INSP - Final | 5/12/1997 | 5/12/1997 | 5/12/1997 | P | PASS |
Carl Dependahl
|
|
|
05/12/97 340 -
|
INSP - Final | 5/12/1997 | 5/12/1997 | 5/12/1997 | P | PASS |
Carl Dependahl
|
|
|
05/12/97 340 - C/N OK, CARD TO CONT.
|
INSP - Final | 5/12/1997 | 5/12/1997 | 5/12/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - REINSP FOR FINAL OK FOR PERM OCC
|
INSP - Final | 5/12/1997 | 5/12/1997 | 5/12/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - FINAL PARTIAL SPKLR SYSTEM OK ALARM SYSTEM & DOORS STILL NOT
|
INSP - Framing/Rough-in | 5/12/1997 | 5/12/1997 | 5/12/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - FIRESTOPS APPEAR OK
|
Permanent Occupancy | | 5/12/1997 | 5/12/1997 | | DONE |
|
|
|
|
INSP - Final | 5/9/1997 | 5/9/1997 | 5/9/1997 | P | FAIL |
Carl Dependahl
|
|
|
05/09/97 340 - A & B WING; C/N, COMPLETE DOOR HDWE, CARPET, FIRE, ETC. N BARRIER 2ND FL
|
INSP - Carpentry | 5/8/1997 | 5/8/1997 | 5/8/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - A WING, NEED FIRE OK, COMPLETE ALL HDWE, FIRESTOPS ETC. KEEP
|
INSP-Final Inspection | 5/8/1997 | 5/8/1997 | 5/8/1997 | P | |
Joe Tawney
|
|
|
4:00 PM TRIP TEST DRY PIPE SYSTEM
|
INSP - Final | 4/30/1997 | 5/6/1997 | 5/6/1997 | A | FAIL |
Joe Tawney
|
|
|
BILL HART ###-####. WANTS 10 A.M. FINAL INSP FAIL DP SYSTEM DID NOT MAKE TIME DOOR HDWRE & SMOKE SEALS NOT INSTALLED ALARMS IN HANDICAP ROOMS SPKLR PROTECTION IN STAIRWELLS LOCATION OF STROBES IN CORRIDORS PAINT & STRIPE CURBS ROTATE FIRE HYD
|
INSP - Final | 4/30/1997 | 5/6/1997 | 5/6/1997 | A | NR |
Carl Dependahl
|
|
|
05/06/97 340 - BILL HART ###-#### WANTS TO MEET AT 10 A.M. NR
|
INSP - Conference | 5/5/1997 | 5/5/1997 | 5/5/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - FINAL REQS, STAIR RAILS OK AT A WING
|
INSP-Final Inspection | 4/30/1997 | 5/2/1997 | 5/2/1997 | A | FAIL |
Joe Tawney
|
|
|
MIKE ###-#### TRIP TEST ON DRY SYSTEM FAIL 87 SEC TO FIRST WATER 125 SEC TO SOLID STREAM
|
INSP - Conference | 4/30/1997 | 4/30/1997 | 4/30/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE FINALS ON A WING W/ STAN JOHNSON
|
INSP - Carpentry | 4/25/1997 | 4/25/1997 | 4/25/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - 1ST FL A-WING; NEED COMPLETE FIRESTOPPING PER DETAILS, KEEP
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1997 | 4/23/1997 | 4/23/1997 | P | PART |
Joe Tawney
|
|
|
04/23/97 406 - MIKE ###-#### OK ON HYDRO TEST OF WET SYSTEMS ì
|
INSP-Supply line flush | 4/21/1997 | 4/21/1997 | 4/21/1997 | | PART |
Joe Tawney
|
|
|
/ / 406 - FLUSH TEST OK
|
INSP - Carpentry | 4/17/1997 | 4/18/1997 | 4/18/1997 | P | PART |
Carl Dependahl
|
|
|
04/18/97 340 - FIRE CAULKING
|
INSP - Conference | 4/17/1997 | 4/17/1997 | 4/17/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - GAVE ADA REQS FOR RAILS
|
INSP - Conference | 4/17/1997 | 4/17/1997 | 4/17/1997 | P | PASS |
Carl Dependahl
|
|
|
04/17/97 340 - RE FINAL SIGN OFF REQS
|
INSP - Carpentry | 4/10/1997 | 4/10/1997 | 4/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - A WING CORR. PENETRATIONS
|
INSP - Carpentry | 4/4/1997 | 4/4/1997 | 4/4/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FIRESTOPPING AT A WING
|
INSP - Conference | 4/1/1997 | 4/1/1997 | 4/1/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/JOB SUPT RE FINAL REQ'S & SHAFT DETAIL
|
INSP - Conference | 3/20/1997 | 3/20/1997 | 3/20/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE PENETRATIONS AT 2HR AREA WALLS
