INSP - Occupancy Sign-off | 12/5/1997 | 1/16/1997 | 1/16/1997 | | PASS |
|
|
|
Art Yingling insp, for final - proj. meets req. of DR-8-96, Final and Bond Release signed
|
INSP - Final | 12/5/1996 | 12/5/1996 | 12/5/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/N for metacaulk fitting and temp.glass.....OK Perm. Occ.
|
INSP - Final | 12/5/1996 | 12/5/1996 | 12/5/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - C/N for metacaulk fitting and temp.glass.....OK Perm. Occ.
|
Permanent Occupancy | | 12/5/1996 | 12/5/1996 | | DONE |
|
|
|
|
INSP - Final | 11/22/1996 | 11/22/1996 | 11/22/1996 | P | FAIL |
Carl Dependahl
|
|
|
11/22/96 340 - c/n...firestop bsmt lid, temp glass at int.office w/i 24" ok for t/o card to cont.
|
INSP - Temporary occupancy | 11/20/1996 | 11/22/1996 | 11/22/1996 | | PASS |
|
|
|
Insp. for Temp. Occ. by Art Y./Bonding req. for: Fence, landscape on west and north side, Stripe prkg. lot, install H/C sign and trash enclosure. Hold for est. (DR-8-96)- Cashier Checks posted on 11/22/96 (2,555.) - Temporary Signed.
|
INSP - Final | 11/21/1996 | 11/21/1996 | 11/21/1996 | P | PASS |
Joe Tawney
|
|
|
11/21/96 406 - OK FOR PERM OCC STRUC TO CHECK REAR EXIT DOOR LOWER LEVE
|
INSP - Final | 11/19/1996 | 11/19/1996 | 11/20/1996 | P | NR |
Joe Tawney
|
|
|
11/19/96 406 - not ready
|
INSP - Carpentry | 10/24/1996 | 10/24/1996 | 10/24/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - WEATHER BARRIER BEHIND BRICK, 1HR WALL AT NO. SIDE
|
INSP - Carpentry | 10/15/1996 | 10/15/1996 | 10/15/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - STAIRS, LANDINGS, 1HR WALL AT NORTH SIDE
|
INSP - Carpentry | 9/30/1996 | 10/1/1996 | 10/1/1996 | A | PART |
Carl Dependahl
|
|
|
09/30/96 340 - NORTH WALL FIRE WALL EXTERIOR. PART, EXT OK. NEED TO FINISH AT INT
|
INSP - Conference | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CONF RE 1HR CONST, STAIRS AND LANDINGS
|
INSP - Framing/Rough-in | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | PART |
Carl Dependahl
|
|
|
NEED 1HR AT BSMT LID & N. WALL, OK TO COVER INT.
|
INSP - Framing/Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 | P | FAIL |
Carl Dependahl
|
|
|
09/20/96 340 - keep c/n
|
INSP - Framing/Rough-in | 9/20/1996 | 9/20/1996 | 9/20/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - c/n...part insp. ok to ins, fireblocks done while onsite
|
INSP - Framing/Rough-in | 9/19/1996 | 9/19/1996 | 9/18/1996 | P | CANC |
|
|
|
09/19/96 338 - sent to 340
|
INSP - Foundation | 7/29/1996 | 7/29/1996 | 7/29/1996 | P | |
|
|
|
|
INSP - Footings | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | PART |
Carl Dependahl
|
|
|
07/22/96 340 - PART, UNABLE TO VERIFY SET BACKS, FTG IN HOLE. STEEL OK
|