INSP - Final | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Final | 9/25/1996 | 9/27/1996 | 9/27/1996 | A | FAIL |
Wes Worcester
|
|
|
|
INSP - Letter of compliance | 9/27/1996 | 9/27/1996 | 9/27/1996 | P | PASS |
Wes Worcester
|
|
|
|
INSP - Set-back | 9/27/1996 | 9/27/1996 | 9/27/1996 | | |
|
|
|
|
INSP - Final | 9/23/1996 | 9/26/1996 | 9/26/1996 | A | NR |
Wes Worcester
|
|
|
cancelled this insp. until friday.
|
INSP - Energy code compliance | 8/2/1996 | 8/2/1996 | 8/2/1996 | | PASS |
|
|
|
Reviewed and approved for cover, George S., and Bob A.
|
INSP - Carpentry | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | FAIL |
Wes Worcester
|
|
|
truss eng still not right
|
INSP - Conference | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | FAIL |
Wes Worcester
|
|
|
contractor was sarcastic, unable to read truss eng, did not finish required bracing, I left once the "f" word was used in refernce to the eng, inspection, etc
|
INSP - Conference | 8/1/1996 | 8/1/1996 | 8/1/1996 | A | NR |
Wes Worcester
|
|
|
|
INSP - Carpentry | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
truss eng wrong
|
INSP - Conference | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Wes Worcester
|
|
|
attempted to explain eng but still done wrong
|
INSP - Energy code compliance | 7/31/1996 | 7/31/1996 | 7/31/1996 | | NR |
Wes Worcester
|
|
|
|
INSP - Framing/Rough-in | 7/29/1996 | 7/30/1996 | 7/30/1996 | P | PASS |
|
|
|
07/30/96 400 -
|
INSP - Footings | 5/28/1996 | 5/28/1996 | 5/28/1996 | P | FAIL |
|
|
|
05/28/96 400 - poured pior to inspection check setbacks at framing
|