Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD96-00506
StatusFinaled
Name FLICKS THEATRE
Site Address 646 FULTON ST
Project NameFLICKS THEATRE
Customer Number 
ePlanReviewNo
Description
TO ADD TWO NEW THEATERS AND RELATED PROJECTION BOOTH TO THE EXISTING MULTI THEATER COMPLEX. THE ADDITION AND THE EXISTING BUILDING IS, TWO STORY WOOD FRAMED, TYPE V-1HR, FULLY FIRE SPRINKLERED. THE INSTALLATION OF THE FIRE SPRINKLER SYSTEM IS BEING USED FOR FIRE-RESISTIVE SUBSTITUTION PURPOSES. THEATER #3 IS APPROXIMATELY 664 SQ.FT. AND SEATS 64. THEATER #4 IS APPROXIMATELY 528 SQ,FT AND SEATS 47. THE PROJECTION BOOTH IS TO BE LABELED "SAFETY FILM ONLY". THE TOTAL ADDITION IS APPROXIMATELY 2630 SQ.FT., OF THIS 607 SQ.FT IS LOCATED ON THE SECOND FLOOR FOR THE PROJECTION ROOM. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, CABO/ANSI STANDARDS, AND THE 1994 EDITION OF THE UBC. WORK TO INCLUDE THE RELATED SITE WORK AND PAVING. MJP (PC#115-96)DR#154-94 CU# 60-94.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 5/27/19975/27/1997 DONE
Details
INSP - Final5/20/19975/20/19975/19/1997PPASS
Details
05/20/97 333 - if no one at front door go thru law office next door FNL -OK FINAL card signed
INSP - Final4/10/19974/10/19974/10/1997PFAIL
DetailsAlan Hauser
04/10/97 350 - no final, corrections posted with builder and owner
INSP - Final3/5/19973/5/19973/5/1997PPASS
Details
c/n items corrected, occ load for entire complex posted at 475
INSP - Partial final1/28/19971/28/19971/28/1997PPART
Details
01/28/97 333 - signed for temp
INSP - Final1/24/19971/24/19971/24/1997PPART
Details
c/n issued on several small items. alarm test witnessed, waiting for documentation
INSP-Conference1/14/19971/14/19971/14/1997APART
Details
met w contractor Deanna Anthony (###-####), owner, and arch. on alarm requirements. sprinklers now over 100 heads so off site is req. manual pulls and horn strobes throughout addition required. sprinklers are dry sys, asked for total gals since no accelerator was added with expansion.
INSP-Conference1/13/19971/13/19971/13/1997PPART
Details
meeting with anthony homes (cont), and comm fire, reviewed plans, alarms required.....cont claims they did not know, owner says no money
INSP - Wall cover11/18/199611/19/199611/19/1996APASS
Details
11/19/96 333 - SHEETROCK NAILING GWB -OK SHEETROCK NAILING
INSP - Framing/Rough-in11/7/199611/8/199611/8/1996APASS
Details
11/08/96 333 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Framing/Rough-in11/7/199611/7/199611/7/1996PCANC
DetailsWes Worcester
11/07/96 342 - given to Kim
INSP-Sprinkler Rough-in/Hydro10/25/199610/25/199610/25/1996 PASS
Details
rogh in for cover
INSP - Conference10/4/199610/7/199610/7/1996APASS
Details
10/07/96 333 - CALL ###-#### REGARDING PRE-FRAMING STHG-OK ROOF SHEATHING
INSP - Framing/Rough-in9/12/19969/12/19969/12/1996P
Details
INSP - Footings9/12/19969/12/19969/11/1996PPASS
Details
09/12/96 338 - made ok this time