INSP - Final | 8/4/1998 | 8/4/1998 | 8/4/1998 | A | PASS |
Carl Dependahl
|
|
|
PHASE 4 TCI; CARD NOT SIGNED IN ERROR. (CLEAN-UP PENDING OCCUPANCY CARDS PER GS.)
|
INSP - Final | 8/4/1998 | | 8/4/1998 | | PASS |
|
|
|
final ok/ card not signed in error (wrong permit #'s may have been used during construction...this permit for "finish package" only... phased permit (#4)
|
Permanent Occupancy | | 4/4/1997 | 4/4/1997 | | DONE |
|
|
|
|
INSP - Final | 3/31/1997 | 4/2/1997 | 4/2/1997 | A | PASS |
Carl Dependahl
|
|
|
04/02/97 340 - FINAL FOR C/O, OK CARD TO CONT
|
INSP - Conference | 3/10/1997 | 3/10/1997 | 3/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - ACHD PAID PER SUPT...NEED P&Z & OTHER OK FOR C/O.
|
INSP - Conference | 2/10/1997 | 2/10/1997 | 2/10/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REC'D LETTER FROM CONT STATING THAT TCI STILL HAS NO AGREEME
|
INSP - Conference | 2/4/1997 | 2/4/1997 | 2/4/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CONT RE FINAL, STILL NEED ACHD & P& Z OK...
|
INSP - Final | 1/29/1997 | 1/30/1997 | 1/30/1997 | P | CANC |
Carl Dependahl
|
|
|
01/30/97 340 - REINSPECT FOR C/O.
|
INSP - Conference | 1/7/1997 | 1/7/1997 | 1/7/1997 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED PERM FINAL W/ JOE TAWNEY & STAN JOHNSON, NEED PLBG
|
INSP - Conference | 12/23/1996 | 12/23/1996 | 12/23/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - RE PERM OCCUPANCY, NEED ALL SIGN OFFS
|
INSP - Conference | 12/13/1996 | 12/13/1996 | 12/13/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED EGRESS CONTROLL DEVICES, CITY POLICY
|
INSP - Carpentry | 11/26/1996 | 11/26/1996 | 11/26/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - walk thru w/ supt.& Steve Duren; need ACHD, plbg.oks & respo control devices
|
INSP - Conference | 11/22/1996 | 11/22/1996 | 11/22/1996 | P | PASS |
Carl Dependahl
|
|
|
11/22/96 340 - DISCUSSED FINAL REQ'S, SIGN OFFS
|
INSP - Conference | 11/15/1996 | 11/15/1996 | 11/15/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - REC'D LETTER FROM ARCH RE SMOKE TEST...NOT REQ'D PER BOB G. FLOOR ONLY
|
INSP - Carpentry | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHK'D HOLD OPENS AT DBL DOORS AT CORR, REPAIR OF DOORS NOT L FOR T/O...NOT ALL COMPLETE, NEED TO SEE EGRESS CONTROL SYSTEM
|
INSP - Conference | 11/7/1996 | 11/7/1996 | 11/7/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - TEL CONF W/ SUPT
|
INSP - Final | 11/1/1996 | 11/4/1996 | 11/6/1996 | A | PASS |
Carl Dependahl
|
|
|
11/04/96 340 - W/ G.S. RE C/N ISSUED 11-4-96
|
INSP - Conference | 11/5/1996 | 11/5/1996 | 11/5/1996 | P | PASS |
Carl Dependahl
|
|
|
11/05/96 340 - HE WILL CALL FOR A TIME...CONSULTED W/ G SLANE RE C/N OF FOR T/O
|
INSP - Temporary occupancy | 11/5/1996 | 11/5/1996 | 11/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - PARTIAL,ATRIUM,THEATER & KITCHEN NOT COMPLETED. C/N ISSUED. TO CONTRACTOR.