|
INSP - Conference | 3/18/1997 | 3/18/1997 | 3/18/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE SMOKE COMPARTMENT REQ'S
|
INSP-Conference | 3/18/1997 | 3/18/1997 | 3/18/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - CONF ALARM SYSTEMS GC ADV SIMPLEX IS WORKING ON SUBMITTAL
|
INSP - Conference | 3/17/1997 | 3/17/1997 | 3/17/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ BILL, SUPT. RE SHAFT DETAIL
|
INSP - Conference | 3/11/1997 | 3/11/1997 | 3/11/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REQUESTED DETAIL FOR SHAFT FOR GREASE DUCT
|
INSP - Carpentry | 3/5/1997 | 3/5/1997 | 3/5/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FRAMING CUT BACK AT EAST 2HR WALL, OK FOR 1ST LAYER, CHK FIR
|
INSP - Carpentry | 3/5/1997 | 3/5/1997 | 3/5/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FRAMING CUT BACK AT EAST 2HR WALL, OK FOR 1ST LAYER, CHK FIR
|
INSP - Carpentry | 3/3/1997 | 3/3/1997 | 3/3/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N RE FIRESTOPS & SMOKE DAMPERS AT OCC. SEPARATION(S); CORR
|
INSP - Carpentry | 2/27/1997 | 2/27/1997 | 2/27/1997 | P | CANC |
|
|
|
02/27/97 338 - CANC 340 WILL TAKE CARE OF IT
|
INSP - Conference | 2/27/1997 | 2/27/1997 | 2/27/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ LEN OF DEBEST PLBG RE FIRESTOPPING.
|
INSP-Sprinkler Rough-in/Hydro | 2/27/1997 | 2/27/1997 | 2/27/1997 | P | PART |
Joe Tawney
|
|
|
02/27/97 406 - OK ON HYDRO TEST FOR DRY PIPE SYSTEM
|
INSP - Carpentry | 2/24/1997 | 2/24/1997 | 2/24/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - REJECTED AREA SEP. WALL DETAIL, WILL CONSULT W/ JOHN MENARD.
|
INSP - Conference | 2/20/1997 | 2/20/1997 | 2/21/1997 | P | PASS |
Carl Dependahl
|
|
|
02/20/97 340 - HAS SPEC INSP REPORT FOR SPRAY ON FP, KEEP C/N
|
INSP - Carpentry | 2/13/1997 | 2/14/1997 | 2/14/1997 | A | PART |
Carl Dependahl
|
|
|
02/14/97 340 - 1ST LAYER LIDS AT A WING; APPLYING SPRAY-ON FIREPROOF OVE SPEC. INSP. INADEQUATE THICKNESS & DENSITY
|
INSP - Carpentry | 2/12/1997 | 2/12/1997 | 2/12/1997 | P | FAIL |
Carl Dependahl
|
|
|
02/12/97 340 - C/N, NEED FINISH FIREBLOCKING/STOPPING AT: C WING, KITCHE NEED DETAIL FOR 2HR WALLS
|
INSP - Carpentry | 2/12/1997 | 2/12/1997 | 2/12/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - SEE C/N W/ BLD96-0464
|
INSP - Carpentry | 2/10/1997 | 2/11/1997 | 2/11/1997 | P | PART |
Carl Dependahl
|
|
|
02/11/97 340 - 1ST LAYER LIDS A WING
|
INSP - Carpentry | 2/10/1997 | 2/10/1997 | 2/10/1997 | | PART |
Carl Dependahl
|
|
|
02/07/97 340 - STUCCO & SHEAR NAILING. ok to install lids 1st layer 2nd fl a wing except at smokebarrier
|
INSP - Carpentry | 2/10/1997 | 2/10/1997 | 2/10/1997 | P | PART |
Carl Dependahl
|
|
|
02/10/97 340 - NEED COMPLETE 1ST LAYER LIDS A WING; FIREBLOCKS AT RESILI
|
INSP - Wall cover | 2/10/1997 | 2/10/1997 | 2/10/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - INT GYP SHEAR C WING; PART, NEED NAIL SOLES,BLOCKING
|
INSP - Carpentry | 2/7/1997 | 2/7/1997 | 2/7/1997 | P | PART |
Carl Dependahl
|
|
|
STUCCO & SHEAR NAILING...NEED COMPLETE SW 1 & 2 A WING, 2ND FL
|
INSP - Carpentry | 2/4/1997 | 2/5/1997 | 2/5/1997 | P | CANC |
Carl Dependahl
|
|
|
02/05/97 340 -
|
INSP - Carpentry | 2/4/1997 | 2/5/1997 | 2/5/1997 | A | FAIL |
Carl Dependahl
|
|
|
02/04/97 340 - BOWEN DEV. ###-#### A-WING keep c/n re fireblocking at rc channel
