Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberBLD96-00645
StatusFinaled
Name BRIDGE AT COLUMBIA
Site Address 4150 E GRAND FOREST DR
Project NameSE-JR.HS. (BRIDGE)
Customer Number 
ePlanReviewNo
Description
(NEW BRIDGES)(SOUTH-EAST JR. HIGH SCHOOL) TO CONSTRUCT BRIDGES #1 AND #2 AT THE NEW JUNIOR HIGH SCHOOL SITE. CONSTRUCTION TO BE ALL POURED IN PLACE REINFORCED CONCRETE BOX BRIDGES, WITH BOTH PROTECTED AND NON PROTECTED REINFORCEMENT, AND THE INSTALLATION OF GEOTEXTILE WITH RIPRAP. ALL PER APPROVED PLANS ON FILE AND PC#141-96, CU#-95-95.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final12/2/199612/2/199612/2/1996 PASS
INSP - Letter of compliance  12/2/1996 PASS
ISSUED #12340 C OF C BY MJW THIS DATE AS PER 305.
INSP - Miscellaneous11/22/199611/25/199611/26/1996 N/A
This permit does not require insp/approvals from Planning Dept./Code Enf. Div.
INSP - Final11/22/199611/25/199611/25/1996PNR
DetailsWes Worcester
bridge const on pvt land....need signatures and special insp rept
INSP - Conference11/22/199611/22/199611/22/1996PPASS
DetailsWes Worcester
talked w/contractor @ bridge, no other insp as Weigle did not find location on ftg/fdn request for inspection.
INSP - Final11/21/199611/22/199611/22/1996PCANC
DetailsWes Worcester
muddy and contractor stated we could not get in
INSP - Carpentry8/27/19968/27/19968/27/1996PPASS
Details
08/27/96 400 - THIS IS BRIDGE WORK. THEY WILL SHOW ( insp h2o line under YOU WHAT TO LOOK AT.(I HOPE!!) & extends 5' on each side- ok 2 cover)
INSP - Foundation8/23/19968/26/19968/26/1996AFAIL
Details
08/25/96 400 - could not locate