Permanent Occupancy | | 7/7/1997 | 7/7/1997 | | DONE |
|
|
|
|
INSP - Final | 6/10/1997 | 6/10/1997 | 6/10/1997 | P | PASS |
|
|
|
06/10/97 338 - FINAL FOR C/O. MADEOK OCC REQ CARD NOT ON SITE STRUC OK SIGNED OFF
|
INSP-Final Inspection | 6/9/1997 | 6/9/1997 | 6/9/1997 | P | PASS |
Joe Tawney
|
|
|
06/09/97 406 - reinspection REINSP FOR FINAL OK FOR CERT OF COMPLETION
|
INSP-Final Inspection | 5/30/1997 | 5/30/1997 | 6/2/1997 | P | FAIL |
Joe Tawney
|
|
|
05/30/97 406 - REINSP FOR FINAL AND FINAL ON PLAY AREA FAIL SEE PERRY AB ACTUAL CONSTRUCTION
|
INSP - Roof | 4/7/1997 | 4/8/1997 | 4/7/1997 | P | NR |
|
|
|
04/08/97 338 - Outstanding plumbing fees still owed, no temp. occ. cert. this is remedied as per Jim Toombs. Please mention this to him. Thanks........Cathy NO ACCESS
|
INSP - Roof | 4/7/1997 | 4/7/1997 | 4/7/1997 | | PASS |
|
|
|
/ / 338 - NO ACCESS madeok to cover roof
|
INSP - Conference | 1/17/1997 | 1/17/1997 | 1/17/1997 | | PASS |
|
|
|
/ / 338 - with fire insp not readt for 14
|
INSP - Final | 1/16/1997 | 1/17/1997 | 1/17/1997 | A | NR |
Joe Tawney
|
|
|
NOT READY FOR FINAL NO SIGN OFF CARD NO APPROVED RESUBMITTAL ON CHANGE TO BLDG CONSTRUCTION
|
INSP - Final | 1/16/1997 | 1/17/1997 | 1/17/1997 | A | PART |
|
|
|
01/17/97 338 - AFTER 10:00 signed the temp col
|
INSP - Final | 1/17/1997 | 1/17/1997 | 1/17/1997 | | PART |
|
|
|
OK FOR TEMP OCC PLAY AREA NOT YET CONSTRUCTED RESUBMIT PLAN FOR PLAY AREA REPAIR EMERG LIGHT MOUNT EXT MOUNT EXIT SIGN
|
INSP - Conference | 1/14/1997 | 1/14/1997 | 1/14/1997 | | PASS |
|
|
|
/ / 338 - CONFERENCE ON TEMP OCC NEED OCC REC CARD SIGNED COMPLETE AN PUBLIC PROTECTION FROM CONSTRUCTION
|
INSP - Conference | 1/13/1997 | 1/13/1997 | 1/13/1997 | | PASS |
|
|
|
/ / 338 - CONTRACTOR CALLED TO CANCELL TIL 01-14-97
|
INSP - Final | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | NR |
Joe Tawney
|
|
|
NOT READY FOR FINAL
|
INSP - Framing/ Rough-in | 1/13/1997 | 1/13/1997 | 1/13/1997 | | FAIL |
|
|
|
/ / 338 - NOT READY CORRECTION ISSUED
|
INSP - Temporary occupancy | 1/13/1997 | 1/13/1997 | 1/13/1997 | P | CANC |
|
|
|
cancelled by the cont. not ready
|
INSP - Temporary occupancy | 1/13/1997 | 1/13/1997 | 1/13/1997 | | CANC |
|
|
|
01/13/97 338 -
|
INSP - Flatwork | 12/2/1996 | 12/2/1996 | 12/2/1996 | P | PASS |
|
|
|
12/02/96 338 - made ok
|
INSP - Framing/Rough-in | 11/21/1996 | 11/22/1996 | 11/22/1996 | A | PASS |
|
|
|
|
INSP - Foundation | 11/15/1996 | 11/15/1996 | 11/15/1996 | P | PASS |
|
|
|
11/15/96 338 - FND. STEM WALL FDN -OK FOUNDATION
|
INSP - Footings | 11/8/1996 | 11/8/1996 | 11/8/1996 | P | |
|
|
|
|
INSP - Flatwork | 10/25/1996 | 10/25/1996 | 10/25/1996 | P | PASS |
|
|
|
10/25/96 339 - concrete/slab cooler room made ok
|
INSP - Footings | 10/23/1996 | 10/24/1996 | 10/24/1996 | A | CANC |
|
|
|
10/23/96 338 - footing and stem wall cancelled by th builder
|
INSP - Foundation | 10/18/1996 | 10/21/1996 | 10/21/1996 | A | PASS |
|
|
|
10/21/96 338 - WILL BEGIN POURING AT 10AM STEM WALL INSPECTION
|
INSP - Footings | 10/16/1996 | 10/16/1996 | 10/16/1996 | P | PASS |
|
|
|
10/16/96 338 - PREFERS AROUND 2PM made ok
|
INSP - Footings | 10/11/1996 | 10/14/1996 | 10/14/1996 | A | PART |
|
|
|
10/14/96 338 - HE WILL CALL AND SEE IF YOU CAN DO IT 10/11 PM PLAY AREA made ok for the rear section only. no responsible person or signoff car site
|
INSP - Footings | 10/10/1996 | 10/10/1996 | 10/10/1996 | | PASS |
Jim Storey
|
|
|
/ / 301 - FRMS-OK FORMS-REBAR COOLER
|
INSP - Footings | 10/10/1996 | 10/10/1996 | 10/10/1996 | P | PASS |
Jim Storey
|
|
|
10/10/96 301 - PLEASE CALL ###-#### (KIRK) HE NEEDS TO SET UP TIME FOR Y FTG -OK FOOTING MADE SOME REVISIONS ON LOCATION COOLER ADDITION.
|
INSP - Footings | 10/4/1996 | 10/7/1996 | 10/7/1996 | A | CANC |
|
|
|
|
INSP - Footings | 11/6/1996 | 11/7/1996 | 1/3/1980 | A | PASS |
|
|
|
11/07/96 338 - r-bar placed made ok to pour
|