Permanent Occupancy | | 5/14/1997 | 5/14/1997 | | DONE |
|
|
|
|
INSP - Final | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | PASS |
Carl Dependahl
|
|
|
05/05/97 340 - joe got inspection for fire early p.m. so can you go out
|
INSP-Final Inspection | 5/5/1997 | 5/5/1997 | 5/5/1997 | P | PASS |
|
|
|
advised mgr that door is not secure with nothing replacing manual flush bolts. Advised automatic flush bolts be installed.
|
INSP - Final | 4/23/1997 | 4/24/1997 | 4/24/1997 | P | FAIL |
Carl Dependahl
|
|
|
04/24/97 340 -
|
INSP-Final Inspection | 4/23/1997 | 4/24/1997 | 4/24/1997 | P | FAIL |
Joe Tawney
|
|
|
04/24/97 406 - OK ON PERMIT WORK OTHER ITEMS IN BLDG MUST BE ADDRESSED B ISSUED EXIT DOORS AND SIGNS NO SIGN OFF
|
INSP - Conference | 4/22/1997 | 4/22/1997 | 4/22/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CONT, HAS PLAN & CARD, WILL GET FIRE INSP.
|
INSP - Conference | 4/14/1997 | 4/14/1997 | 4/14/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - w/ cont. re c/n; will call for final asap
|
INSP - Carpentry | 4/10/1997 | 4/10/1997 | 4/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CHK FOR OTHER FINALS, OK. NEED PLAN SHOWING OTHER TENANT SPA
|
INSP - Conference | 4/10/1997 | 4/10/1997 | 4/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CALLED MORRW TO CHK PROGRESS TO FINAL
|
INSP - Conference | 4/9/1997 | 4/9/1997 | 4/9/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ JOE TAWNEY, NEED MOD SHOWING FLOOR PLAN& OTHER TENANTS PE
|
INSP-Conference | 3/31/1997 | 3/31/1997 | 3/31/1997 | | PASS |
Joe Tawney
|
|
|
/ / 406 - PROJ NEVER SIGED OFF CONF WITH EARL OF WALT MORROW CONSTR AD SIGN OFF CARD TO SITE SO INSP CAN BE COMPLETED
|
INSP - Conference | 2/24/1997 | 2/24/1997 | 2/24/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CURTIS CRYSTAL OF ZGA ARCH'S. TOLD TO REFER TO TRANSMITTA DELETION OF 1HR REQS
|
INSP - Framing/Rough-in | 6/27/1996 | 6/28/1996 | 6/28/1996 | P | PART |
Carl Dependahl
|
|
|
06/28/96 340 - FRI. P.M. PART, OK TO LAY CLG TILES...NEED MECH OK
|
INSP - Conference | 6/19/1996 | 6/19/1996 | 6/19/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SENT LETTER OF TRANSMITTAL APPROVING CHANGE FROM V1HR TO VN PLACED ARCH'S LETTER REQUESTING CHANGE IN FILE. MEETS VN CRITERIA RTE SI USE
|
INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - confirmed ok of V_N const to cont
|
INSP - Conference | 6/17/1996 | 6/17/1996 | 6/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - confirmed ok of V_N const to cont
|
INSP - Conference | 6/4/1996 | 6/4/1996 | 6/4/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - ARCH SUBMITTED REQ FOR CHANGE FROM V-1HR TO V-N, APPEARS TO FOR OCCUPANCY B...GAVE TO DICK PIERCE FOR REVIEW AND FILE.
|
INSP - Conference | 6/3/1996 | 6/3/1996 | 6/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - SPOKE W/ CURTIS OF ZGA ARCH'S...RE C/N, WANTS TO RECLASS. BL V1 HR CONST AS PERMITTED...SAYS IS UNDER ALLOWABLE AREA FOR VN. WILL SUB LETTER FOR REVIEW.
|
INSP - Framing/Rough-in | 5/30/1996 | 5/31/1996 | 5/31/1996 | A | FAIL |
Carl Dependahl
|
|
|
05/30/96 340 - FRI.A.M. c/n; need arch's detail re: 1hr penetrations & const....V1hr bldg. Need entire bldg. Ok to cover wall sections not to structure
|