INSP - Final | 7/29/1996 | 7/29/1996 | 7/29/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FNL -OK FINAL
|
INSP - Final | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | FAIL |
Jim Storey
|
|
|
07/26/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Energy code compliance | 5/31/1996 | 5/31/1996 | 5/31/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - INS OK, OK TO COVER ALL
|
INSP - Framing/Rough-in | 5/31/1996 | 5/31/1996 | 5/31/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - FIRE BLOCK OK
|
INSP - Energy code compliance | 5/24/1996 | 5/24/1996 | 5/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - keep c/n, need rim & duct insul at bsmt
|
INSP - Framing/Rough-in | 5/24/1996 | 5/24/1996 | 5/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - keep c/n; ok to cover except as noted; will need gyp nailing
|
INSP - Energy code compliance | 5/23/1996 | 5/23/1996 | 5/23/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - NEED R19 AT ATTIC WALLS, RIM & BSMT INS
|
INSP - Framing/Rough-in | 5/22/1996 | 5/23/1996 | 5/23/1996 | A | FAIL |
Carl Dependahl
|
|
|
05/22/96 340 - A.M . THURS. NEED M.L. ENG'G, WALL BRACING, FIREBLOCKING
|
INSP - Framing/Rough-in | 5/17/1996 | 5/20/1996 | 5/20/1996 | A | FAIL |
Jim Sly
|
|
|
05/17/96 316 - C/N
|
INSP - Framing/Rough-in | 5/14/1996 | 5/15/1996 | 5/15/1996 | A | FAIL |
Carl Dependahl
|
|
|
05/14/96 340 - C/N NEED PLAN, TRUSS & WALL BRACE ENG'G, FIREBLOCKING...D
|
INSP - Footings | 4/10/1996 | 4/10/1996 | 4/15/1996 | P | PART |
Carl Dependahl
|
|
|
04/10/96 340 - SLAB INS OK
|
INSP - Set-back | 4/10/1996 | 4/10/1996 | 4/10/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FND WALL POURED W/O INSP
|
INSP - Set-back | 4/10/1996 | 4/10/1996 | 4/10/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FND WALL POURED W/O INSP
|
INSP - Footings | 4/3/1996 | 4/3/1996 | 4/3/1996 | P | PART |
Carl Dependahl
|
|
|
04/03/96 340 - gave c/n to insul slab at lvg area
|