|
INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 | | FAIL |
Carl Dependahl
|
|
|
11/01/96 340 - DOORS EARLY A.M...C/N, WILL CONSULT MGMT. PRIOR TO ISSUE COMPLETE AT ATRIUM, THEATER, & KITCHEN. NEED GENERATOR FOR TEST OF EMER. & SECURITY LOCKS & SMOKE CONTROL ACCEPTANCE
|
INSP - Final | 11/4/1996 | 11/4/1996 | 11/4/1996 | | NR |
Carl Dependahl
|
|
|
11/01/96 340 - DOORS EARLY A.M...NEED F.DEPT. SIGN OFF PRIOR TO FINAL
|
INSP - Conference | 11/1/1996 | 11/1/1996 | 11/1/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/MEL, SUPT. RE T/O FOR MAIN BLDG EXC. ATRIUM & THEATRE...W
|
INSP - Conference | 10/30/1996 | 10/31/1996 | 10/31/1996 | A | PASS |
Carl Dependahl
|
|
|
10/31/96 340 - EARLY A.M. PLEASE!!!WANTS T/O, WILL CONSULT W/ MGMT
|
INSP - Conference | 10/29/1996 | 10/29/1996 | 10/29/1996 | A | PASS |
Carl Dependahl
|
|
|
W/ STEVE DUREN RE: TEMP OCC. REQ'S
|
INSP - Framing/Rough-in | 10/25/1996 | 10/28/1996 | 10/28/1996 | A | PART |
Carl Dependahl
|
|
|
10/25/96 340 - NORTH EAST STAIR TOWER - EARLEY MON. A.M. looks ok
|
INSP - Framing/Rough-in | 10/23/1996 | 10/24/1996 | 10/24/1996 | A | PART |
Carl Dependahl
|
|
|
10/23/96 340 - FRAME & FIRE CAULKING FOR SOUTH STAIR TOWER. FIRE CAULING FLOOR.STAIR OK, CORRIDOR OK; NEED FILL IN GYP AT ROOMSIDE,2ND FL FRONT S QUAD 1
|
INSP - Conference | 10/23/1996 | 10/23/1996 | 10/23/1996 | P | PASS |
Carl Dependahl
|
|
|
W/ BOB A. RE:ENG'G LETTER FOR BEAM PROTECTION AS PER TIM HOGLAND
|
INSP - Framing/Rough-in | 10/22/1996 | 10/23/1996 | 10/23/1996 | P | NR |
Jim Sly
|
|
|
10/23/96 316 - SOUTH STAIR TOWER. NR.
|
INSP - Carpentry | 10/22/1996 | 10/22/1996 | 10/22/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Partial inspection of corridors and ceiling grid.
|
INSP - Ceiling grid | 10/21/1996 | 10/22/1996 | 10/22/1996 | A | PART |
Carl Dependahl
|
|
|
10/21/96 340 - FIRE CAULKING AND CEILING GRID...NEED TO COMPLETE CAULKIN LID AT SO. STAIRS...CLG SEISMIC OK AT CAFETERIA
|
INSP - Carpentry | 10/18/1996 | 10/21/1996 | 10/21/1996 | A | PART |
Jim Sly
|
|
|
10/21/96 316 - EARLY A.M. FIRE CAULING SOUTH CORRIDORS. MISC. AREAS SEIZ CEILING GRID. Partial OK.
|
INSP - Carpentry | 10/17/1996 | 10/17/1996 | 10/17/1996 | P | CANC |
|
|
|
10/17/96 333 - FIRE CAULKING SOUTH HALF. SEIZMIC ON CEILING GRID - SOUT Jim Sly did this morning
|
INSP - Carpentry | 10/16/1996 | 10/17/1996 | 10/17/1996 | A | NR |
Carl Dependahl
|
|
|
10/16/96 340 - FIRECAULKING - SOUTH HALF SEIZMIC ON CEILING GRID -SOUTH SIDE...sent in error, referred to 316
|
INSP - Framing/Rough-in | 10/17/1996 | 10/17/1996 | 10/17/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Corridor Caulking. Ceiling Grid....PART.
