INSP - Letter of compliance | | | 12/20/1996 | | PASS |
|
|
|
|
INSP - Final | 12/10/1996 | 12/10/1996 | 12/10/1996 | P | PASS |
Jim Storey
|
|
|
12/10/96 301 - FINAL REINSPECT FNL -OK FINAL
|
INSP - Final | 12/9/1996 | 12/9/1996 | 12/9/1996 | P | FAIL |
Jim Storey
|
|
|
12/09/96 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED guard rail min 42 elv w/4 inc opening.
|
INSP - Energy code compliance | 8/22/1996 | 8/22/1996 | 8/22/1996 | P | PASS |
|
|
|
08/22/96 400 -
|
INSP - Framing/Rough-in | 8/19/1996 | 8/20/1996 | 8/20/1996 | A | PASS |
|
|
|
08/19/96 400 -
|
INSP - Framing/Rough-in | 8/16/1996 | 8/19/1996 | 8/19/1996 | A | FAIL |
|
|
|
08/19/96 400 - req mech R/I b 4 frame insp, req code 4 gate
|
INSP - Footings | 6/20/1996 | 6/20/1996 | 6/20/1996 | P | FAIL |
|
|
|
06/20/96 400 - security gate closed, could not locate by address or acce
|