INSP - Final | 6/5/1997 | 6/6/1997 | 6/5/1997 | A | PASS |
|
|
|
06/06/97 333 - 1ST THING AM SHE NEEDS TO GO TO WORK FNL -OK FINAL
|
INSP - Energy code compliance | 11/5/1996 | 11/5/1996 | 11/5/1996 | P | PASS |
Alan Hauser
|
|
|
11/05/96 350 - reinspection ON INSULATION OK, OK TO COVER
|
INSP - Energy code compliance | 11/1/1996 | 11/1/1996 | 11/1/1996 | P | CANC |
Alan Hauser
|
|
|
|
INSP - Energy code compliance | 11/1/1996 | 11/1/1996 | 11/1/1996 | | FAIL |
Alan Hauser
|
|
|
11/01/96 350 - CORRECTIONS ON INSULATION INSTALLATION AND REMOVE VAPOR B AT ATTIC
|
INSP - Framing/Rough-in | 10/17/1996 | 10/17/1996 | 10/17/1996 | P | PASS |
Alan Hauser
|
|
|
10/17/96 350 - REINSPECTION CORRECTIONS MADE OK TO INSULATE
|
INSP - Framing/Rough-in | 10/7/1996 | 10/7/1996 | 10/7/1996 | P | FAIL |
Alan Hauser
|
|
|
10/07/96 350 - CORRECTIONS NOT OK TO INSULATE
|
INSP - Footings | 4/11/1996 | 4/12/1996 | 4/12/1996 | A | PASS |
Jim Sly
|
|
|
04/11/96 316 - EARLY A.M. Footings poured befor inspection.....Soil, fo and setbacks OK.
|
INSP - Footings | 4/12/1996 | 4/11/1996 | 4/11/1996 | P | PASS |
|
|
|
|