|
INSP - Carpentry | 2/4/1997 | 2/4/1997 | 2/4/1997 | P | FAIL |
Carl Dependahl
|
|
|
02/04/97 340 - A WING 1ST FL; NEED FIREBLOCKS AT TOP WALL W/ RESILIENT C C WING WALK THRU; NEED COMLETE FIRESTOPPING AT PLBG PENETRATIONS, 2ND FL STILL NEED DETAIL FOR 2HR AREA WALLS
|
INSP - Carpentry | 2/3/1997 | 2/3/1997 | 2/3/1997 | P | CANC |
|
|
|
02/03/97 338 - given to 340
|
INSP - Carpentry | 2/3/1997 | 2/3/1997 | 2/3/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N RE SHEAR WALLS AT CORR, DRAFT STOPS AT TENANT WALLS, NEE
|
INSP - Carpentry | 1/31/1997 | 1/31/1997 | 1/31/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/31/97 340 - A WING. 1ST FL SHEAR AT CORRIDOR OK; OK TO INSUL
|
INSP-Sprinkler Rough-in/Hydro | 1/30/1997 | 1/31/1997 | 1/31/1997 | A | PART |
Joe Tawney
|
|
|
OK TO COVER WET SYSTEM DOWNSTAIRS IN WING A & DRY SYSTEM IN WING A
|
INSP - Carpentry | 1/29/1997 | 1/30/1997 | 1/30/1997 | P | CANC |
Carl Dependahl
|
|
|
01/30/97 340 -
|
INSP - Carpentry | 1/29/1997 | 1/29/1997 | 1/29/1997 | P | PART |
Carl Dependahl
|
|
|
01/29/97 340 - part, need chk w/ plan chk re 1hr fl/clg resubmittal
|
INSP - Carpentry | 1/28/1997 | 1/28/1997 | 1/29/1997 | P | PART |
Carl Dependahl
|
|
|
01/28/97 340 - SUBMITTING DETAIL FOR SPRAY-ON FIREPROOF IN LIEU OF 1HR D COMPLETE FIRESTOPPING
|
INSP - Carpentry | 1/27/1997 | 1/27/1997 | 1/27/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/27/97 340 - KEEP C/N RE FIREBLOCKING, STOPPING; STILL NEED DETAIL FOR PLAN
|
INSP - Carpentry | 1/23/1997 | 1/24/1997 | 1/24/1997 | A | FAIL |
Carl Dependahl
|
|
|
01/24/97 340 - KEEP C/N
|
INSP - Carpentry | 1/23/1997 | 1/23/1997 | 1/23/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/23/97 340 - C/N, NEED DETAIL FOR 1HR. LID ABOVE BATHS,,, 1ST FL A WIN FIRESTOPPING
|
INSP - Carpentry | 1/22/1997 | 1/22/1997 | 1/22/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/22/97 340 - 1ST FL A WING; NEED FIRESTOP DETAILS, FIREBLOCKS THRU-OUT SHOES AT OVER BORED STUDS...NOT COMPLETE
|
INSP - Carpentry | 1/21/1997 | 1/21/1997 | 1/21/1997 | P | FAIL |
Carl Dependahl
|
|
|
01/21/97 340 - NEED FIRESTOP DETAIL & STUD SHOES
|
INSP - Conference | 1/21/1997 | 1/21/1997 | 1/21/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET W/ PLBR & JOB SUPER...NEED TO CUT BACK INSUL FROM SUPPLY PENETRATIONS OR PROVIDE DETAIL FOR ASSEMBLY. REC'D SMOKE/ FLAME SPREAD I FOR PIPE INSUL,OK
|
INSP - Carpentry | 1/16/1997 | 1/16/1997 | 1/16/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - A WING, OK TO "PRE-ROCK" CORRIDOR LID AT RES.AREAS; NEED OTH FRAME INSP
|
INSP - Carpentry | 1/10/1997 | 1/10/1997 | 1/10/1997 | P | PART |
Carl Dependahl
|
|
|
01/10/97 340 - VERBAL, REQUESTED FIX FOR OVERBORED STUDS AT BRG WALL
|
INSP - Conference | 1/10/1997 | 1/10/1997 | 1/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REQUESTED DETAILS RE FIRESTOPPIG COLLARS, USING NELSON INSTE
|
INSP - Framing/Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - SENT TO 338 IN ERROR; C/N, NEED 2 HR WALL DETAIL, FIRESTOPPI
|
INSP - Framing/Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 | P | CANC |
|
|
|
340 area carl called and said he would do it
|
INSP - Framing/Rough-in | 1/9/1997 | 1/9/1997 | 1/9/1997 | P | CANC |
|
|
|
|
INSP - Carpentry | 1/6/1997 | 1/6/1997 | 1/6/1997 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHK FRAMING PROGRESS, MET W/ HVAC CONT.