|
INSP - Conference | 10/16/1996 | 10/16/1996 | 10/16/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - 1HR DETAIL FOR STAIR LIDS IN SPEC BOOK...OK AS FRAMED
|
INSP - Carpentry | 10/15/1996 | 10/15/1996 | 10/15/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - CHK ROOF AT ATRIUM ENCLOSURE
|
INSP - Carpentry | 10/11/1996 | 10/14/1996 | 10/14/1996 | A | PART |
|
|
|
10/11/96 230 - FIRE CAULING ON NORTH/SOUTH CORRIDORS. CEILING GRID QUAD PART, NEED COMPLETE CAULKING AT 1ST FL CORR, SEAL AT STAIR & CORR 2ND FL WALLS AT ROOMSIDE WEST/FRONT STAIR
|
INSP - Framing/Rough-in | 10/14/1996 | 10/14/1996 | 10/14/1996 | A | PART |
Carl Dependahl
|
|
|
CHK'D FIRESTOPS & CLG, VARIOUS AREAS, MET W/ SLY. INSP SENT VIA LAPTOP HAS DISAPPEARED FROM PPLAN SCREENS???
|
INSP - Framing/Rough-in | 10/14/1996 | 10/14/1996 | 10/14/1996 | | PART |
Jim Sly
|
|
|
/ / 316 - Inspection of misc....Carl D, Lamar, and J Sly.
|
INSP - Conference | 10/11/1996 | 10/11/1996 | 10/11/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - EXAMINED FIRE PROTECTION ENGR'S SUBMITTAL FOR SPRINKLER PROT CORRIDOR AREAS; ALTERNATE PER TIM HOGLAND. APPEARS OK. CONSULTED W/ BOB DAVE MILLER (FD)
|
INSP - Miscellaneous | 10/10/1996 | 10/11/1996 | 10/11/1996 | A | FAIL |
Jim Sly
|
|
|
10/10/96 316 - FIRE CAULKING IN CORRIDORS ASAP 2HR walk thru of corridors with Mech, Elect, and gyp subs, and Lamar.
|
INSP - Carpentry | 10/9/1996 | 10/10/1996 | 10/11/1996 | A | PART |
Carl Dependahl
|
|
|
10/10/96 340 - FIRE CAULKING - CORRIDORS 1ST FLR. SEISMIC CEILING. 2ND FLR. SEISMIC CEILING....EARLY A.M.
|
INSP - Framing/Rough-in | 10/8/1996 | 10/9/1996 | 10/9/1996 | P | PART |
Carl Dependahl
|
|
|
10/09/96 340 - STAIR TOWERS CHK LID FRAMING & FIRESTOPPING, OK
|
INSP - Conference | 10/8/1996 | 10/8/1996 | 10/8/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ DAVE MILLER & BOB G...NEED CLARIFICATION OF F.P. ENG'S SU PROTECTION; IS LETTER ADEQUATE?
|
INSP-Sprinkler Rough-in/Hydro | 10/7/1996 | 10/8/1996 | 10/8/1996 | | PASS |
|
|
|
PARTIAL ROUGH IN OF SPKLR SYSTEM
|
INSP - Framing/Rough-in | 10/4/1996 | 10/7/1996 | 10/7/1996 | A | FAIL |
Jim Sly
|
|
|
10/07/96 316 - EARLY A.M. STAIR TOWER CEILING-FRONT ENTRY LOBBY-SKYBRIDG CAULKING CORRIDORS. C/N For APPROV OF RE-SUB DRAW FOR SPRINK CORR, STA
|
INSP - Framing/Rough-in | 10/3/1996 | 10/4/1996 | 10/4/1996 | A | PART |
Jim Sly
|
|
|
10/03/96 316 - ROOM OFFICE 10-60 10-61 10-62 GRID D-6 7-4, ENTRENCE TO T BATH COR 10-89 OPEN OFFICE 10-81 AND COR 10-14 AND AJOINING OFFICES. C/N for misc penitrations and safing insulation.
