSPECT all corrections made
|
INSP - Energy code compliance | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | PART |
|
|
|
01/21/97 333 - did with carl was sent to both of us
|
INSP - Framing/Rough-in | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/21/97 340 - C/N,NEED FIREBLOCKING, AIR SEAL AT TUBS, BLOCK FLOOR JOIS BRACING. OK TO INSUL
|
INSP - Misc. complaint | 10/14/1996 | 10/14/1996 | 10/14/1996 | P | NR |
|
|
|
10/14/96 400 - PERMIT NOT CHECKED UP.CHECK TO SEE WHAT IS GOING ON. foun no other activity, informed silverado
|
INSP - Conference | 9/27/1996 | 9/27/1996 | 9/27/1996 | | PASS |
|
|
|
/ / 400 - confer with louise waldorf as per request, on status of bldg as permit not picked up
|