Permanent Occupancy | | 6/30/1999 | 6/30/1999 | | DONE |
|
|
|
|
INSP - Final | 10/3/1996 | 10/4/1996 | 10/4/1996 | P | NR |
Jim Storey
|
|
|
10/04/96 301 -
|
INSP - Final | 10/2/1996 | 10/3/1996 | 10/3/1996 | A | PASS |
|
|
|
10/02/96 405 - TED MASON - ###-####
|
INSP - Carpentry | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | FAIL |
Wes Worcester
|
|
|
2x4 placed on edge on top of 4x hdr on outside wall under rim joist carrying roof ld from above. Inadequate brng of tji's as to end brng requirements quite probable....
|
INSP - Conference | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | FAIL |
Wes Worcester
|
|
|
posted c/n as per Bob Archibald
|
INSP - Conference | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | PART |
Wes Worcester
|
|
|
met w/Ted reference inadequate tji's end support and stud walls not perpendicular as per std const criteria.
|
INSP - Energy code compliance | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | PART |
Wes Worcester
|
|
|
already posted by someone
|
INSP - Energy code compliance | 7/24/1996 | 7/24/1996 | 7/24/1996 | P | NR |
Jim Storey
|
|
|
07/24/96 301 - transphered to wes w.
|
INSP - Framing/Rough-in | 7/22/1996 | 7/23/1996 | 7/23/1996 | A | NR |
Jim Storey
|
|
|
07/22/96 301 - transphered to kim
|
INSP - Framing/Rough-in | 7/23/1996 | 7/23/1996 | 7/23/1996 | | PASS |
|
|
|
/ / 333 - FRAM-OK FRAMING
|
INSP - Footings | 6/5/1996 | 6/5/1996 | 6/5/1996 | P | PASS |
Jim Storey
|
|
|
06/05/96 301 - EARLY P.M. FTG -OK FOOTING
|