|
INSP - Conference | 10/3/1996 | 10/3/1996 | 10/3/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - discussed finish & c/o reqs w/ Lavar, ass't supt
|
INSP - Framing/Rough-in | 10/2/1996 | 10/3/1996 | 10/3/1996 | A | FAIL |
Carl Dependahl
|
|
|
10/02/96 340 - 1ST THING THURS.A.M. HALL ADJACENT TO THEATRE.BATHRMS.1117 - 1010. left c/n to fasten gyp, tie lites, seal penetrations
|
INSP - Miscellaneous | 10/1/1996 | 10/2/1996 | 10/3/1996 | A | FAIL |
Jim Sly
|
|
|
10/02/96 316 - FIRE CAULKING, COORIDOR #1014 ETC. ALSO SEE FRAMING/ROUGH-IN AND CEILING GRID INSPECTIONS SCHEDULED AT SAME BUILDING, SAME TIME Carl and I ...Misc insp.....C/N.
|
INSP - Ceiling grid | 10/1/1996 | 10/2/1996 | 10/2/1996 | A | CANC |
Jim Sly
|
|
|
10/01/96 316 - CEILING GRID -- ALSO SEE FRAMING ROUGH-IN AND MISC. INSPE SAME BUILDING, SAME TIME. CANCEL TO PM........ I WAS GIVEN AREAS TO INSPECT, BUT FOR SOME REASON THEY DIDN'T SHOW UP IN NOTES. THERE WAS A LARGE COORIDOR AREA AND ADJOI
|
INSP - Conference | 10/2/1996 | 10/2/1996 | 10/2/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ JIM SLY, HE WAS SENT INSP'S IN ERROR...CHK'D HIS NOTES FO
|
INSP - Framing/Rough-in | 10/1/1996 | 10/2/1996 | 10/2/1996 | A | CANC |
Jim Sly
|
|
|
10/01/96 316 - THEATER CEILING, WOMEN'S #1091, COORIDOR #1089 ALSO SEE CEILING GRID AND MISCELLANEOUS INSPECTIONS SCHEDULE FOR SAME BUILDING, SAME TIME. CANCEL TIL PM.....
|
INSP - Letter of compliance | 10/2/1996 | 10/2/1996 | 10/2/1996 | | CANC |
Jim Sly
|
|
|
/ / 316 - Cancel to PM.
|
INSP - Letter of compliance | 10/2/1996 | 10/2/1996 | 10/2/1996 | | CANC |
Jim Sly
|
|
|
/ / 316 - Cancel to PM.
|
INSP-Sprinkler Rough-in/Hydro | 10/2/1996 | 10/2/1996 | 10/2/1996 | P | NR |
Joe Tawney
|
|
|
10/02/96 406 - CALL JASON LANDON - ###-####
|
INSP - Framing/Rough-in | 9/30/1996 | 10/1/1996 | 10/1/1996 | A | PART |
Jim Sly
|
|
|
09/30/96 316 - CEILING - HALL ADJACENT TO THEATRE BATHRMS.1###-####. Misc Inspections complete....Log sheet at job shack. C/N Need detail for attachment of framed ceiling in theater.
|
INSP - Framing/Rough-in | 9/27/1996 | 9/30/1996 | 9/30/1996 | A | PART |
Jim Sly
|
|
|
09/27/96 316 - Inspection of rated wall penitrations in misc restrooms, and misc. List on back of occ. card. Inspection of frame ceiling in theater...Need mechanical rough-in inspection.
|
INSP - Conference | 9/27/1996 | 9/27/1996 | 9/27/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CARL WESTFALL RE STAIR LID
|
INSP - Conference | 9/27/1996 | 9/27/1996 | 9/27/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ CARL WESTFALL RE STAIR LID
|
INSP - Carpentry | 9/26/1996 | 9/26/1996 | 9/26/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED ARCHS DETAIL RE LID AT STAIRS,PLAN SHOWS GYP W/O DETAIL
|
INSP - Carpentry | 9/26/1996 | 9/26/1996 | 9/26/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED ARCHS DETAIL RE LID AT STAIRS,PLAN SHOWS GYP W/O DETAIL
|
INSP - Conference | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/ MEL S. SUPT. RE ENG'S FIRE PROTECTION REPORT AT CORRIDORS
|
INSP - Framing/Rough-in | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - GREASE DUCT PABCO LINER OK, SHAFT AT 2ND FL PART SEALED ,OK INSTALL 1" SHAFTWALL SYSTEM TO DECK; STILL NEED FIRESTOP RATED WALL PENETRATIONS, MANY MISSED. REQUESTED DETAIL RE GYP LID AT STAIRS AT END BLDG, NO DETAIL W/ PLAN
|
INSP - Carpentry | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | PASS |
Carl Dependahl
|
|
|
PART, SENT RESPONSE TO ARCH. TO MEL SCHUMAKER AT JOB & RAY HOOBING AT CM CO.
