INSP - Final | 3/31/1998 | 3/31/1998 | 4/1/1998 | P | PASS |
Jim Storey
|
|
|
04/01/98 301 - FNL -OK FINAL
|
Permanent Occupancy | | 3/30/1998 | 3/30/1998 | | DONE |
|
|
|
|
INSP - Final | 3/4/1998 | 3/6/1998 | 3/6/1998 | A | PART |
Jim Storey
|
|
|
03/06/98 301 - Final for the Human Society. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pending s.g. ubc 54
|
INSP-Final Inspection | 3/4/1998 | 3/5/1998 | 3/5/1998 | A | PASS |
Joe Tawney
|
|
|
03/05/98 406 - robert ###-#### this is for a final occ REINSP ON ALARM SYSTEM OK FOR PERM OCC
|
INSP - Final | 3/4/1998 | 3/5/1998 | 3/4/1998 | A | CANC |
Jim Storey
|
|
|
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]). Contact: [3717147].
|
INSP-Final Inspection | 2/19/1998 | 2/20/1998 | 2/20/1998 | P | CANC |
Joe Tawney
|
|
|
02/20/98 406 - SCHEDULED FOR 2:00 WITH ROBERT--###-#### DOGGIE POUND CANCELLED AT ROBERT'S REQUEST WILL RESCHED
|
INSP - Conference | 8/19/1997 | 8/21/1997 | 8/21/1997 | A | PASS |
Joe Tawney
|
|
|
08/20/97 406 - DISCUSSED CHANGES IN ALARM SYSTEM TO MEET CODE RESUBMITTA
|
INSP - Final | 7/7/1997 | 7/8/1997 | 7/8/1997 | P | PASS |
Jim Storey
|
|
|
07/08/97 301 - REINSPECTION TCO -TEMP C OF O ISSUED w/c/n isued
|
INSP - Final | 7/3/1997 | 7/7/1997 | 7/7/1997 | A | FAIL |
Jim Storey
|
|
|
07/07/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Final Inspection | 7/3/1997 | 7/3/1997 | 7/3/1997 | P | PASS |
Joe Tawney
|
|
|
07/03/97 406 - FINAL OK FOR TEMP OCC ALARM SUBMITTAL KNOX BOX CURB STRI
|
INSP-Final Inspection | 7/1/1997 | 7/2/1997 | 7/2/1997 | P | FAIL |
Joe Tawney
|
|
|
07/01/97 406 - HE SAID YOU WOULD MEET AT 2 O'CLOCK FINAL FAIL ALARM SYSTEM SUBMITTAL DUCT DET NOT HOOKED UP CAN NOT SEE FIRE DAMPERS TO VERIFY IF THEY CLOSE SPKLR SYSTEM OK
|
INSP - Wall cover | 6/27/1997 | 6/30/1997 | 6/30/1997 | P | NR |
Jim Storey
|
|
|
06/30/97 301 - grid inspection CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Ceiling grid | 6/20/1997 | 6/23/1997 | 6/23/1997 | A | FAIL |
Jim Storey
|
|
|
06/23/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED penatrations
|
INSP-Sprinkler Rough-in/Hydro | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PASS |
|
|
|
JOHN tvfp, HYDRO, FLUSH missing hanger and plumbing pipe hanging off sprinkler found at rough in corrected
|
INSP-Supply line flush | 6/23/1997 | 6/23/1997 | 6/23/1997 | P | PASS |
|
|
|
FLUSH
|
INSP - Ceiling grid | 6/19/1997 | 6/20/1997 | 6/20/1997 | P | CANC |
Jim Storey
|
|
|
06/20/97 301 - cancled
|
INSP - Ceiling grid | 6/16/1997 | 6/16/1997 | 6/16/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - SCLG-OK SUSPENDED CEILING EAST END OK
|
INSP - Wall cover | 6/13/1997 | 6/16/1997 | 6/16/1997 | A | PASS |
Jim Storey
|
|
|
06/16/97 301 - FIRE RATED ASSEMBLY INSP. OF LOBBY AREA OK.
|
INSP - Carpentry | 6/11/1997 | 6/12/1997 | 6/12/1997 | A | PART |
Jim Storey
|
|
|
06/12/97 301 - FIRE CORRIDOR....8# AND 5# OK FOR TILE ON CIELING
|
INSP - Framing/Rough-in | 5/20/1997 | 5/20/1997 | 5/21/1997 | P | PASS |
Jim Storey
|
|
|
05/20/97 301 - CORRIDOR OK #18
|
INSP - Framing/Rough-in | 5/5/1997 | 5/5/1997 | 5/6/1997 | P | NH |
Jim Storey
|
|
|
05/06/97 301 - trans to bob a.
|
INSP - Framing/Rough-in | 4/25/1997 | 4/25/1997 | 4/25/1997 | P | CANC |
Jim Storey
|
|
|
04/25/97 301 - this was set for thursday pm see if you can make it out t
|
INSP - Framing/Rough-in | 4/23/1997 | 4/24/1997 | 4/25/1997 | A | PASS |
Jim Storey
|
|
|
04/24/97 301 - FRAM-OK FRAMING
|
INSP-Sprinkler Rough-in/Hydro | 4/22/1997 | 4/22/1997 | 4/22/1997 | P | PART |
Joe Tawney
|
|
|
04/22/97 406 - SPKLR ROUGH IN JOHN TV FIRE ROUGH IN OK TO COVER WHERE REQUIRED
|
INSP - Carpentry | 4/16/1997 | 4/16/1997 | 4/16/1997 | | PASS |
|
|
|
Inside of education corridor ok for taping. Main reception area ok for cover. Also addressed safety glazing requirements.
