INSP - Conference | 6/18/1996 | 6/18/1996 | 6/18/1996 | | PASS |
|
|
|
/ / 400 - confer with hans on insp
|
INSP - Final | 6/17/1996 | 6/18/1996 | 6/18/1996 | A | PASS |
|
|
|
06/17/96 400 - REINSPECT ON FINAL. c/l# 11349
|
INSP - Letter of compliance | 6/18/1996 | 6/18/1996 | 6/18/1996 | | PASS |
|
|
|
/ / 400 - c/l# 11349
|
INSP - Letter of compliance | 6/18/1996 | 6/18/1996 | 6/18/1996 | | PASS |
|
|
|
/ / 400 - c/l# 11349
|
INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 | | PASS |
|
|
|
/ / 400 - confer wit randy on final insp
|
INSP - Final | 6/14/1996 | 6/14/1996 | 6/14/1996 | P | FAIL |
|
|
|
06/14/96 400 - FINAL REINSPECT uint moved into require electrical final
|
INSP - Final | 6/13/1996 | 6/13/1996 | 6/13/1996 | P | FAIL |
|
|
|
06/13/96 400 - left corr
|
INSP - Energy code compliance | 5/3/1996 | 5/3/1996 | 5/3/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Conference | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | PASS |
|
|
|
conference with mark
|
INSP - Framing/Rough-in | 5/1/1996 | 5/2/1996 | 5/2/1996 | A | FAIL |
|
|
|
A.M.
|
INSP - Framing/Rough-in | 5/1/1996 | 5/2/1996 | 5/2/1996 | A | FAIL |
|
|
|
left corr
|
INSP - Framing/Rough-in | 5/2/1996 | 5/2/1996 | 5/2/1996 | P | PASS |
|
|
|
|
INSP - Framing/Rough-in | 5/1/1996 | 5/1/1996 | 5/1/1996 | P | FAIL |
|
|
|
ELCT PLBN NEEDS SIGN OFF
|
INSP - Energy code compliance | 5/3/1996 | 5/3/1996 | 4/27/1996 | P | CANC |
Wes Worcester
|
|
|
05/03/96 342 - given to J Storey
|
INSP - Footings | 4/4/1996 | 4/5/1996 | 4/5/1996 | A | PASS |
|
|
|
checked set-backs ok
|