INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - POSTPONED TIL P.M.
|
INSP - Final | 8/1/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
Alan Hauser
|
|
|
08/02/96 350 - LATE AM PLEASE. FINAL OK
|
INSP - Letter of compliance | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11288
|
INSP - Letter of compliance | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11288
|
INSP - Final | 8/1/1996 | 8/1/1996 | 8/2/1996 | P | CANC |
Alan Hauser
|
|
|
CANCELED PER PAUL
|
INSP - Energy code compliance | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - CORRECTIONS MADE OK TO COVER POSTED
|
INSP - Framing/Rough-in | 6/21/1996 | 6/21/1996 | 6/21/1996 | | PASS |
Alan Hauser
|
|
|
06/21/96 350 - RGHN-OK ROUGH IN
|
INSP - Framing/Rough-in | 6/19/1996 | 6/20/1996 | 6/20/1996 | A | PASS |
Alan Hauser
|
|
|
06/20/96 350 - CALL PAUL ###-#### BEFORE GOING OUT. (THIS SHOULD HAVE W AFTERNOON.) R/I FRAME OK PUT UP STICKER TO INSULATE
|
INSP - Framing/Rough-in | 6/19/1996 | 6/19/1996 | 6/19/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - ok to insulate check corrections on energy inspection
|
INSP - Footings | 5/22/1996 | 5/23/1996 | 5/23/1996 | A | PASS |
Jim Sly
|
|
|
05/22/96 316 -
|