TO BUILD A NEW 3157 SF TWO STORY SINGLE FAMILY DWELLING WITH AN ATTACHED 887SF THREE CAR GARAGE AND APPROXIMATLY 537 SF OF CONCRETE PATIO PER APPROVED PLANS AND ATTACHED REQUIREMENT LIST. HILLSIDE. CU-43-90. PLAN CHECK # 96-270. PRP
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Letter of compliance4/10/19974/10/19974/9/1997 PASS
DetailsJim Storey
lc# 12449
INSP - Roof4/10/19974/10/19974/9/1997 PASS
DetailsJim Storey
lc#12449
INSP - Final10/22/199610/22/199610/22/1996PPASS
DetailsWes Worcester
INSP - Letter of compliance10/22/199610/22/199610/22/1996PPASS
DetailsWes Worcester
c/c issued
INSP - Final10/21/199610/21/199610/21/1996PFAIL
Details
10/21/96 338 - late p.m.
INSP - Final10/18/199610/18/199610/18/1996PNR
DetailsWes Worcester
not even close to being ready, informed him to finish and do BCEC.
INSP - Carpentry8/15/19968/15/19968/15/1996PPASS
DetailsWes Worcester
columns installed corrcetly
INSP - Conference8/15/19968/15/19968/15/1996APASS
DetailsWes Worcester
Falash had engineering there for lg. window wall
INSP - Conference8/15/19968/15/19968/15/1996APASS
DetailsWes Worcester
discussed column support w/architect/engineer
INSP - Energy code compliance8/15/19968/15/19968/15/1996APASS
DetailsWes Worcester
INSP - Framing/Rough-in8/15/19968/15/19968/15/1996PPASS
DetailsWes Worcester
INSP - Framing/Rough-in8/14/19968/15/19968/15/1996APASS
DetailsWes Worcester
INSP - Energy code compliance8/13/19968/13/19968/13/1996PPASS
DetailsWes Worcester
INSP - Framing/Rough-in8/13/19968/13/19968/13/1996PPART
DetailsWes Worcester
INSP - Carpentry8/5/19968/5/19968/5/1996PFAIL
DetailsWes Worcester
do truss eng, transfer point loads, need gable wall eng
INSP - Framing/Rough-in8/5/19968/5/19968/5/1996PNR
DetailsWes Worcester
had requested to do both frame and mech at same time.. still did not have plumbing
INSP - Framing/Rough-in8/1/19968/2/19968/2/1996PNR
DetailsWes Worcester
other trades not done
INSP - Foundation6/13/19966/13/19966/13/1996PPASS
DetailsWes Worcester
06/13/96 342 -
INSP - Foundation6/12/19966/12/19966/12/1996 PASS
DetailsWes Worcester
/ / 342 -
INSP - Footings6/11/19966/11/19966/11/1996 FAIL
DetailsWes Worcester
/ / 342 - compaction failed
INSP - Footings6/11/19966/11/19966/11/1996 PART
DetailsWes Worcester
/ / 342 - compacted soils and report being faxed to office
INSP - Footings6/11/19966/11/19966/11/1996 PASS
DetailsWes Worcester
/ / 342 -
INSP - Conference6/6/19966/6/19966/6/1996 PASS
DetailsWes Worcester
/ / 342 - rebar is ok
INSP - Footings6/6/19966/6/19966/6/1996PFAIL
DetailsWes Worcester
06/06/96 342 - imported fill, called falash and informed him he needed a report as soils report did not address compaction of fill...or loose soi