|
INSP - Carpentry | 4/14/1997 | 4/15/1997 | 4/15/1997 | A | FAIL |
Bob Archibald
|
|
|
FIREWALL. Not ready.
|
INSP - Carpentry | 4/14/1997 | 4/14/1997 | 4/14/1997 | | CANC |
|
|
|
04/15/97 333 - given to bob
|
INSP - Framing/Rough-in | 4/9/1997 | 4/10/1997 | 4/11/1997 | A | PART |
Jim Storey
|
|
|
interior frame ok for clinic area.
|
INSP - Carpentry | 3/28/1997 | 3/31/1997 | 3/30/1997 | A | PASS |
|
|
|
03/31/97 338 - FIREWALL
|
INSP - Framing/Rough-in | 3/24/1997 | 3/25/1997 | 3/26/1997 | P | PART |
Jim Storey
|
|
|
03/26/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO ONE SIDE CLASS ROOM COR
|
INSP - Masonry | 3/12/1997 | 3/13/1997 | 3/13/1997 | A | PASS |
Jim Storey
|
|
|
03/13/97 301 - grouting at 8:30 a.m. MASN-REBAR OK
|
INSP - Masonry | 3/11/1997 | 3/12/1997 | 3/12/1997 | P | PART |
Jim Storey
|
|
|
03/12/97 301 - covered by si
|
INSP - Masonry | 3/10/1997 | 3/11/1997 | 3/11/1997 | A | PASS |
Jim Storey
|
|
|
03/11/97 301 - masonry grout inspection MASN-REBAR OK
|
INSP - Miscellaneous | 2/18/1997 | 2/18/1997 | 2/18/1997 | | PEND |
|
|
|
Masonry and structural steel,flat work in progress and being covered by special inspection.
|
INSP - Foundation | 1/17/1997 | 1/21/1997 | 1/21/1997 | A | PASS |
Bob Archibald
|
|
|
Covered by special inspection.
|
INSP - Foundation | 1/13/1997 | 1/14/1997 | 1/14/1997 | A | PASS |
Jim Storey
|
|
|
01/14/97 301 - FDN -OK FOUNDATION
|
INSP - Foundation | 12/30/1996 | 12/30/1996 | 12/30/1996 | P | PASS |
|
|
|
ok
|
INSP - Masonry | 12/30/1996 | 12/30/1996 | 12/30/1996 | P | PASS |
|
|
|
ok
|
INSP - Conference | 12/10/1996 | 12/10/1996 | 12/10/1996 | P | PART |
Wes Worcester
|
|
|
DISCUSSED SPLICES IN PARALLEL IN BOND BEAMS THAT REQUIRE IN INCREASE IN SPLICE LENGHTH OF 30 PER CENT. I STATED SPLICES SHOULD BE ALTERNATED FOR MINIMUM COVER
|
INSP - Masonry | 12/10/1996 | 12/10/1996 | 12/10/1996 | P | PART |
Wes Worcester
|
|
|
|
INSP - Foundation | 12/3/1996 | 12/4/1996 | 12/4/1996 | P | PASS |
Bob Archibald
|
|
|
Special inspection.
|
INSP - Foundation | 11/14/1996 | 11/15/1996 | 11/15/1996 | P | PASS |
|
|
|
11/15/96 333 - SLAB REBAR FTG -OK FOOTING
|
INSP - Masonry | 11/15/1996 | 11/15/1996 | 11/15/1996 | P | PART |
Bob Archibald
|
|
|
MASONRY REBAR Special Inspection present.
|
INSP - Foundation | 11/5/1996 | 11/6/1996 | 11/6/1996 | A | PASS |
Bob Archibald
|
|
|
SLAB INSPECTION
|
INSP - Foundation | 10/28/1996 | 10/28/1996 | 10/28/1996 | | PASS |
|
|
|
Kennel foundation walls.
|
INSP - Foundation | 10/24/1996 | 10/25/1996 | 10/25/1996 | P | PASS |
Bob Archibald
|
|
|
FND.REBAR. Special inspection.
|
INSP - Foundation | 10/23/1996 | 10/24/1996 | 10/24/1996 | A | PASS |
Bob Archibald
|
|
|
REBAR. Covered by special inspection.
|
INSP - Foundation | 10/11/1996 | 10/11/1996 | 10/11/1996 | | PASS |
|
|
|
3yrd. pour.
|
INSP - Foundation | 10/10/1996 | 10/10/1996 | 10/10/1996 | | PASS |
|
|
|
Reinforcing clearances corrected prior to pour.
|
INSP - Foundation | 10/4/1996 | 10/4/1996 | 10/4/1996 | P | PASS |
Bob Archibald
|
|
|
RE-BAR ON FOUNDATION WALL. covered by special inspection.
|
INSP - Foundation | 10/3/1996 | 10/3/1996 | 10/3/1996 | | PASS |
|
|
|
Special Inspector on site, southwest walls, ok.
|
INSP - Footings | 10/1/1996 | 10/1/1996 | 10/1/1996 | | PASS |
|
|
|
Special inspection being provided. Inspection report on job trailer wall.
|
INSP - Conference | 9/25/1996 | 9/25/1996 | 9/25/1996 | | PEND |
|
|
|
Pre-construction conference w/general, architect, engineer, testing lab, mech.& elec. inspectors. Reviewed plan review sheets and approved drawings.
|
INSP - Foundation | 1/2/1997 | 1/2/1997 | 1/2/1996 | P | PART |
Wes Worcester
|
|
|
|