|
INSP - Ceiling grid | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | PASS |
Jim Sly
|
|
|
09/20/96 316 - Ceiling grid OK at 2nd floor northwest corner...large roo 2nd floor south west corner...large room to beam (divider). Both sections exclude adjacent small rooms.
|
INSP - Conference | 9/23/1996 | 9/23/1996 | 9/23/1996 | P | PASS |
Carl Dependahl
|
|
|
W/ BOB G. RE LETTERSENT BY RAY HOOBING OF CM CO. WE'VE REQUESTED FIRE PROTECTION ENG'S APPROVAL AS ALTERNATE TO ENCLOSING 1HR. CORRIDORS & T RATING PER TIM H.
|
INSP - Conference | 9/19/1996 | 9/19/1996 | 9/19/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CONF RE C/N OF 9-11 W/ GS
|
INSP - Carpentry | 9/17/1996 | 9/18/1996 | 9/18/1996 | P | PART |
Carl Dependahl
|
|
|
09/17/96 340 - FIRE INSULATION ON KITCHEN DUCT/TCI PART, NEED TO COMPLETE MASTIC AND CLEAN-OUT ACCESS COVERS PER PABCO SPEC
|
INSP - Conference | 9/17/1996 | 9/17/1996 | 9/17/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - MET W/ ARCH. RODNEY MORRISON; HE PRESENTED HIS RATIONALE FOR RATING AT PENETRATIONS. WILL ALSO HAVE "CODE EXPERT" CHK. IWILL TAKE UND ADVISEMENT. INFORMED GS & DNH. NO RESOLUTION AS YET. KEEP CN
|
INSP - Conference | 9/17/1996 | 9/17/1996 | 9/17/1996 | P | CANC |
Jim Sly
|
|
|
09/17/96 316 - WANTS TO TALK TO CARL - I called Carl...Carl to do.
|
INSP - Conference | 9/13/1996 | 9/13/1996 | 9/13/1996 | P | PASS |
Carl Dependahl
|
|
|
09/13/96 340 - CONF W/ MEL S, STEVE DUREN, & LAVAR RE C/N OF 9-11-96...C MORRISEY RE CORR & SHAFT PENETRATIONS. KEEP C/N
|
INSP - Framing/Rough-in | 9/11/1996 | 9/11/1996 | 9/11/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - C/N, NEED T RATING AT STRUCTURAL PENETRATIONS AT CORRIDORS A DETAIL FOR ALTERNATE. UBC 711 & 1004
|
INSP - Framing/Rough-in | 9/11/1996 | 9/11/1996 | 9/11/1996 | P | CANC |
Jim Sly
|
|
|
09/11/96 316 - DUCT WORK AND SHAFTS AND FIRE COCKING LET OPEN Cancel....Gave to C. Dependahl.