|
INSP - Conference | 12/30/1996 | 12/30/1996 | 12/30/1996 | P | PASS |
Carl Dependahl
|
|
|
MET W/ CONTRACTOR & JOHN MENARD RE EXIT PASSAGEWAY...OK AS SHOWN.
|
INSP - Conference | 12/17/1996 | 12/17/1996 | 12/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - re area sep. wall detail
|
INSP - Conference | 12/12/1996 | 12/12/1996 | 12/12/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED FIRESTOPS AT PLBG & ELEC PENETRATIONS
|
INSP - Carpentry | 12/9/1996 | 12/9/1996 | 12/9/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CHK'D FRAMING AT TWO HR WALL & CORRIDOR AT D SECTION; OK TO PANEL BOARDS ONLY
|
INSP - Carpentry | 11/27/1996 | 11/27/1996 | 11/27/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - SHEAR PANEL DETAILS,C/N WITH INSP FOR BLD96-1205
|
INSP - Carpentry | 11/25/1996 | 11/25/1996 | 11/25/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - 1ST FL SHEAR WALLS, NEED ANCHOR BOLT SPACED PER PLAN, NAILIN
|
INSP - Conference | 11/21/1996 | 11/21/1996 | 11/21/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/PLUMBER & SUPT RE FIRESTOPPING AT 1HR
|
INSP - Carpentry | 11/19/1996 | 11/19/1996 | 11/19/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - WALK THRU W/ SUPT, CHK SHEAR PANELS, NOT ALL COMPLETE; WILL
|
INSP - Conference | 11/15/1996 | 11/15/1996 | 11/15/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - 2HR. & SHEAR WALL REQ'S W/ BOB A. SUPT.
|
INSP - Conference | 11/8/1996 | 11/8/1996 | 11/8/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - NEED DETAIL FOR 2 HR. WALL
|
INSP - Conference | 11/6/1996 | 11/6/1996 | 11/6/1996 | P | PASS |
Carl Dependahl
|
|
|
11/06/96 340 - W/SUPT. RE FIRESTPPING
|
INSP - Conference | 11/5/1996 | 11/5/1996 | 11/5/1996 | P | PASS |
Carl Dependahl
|
|
|
RE PRE-ROCK FOR TUBS & SOFFITS
|
INSP - Conference | 10/28/1996 | 10/28/1996 | 10/28/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - 1 HR CONST REG'S, BEGINNING FRAMING
|
INSP - Conference | 10/15/1996 | 10/15/1996 | 10/15/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - ASKED FOR RESUB. ON RATED FL/CLG ASSY'S; DISCUSSED 1 HR REQ'
|
INSP - Conference | 10/11/1996 | 10/14/1996 | 10/14/1996 | P | PART |
Carl Dependahl
|
|
|
10/14/96 340 - PART, REC'D DETAIL FOR REVIEW
|
INSP - Carpentry | 10/11/1996 | 10/11/1996 | 10/11/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CHK CORR. FRAME DETAILS FOR 1HR...NEED MORE INFO & SUBMITTAL
|
INSP - Conference | 10/8/1996 | 10/8/1996 | 10/8/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CONF RE PRE ROCK FOR 1 HR WALLS ,TUBS ETC
|
INSP - Conference | 10/3/1996 | 10/3/1996 | 10/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - 1HR REQ'S AND AREA SEP. WALLS
|
INSP - Conference | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - A SECTION ASSISTED LVG COMPLEX
|