INSP - Final | 8/27/1996 | 8/28/1996 | 8/28/1996 | A | NR |
Jim Storey
|
|
|
08/28/96 301 - trans to wes w.
|
INSP - Conference | 8/27/1996 | 8/27/1996 | 8/27/1996 | P | PART |
Wes Worcester
|
|
|
talked to Hibbard @ insp process and o2 cabinet
|
INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | P | PART |
Wes Worcester
|
|
|
elect was temo, gave front desk staff a hard time @ insp request
|
INSP - Final | 8/27/1996 | 8/27/1996 | 8/27/1996 | P | PASS |
|
|
|
08/27/96 405 - reinspect sprinkler system perm occ signed
|
INSP - Final | 8/26/1996 | 8/26/1996 | 8/26/1996 | | FAIL |
|
|
|
/ / 405 - c/n issued med gas system was expanded from initial pressure sprinkler system out of date on inspections - last was 1992
|
INSP - Carpentry | 7/31/1996 | 8/1/1996 | 8/1/1996 | A | PASS |
Wes Worcester
|
|
|
RUDY HATCHER - ###-####. RATED SHAFT. ok by 342
|
INSP - Carpentry | 7/23/1996 | 7/23/1996 | 7/23/1996 | A | PASS |
Wes Worcester
|
|
|
hdr and walls ok
|
INSP - Conference | 7/23/1996 | 7/23/1996 | 7/23/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/23/1996 | 7/23/1996 | 7/23/1996 | A | PART |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/22/1996 | 7/23/1996 | 7/23/1996 | A | NR |
Jim Storey
|
|
|
07/22/96 301 - transphered to wes w
|
INSP - Framing/Rough-in | 7/22/1996 | 7/22/1996 | 7/22/1996 | P | FAIL |
Jim Storey
|
|
|
07/22/96 301 - UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|