INSP - Final | 6/14/1996 | 6/14/1996 | 6/14/1996 | P | PASS |
Alan Hauser
|
|
|
06/14/96 350 - FINAL REINSPECT all corrections taken care of final
|
INSP - Letter of compliance | 6/14/1996 | 6/14/1996 | 6/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11303
|
INSP - Letter of compliance | 6/14/1996 | 6/14/1996 | 6/14/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11303
|
INSP - Final | 6/13/1996 | 6/13/1996 | 6/13/1996 | P | FAIL |
Alan Hauser
|
|
|
06/13/96 350 - FINAL REINSPECT no final still corrections
|
INSP - Final | 6/11/1996 | 6/12/1996 | 6/12/1996 | P | FAIL |
Alan Hauser
|
|
|
06/11/96 350 - PM FOR STRUC no final needs mech. final and corrections
|
INSP - Energy code compliance | 5/22/1996 | 5/22/1996 | 5/22/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Framing/Rough-in | 5/22/1996 | 5/22/1996 | 5/22/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 -
|
INSP - Wall cover | 5/21/1996 | 5/21/1996 | 5/21/1996 | P | FAIL |
Jim Sly
|
|
|
05/21/96 36 - C/N ... Framing Inspection...no Mech. rough-in
|
INSP - Framing/Rough-in | 5/20/1996 | 5/20/1996 | 5/20/1996 | P | FAIL |
Jim Sly
|
|
|
05/20/96 316 - C/N
|
INSP - Footings | 3/22/1996 | 3/22/1996 | 3/22/1996 | P | PART |
Jim Sly
|
|
|
03/22/96 316 - Poured W/O inspection....soil OK..South side setback not verified....pins?
|