INSP - Final | 7/26/1996 | 7/26/1996 | 7/26/1996 | | PASS |
|
|
|
|
INSP - Final | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | FAIL |
Jim Storey
|
|
|
07/26/96 301 - JOHN FROM BLACKSTEAD WILL CALL YOU IN AM TO SET TIME SO H CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Letter of compliance | | | 7/26/1996 | | PASS |
|
|
|
ISSUED #10988 C OF C BY MJW THIS DATE.
|
INSP - Carpentry | 7/18/1996 | 7/18/1996 | 7/18/1996 | P | PASS |
|
|
|
07/18/96 338 - done this am
|
INSP - Conference | 7/18/1996 | 7/18/1996 | 7/18/1996 | | PASS |
|
|
|
/ / 338 - stair rails are made ok
|
INSP - Framing/Rough-in | 7/3/1996 | 7/3/1996 | 7/2/1996 | P | PASS |
|
|
|
07/03/96 338 - MADE OK ENG SUPPLIED MADE OK
|
INSP - Carpentry | 7/1/1996 | 7/2/1996 | 7/2/1996 | A | FAIL |
Jim Sly
|
|
|
07/01/96 316 - SHEAR PANEL NAILING. FIRST THING TUES.A.M. PLEASE Need documentation...engineering..etc. No paperwork on site.
|
INSP - Energy code compliance | 6/28/1996 | 6/28/1996 | 6/28/1996 | P | PART |
Carl Dependahl
|
|
|
06/28/96 340 - INS OK...NEED SHEAR WALLS INSP'D
|
INSP - Framing/Rough-in | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED CALC FOR CHANGED HEADER AT ENTRY...BCI OK FOR BRG OF VA CVER EXC. FRONT WALLS & VAULT LID
|
INSP - Framing/Rough-in | 6/28/1996 | 6/28/1996 | 6/28/1996 | | PART |
Carl Dependahl
|
|
|
/ / 340 - NEED CALC FOR CHANGED HEADER AT ENTRY...BCI OK FOR BRG OF VA CVER EXC. FRONT WALLS & VAULT LID
|
INSP - Energy code compliance | 6/26/1996 | 6/27/1996 | 6/27/1996 | P | NR |
Carl Dependahl
|
|
|
06/27/96 340 - NOT FINISHED
|
INSP - Framing/Rough-in | 6/25/1996 | 6/26/1996 | 6/26/1996 | P | FAIL |
Carl Dependahl
|
|
|
06/26/96 340 - NEED TO COMPLETE ENG'G AS SHOWN...OK TO INSUL
|
INSP - Conference | 6/25/1996 | 6/25/1996 | 6/25/1996 | | PASS |
Carl Dependahl
|
|
|
/ / 340 - re eng'g requested
|
INSP - Footings | 5/21/1996 | 5/22/1996 | 5/22/1996 | A | PART |
Carl Dependahl
|
|
|
05/21/96 340 - Request for early a.m. inspection please. POURED W/O INSP, LOOKS OK
|