INSP - Framing/Rough-in | 2/24/1998 | 2/25/1998 | 2/25/1998 | P | FAIL |
Wes Worcester
|
|
|
02/25/98 342 - Roof jim dale ###-#### work 2pm apt
|
INSP - Final | 2/19/1998 | 2/23/1998 | 2/23/1998 | P | NH |
Wes Worcester
|
|
|
02/23/98 342 - Homeowner has reported improper ventilation and comp shin less than 2/12. Send CN to contractor if these conditions exist.
|
INSP - Conference | 2/18/1998 | 2/18/1998 | 2/18/1998 | | FAIL |
Wes Worcester
|
|
|
/ / 342 - need roof to code and all inspections performed
|
INSP - Final | 2/17/1998 | 2/18/1998 | 2/18/1998 | A | NR |
Wes Worcester
|
|
|
02/18/98 342 - ###-#### SANDY DALE\\SHE SAYS THERE ARE PROBLEMS WITH THE CALL SANDY AT WORK TO TALK TO HER ABOUT THIS PROBLEM
|