Permanent Occupancy | | 9/26/1996 | 9/26/1996 | | DONE |
|
|
|
|
INSP - Conference | 8/15/1996 | 8/15/1996 | 8/15/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - turned flood plain cert to dan o. in plan review.
|
INSP - Final | 8/14/1996 | 8/15/1996 | 8/15/1996 | P | PART |
Jim Storey
|
|
|
pending health dept. sign off.
|
INSP - Final | 8/15/1996 | 8/15/1996 | 8/15/1996 | | FAIL |
Jim Storey
|
|
|
08/15/96 301 - THURS.P.M. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED landing, occ load sign.
|
INSP - Foundation | 6/19/1996 | 6/20/1996 | 6/20/1996 | A | PASS |
Jim Sly
|
|
|
06/19/96 316 - Footings OK ..use detail in drawings 1/A2 for all footing Stapley engineering reviewed and sent (stamped) memo of change. 6X6 post placed on Simpson PB66 base.
|
INSP - Foundation | 6/18/1996 | 6/19/1996 | 6/19/1996 | P | FAIL |
Jim Sly
|
|
|
06/18/96 316 - Need resubmittal for change on plans...engineering for footing bearing capacity for deck.
|