Permanent Occupancy | | 6/30/1999 | 6/30/1999 | | DONE |
|
|
|
|
INSP - Final | 11/27/1996 | 11/27/1996 | 11/27/1996 | P | CANC |
Jim Storey
|
|
|
11/27/96 301 - 4 plex
|
INSP - Final | 11/22/1996 | 11/22/1996 | 11/22/1996 | | PASS |
|
|
|
/ / 405 - smoke det check, one unit occupied
|
INSP - Final | 11/22/1996 | 11/22/1996 | 11/22/1996 | P | CANC |
|
|
|
done in am
|
INSP - Energy code compliance | 8/22/1996 | 8/23/1996 | 8/23/1996 | A | PASS |
Jim Storey
|
|
|
08/23/96 301 - INSL-OK INSULATION-ENERGY CODE
|
INSP - Framing/Rough-in | 8/23/1996 | 8/23/1996 | 8/23/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 8/20/1996 | 8/21/1996 | 8/21/1996 | P | FAIL |
Jim Storey
|
|
|
08/21/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Carpentry | 6/24/1996 | 6/24/1996 | 6/24/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Met with Ted Mason to talk about specifics of job. Pre-Con C
|
INSP - Conference | 6/20/1996 | 6/20/1996 | 6/20/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Met with framer to go over common wall questions and misc.
|
INSP - Conference | 6/18/1996 | 6/18/1996 | 6/18/1996 | | PASS |
Jim Sly
|
|
|
/ / 316 - Met with Framer to talk about misc construction of project.
|
INSP - Footings | 6/10/1996 | 6/10/1996 | 6/10/1996 | P | PASS |
Jim Sly
|
|
|
06/10/96 316 -
|