INSP - Carpentry | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
Wes Worcester
|
|
|
nailing edges at 6" oc and 12" in the field
|
INSP - Conference | 9/26/1996 | 9/26/1996 | 9/26/1996 | P | PASS |
Wes Worcester
|
|
|
will ck floor joists at final
|
INSP - Final | 9/25/1996 | 9/26/1996 | 9/26/1996 | P | NR |
Wes Worcester
|
|
|
|
INSP - Conference | 8/2/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
Wes Worcester
|
|
|
discussed compaction effort results and are ok for ftg
|
INSP - Footings | 8/1/1996 | 8/2/1996 | 8/2/1996 | A | NR |
Wes Worcester
|
|
|
no bds in ftg
|
INSP - Site Preparation | 8/2/1996 | 8/2/1996 | 8/2/1996 | A | PASS |
Wes Worcester
|
|
|
|
INSP - Conference | 7/25/1996 | 7/25/1996 | 7/25/1996 | A | PASS |
Wes Worcester
|
|
|
gave numbers of spec insp firms
|
INSP - Footings | 7/24/1996 | 7/25/1996 | 7/25/1996 | A | CANC |
Wes Worcester
|
|
|
COMPACTION posted requirement for report
|
INSP - Conference | 6/28/1996 | 6/28/1996 | 6/28/1996 | P | PASS |
Wes Worcester
|
|
|
placing interior ftgs for lds from above and to shorten spans of joists
|