|
INSP - Conference | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FIREMASTER BLANKET SUBMITTAL INFO
|
INSP - Conference | 9/9/1996 | 9/9/1996 | 9/9/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - FIREMASTER BLANKET SUBMITTAL INFO
|
INSP - Conference | 9/5/1996 | 9/5/1996 | 9/5/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - w/DICK BREWER OF 3M CO; WILL SEND CREDENTIALS OF POSSIBLE SP FACTORY TECH ENG'S FOR FIREMASTER INSUL SYSTEM...ALSO DISCUSSED W/ BOB GARRISON
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED FIREMASTER GREASE DUCT PROTECTION SYSTEM W/ BOB GA ICBO, THE PRODUCT HAS SBCCI OK AND PENDING ICBO OK. ALSO OK FOR PROTECTI STRUCT MEMBERS. GAVE CONT TENTATIVE OK TO USE IF SPEC. INSP USED
|
INSP - Conference | 9/4/1996 | 9/4/1996 | 9/4/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - DISCUSSED FIREMASTER GREASE DUCT PROTECTION SYSTEM W/ BOB GA ICBO, THE PRODUCT HAS SBCCI OK AND PENDING ICBO OK. ALSO OK FOR PROTECTI STRUCT MEMBERS. GAVE CONT TENTATIVE OK TO USE IF SPEC. INSP USED
|
INSP - Conference | 9/3/1996 | 9/3/1996 | 9/3/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - SUBMITTAL DOC'S FOR FIREMASTER DUCT INSUL SYSTEM W/ BARRY HO CALL IN TO ICBO
|
INSP - Conference | 8/30/1996 | 8/30/1996 | 8/30/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - W/YMC RE SHAFT & DUCT INSUL...NEED ARCH'S LETTER RE SHAFT, M FIREMASTER SYSTEM
|
INSP - Carpentry | 8/29/1996 | 8/29/1996 | 8/29/1996 | | FAIL |
Carl Dependahl
|
|
|
/ / 340 - chk'd shaft at grease ducts & hvac; rec'd resub for grease d NER for ok. Asked for arch's clarification of shafts thru floor
|
INSP - Conference | 8/28/1996 | 8/28/1996 | 8/28/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - NEED MANUF'S INSTRUCTION FOR PABCO DUCT SYSTEM; RESUBMITTAL DUCT SYSTEM FOR APPROVAL...KEEP FRAME C/N
|
INSP - Carpentry | 8/26/1996 | 8/27/1996 | 8/27/1996 | A | FAIL |
Carl Dependahl
|
|
|
08/27/96 340 - DUCT INSULATION - GENERAL TYPE INSP....... KEEP C/N, NEED CLARIFICATION ON SHAFT
|
INSP - Framing/Rough-in | 8/26/1996 | 8/26/1996 | 8/26/1996 | P | NR |
|
|
|
08/26/96 333 - given to jim
|
INSP - Framing/Rough-in | 8/8/1996 | 8/8/1996 | 8/8/1996 | | PART |
Jim Storey
|
|
|
/ / 301 - framing ok for one side cover of fire rated const. bottom of completed
|
INSP - Framing/Rough-in | 8/6/1996 | 8/6/1996 | 8/7/1996 | P | PART |
Jim Storey
|
|
|
08/06/96 301 - 1ST & 2ND FLOORS... FRAM-OK FRAMING CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Framing/Rough-in | 7/23/1996 | 7/24/1996 | 7/24/1996 | A | PART |
Jim Storey
|
|
|
07/24/96 301 - trans carl
|
INSP - Conference | 7/19/1996 | 7/19/1996 | 7/19/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - CONF W/ MEL SHUMAKER, FLOYD V. & JOE TAWNY
|
INSP - Conference | 7/16/1996 | 7/16/1996 | 7/16/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - REQ'S FOR FIRESTOPPING & ENG'S ACCEPTANCE. KEEP CN
|
INSP - Framing/Rough-in | 7/12/1996 | 7/12/1996 | 7/12/1996 | P | FAIL |
Carl Dependahl
|
|
|
07/12/96 340 - 2nd flr. n/w & s/w quadrant p.m. C/N, NEED ENG'S OK, FIRESTOPS,ID STEEL STUDS,COMPLETE SHAFTS
|
INSP - Footings | 7/11/1996 | 7/11/1996 | 7/11/1996 | P | NR |
Carl Dependahl
|
|
|
07/11/96 340 - 2nd flr. n/w & s/w quadrant TCI...NOT FTG BUT FRAME INSP...NEED MECH OK. HAS BACK ORDERED SMOKE-FIRE DAMPERS. MULTIPLE PERMITS
|
INSP - Conference | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - T/I ISSUED?...CHK'D PLAN DETAIL RE PRECAST "GUTTER" W/ MEL S
|