INSP - Final | 6/27/1996 | 6/28/1996 | 6/28/1996 | A | PASS |
Jim Storey
|
|
|
06/28/96 301 - FNL -OK FINAL
|
INSP - Energy code compliance | 6/3/1996 | 6/3/1996 | 6/3/1996 | P | PASS |
|
|
|
06/03/96 400 -
|
INSP - Energy code compliance | 5/30/1996 | 5/31/1996 | 5/31/1996 | P | FAIL |
|
|
|
05/31/96 400 - P.M. FRI. INSULATION NOT COMPLETED, FIRE TAPE BEHIND MECH EQP, A LINE HEAT DUCT@FU
|
INSP - Conference | 5/30/1996 | 5/30/1996 | 5/30/1996 | | PASS |
|
|
|
/ / 400 - conference with dennis
|
INSP - Footings | 5/29/1996 | 5/30/1996 | 5/30/1996 | A | CANC |
|
|
|
05/29/96 400 - wrong type inspection or wrong permit
|
INSP - Framing/Rough-in | 5/30/1996 | 5/30/1996 | 5/30/1996 | | PASS |
|
|
|
/ / 400 -
|
INSP - Footings | 3/25/1996 | 3/26/1996 | 3/26/1996 | A | PASS |
|
|
|
early start-address not posted
|
INSP - Conference | 3/25/1996 | 3/25/1996 | 3/25/1996 | P | PASS |
|
|
|
steve called about inspecting footing at 4472 falconrest way- was called in for 03-26-96
|