INSP - Final | 6/28/1996 | 6/28/1996 | 6/28/1996 | P | PASS |
|
|
|
06/28/96 333 - FNL -OK FINAL
|
INSP - Letter of compliance | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
|
|
|
/ / 333 - letter #10764 given to contractor
|
INSP - Letter of compliance | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
|
|
|
/ / 333 - letter #10764 given to contractor
|
INSP - Final | 6/26/1996 | 6/27/1996 | 6/27/1996 | P | FAIL |
|
|
|
06/26/96 400 - left corr elect/mech final not completed
|
INSP - Framing/Rough-in | 5/7/1996 | 5/7/1996 | 5/8/1996 | P | CANC |
Carl Dependahl
|
|
|
05/07/96 340 - FRAME REINSPECTION 400 AREA, SENT IN ERROR
|
INSP - Framing/Rough-in | 5/3/1996 | 5/6/1996 | 5/6/1996 | A | FAIL |
Jim Storey
|
|
|
05/06/96 301 - FRAME REINSPECTION. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 5/2/1996 | 5/3/1996 | 5/3/1996 | A | FAIL |
Jim Storey
|
|
|
05/02/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 4/30/1996 | 4/30/1996 | 4/30/1996 | P | PASS |
|
|
|
|
INSP - Foundation | 3/21/1996 | 3/21/1996 | 3/21/1996 | P | FAIL |
|
|
|
no address to locate
|
INSP - Footings | 3/18/1996 | 3/19/1996 | 3/19/1996 | P | FAIL |
|
|
|
AFTER 1 P.M.....AS SOON AS POSSIBLE. address not visable from street
|