Permit Information
Permit NumberBLD96-01238
StatusFinaled
Name IDAHO HUMANE SOCIETY
Site Address 4775 DORMAN ST
Project NameIDAHO HUMANE SOCIETY
Customer Number 
ePlanReviewNo
Description
IDAHO HUMANE SOCIETY ANIMAL SHELTER * TO CONSTRUCT A NEW TWO STORY, CONCRETE MASONRY UNIT, TYPE V-NONRATED, 28,498 SQ.FT. FULLY FIRE SPRINKLERED, ANIMAL SHELTER AND VETERINARY CLINIC. THE SECOND FLOOR IS 2698 SQ.FT. FOR MECHANICAL EQUIPMENT. THE FIRST FLOOR IS 25,800 SQ.FT. THE FIRE SPRINKLER SYSTEM IS BEING USED FOR ALLOWABLE AREA INCREASE. ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED REQUIREMENT LIST, CABO/ANSI STANDARDS AND THE 1994 EDITION OF THE UBC. MJP (#PC#249-96) NO DR#
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP - Final3/31/19983/31/19984/1/1998PPASS
DetailsJim Storey
04/01/98 301 - FNL -OK FINAL
Permanent Occupancy 3/30/19983/30/1998 DONE
Details
INSP - Final3/4/19983/6/19983/6/1998APART
DetailsJim Storey
03/06/98 301 - Final for the Human Society. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pending s.g. ubc 54
INSP-Final Inspection3/4/19983/5/19983/5/1998APASS
DetailsJoe Tawney
03/05/98 406 - robert ###-#### this is for a final occ REINSP ON ALARM SYSTEM OK FOR PERM OCC
INSP - Final3/4/19983/5/19983/4/1998ACANC
DetailsJim Storey
Scheduled by Hello!. Cancelled by Hello! (Last update by [HLO]). Contact: [3717147].
INSP-Final Inspection2/19/19982/20/19982/20/1998PCANC
DetailsJoe Tawney
02/20/98 406 - SCHEDULED FOR 2:00 WITH ROBERT--###-#### DOGGIE POUND CANCELLED AT ROBERT'S REQUEST WILL RESCHED
INSP - Conference8/19/19978/21/19978/21/1997APASS
DetailsJoe Tawney
08/20/97 406 - DISCUSSED CHANGES IN ALARM SYSTEM TO MEET CODE RESUBMITTA
INSP - Final7/7/19977/8/19977/8/1997PPASS
DetailsJim Storey
07/08/97 301 - REINSPECTION TCO -TEMP C OF O ISSUED w/c/n isued
INSP - Final7/3/19977/7/19977/7/1997AFAIL
DetailsJim Storey
07/07/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP-Final Inspection7/3/19977/3/19977/3/1997PPASS
DetailsJoe Tawney
07/03/97 406 - FINAL OK FOR TEMP OCC ALARM SUBMITTAL KNOX BOX CURB STRI
INSP-Final Inspection7/1/19977/2/19977/2/1997PFAIL
DetailsJoe Tawney
07/01/97 406 - HE SAID YOU WOULD MEET AT 2 O'CLOCK FINAL FAIL ALARM SYSTEM SUBMITTAL DUCT DET NOT HOOKED UP CAN NOT SEE FIRE DAMPERS TO VERIFY IF THEY CLOSE SPKLR SYSTEM OK
INSP - Wall cover6/27/19976/30/19976/30/1997PNR
DetailsJim Storey
06/30/97 301 - grid inspection CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
INSP - Ceiling grid6/20/19976/23/19976/23/1997AFAIL
DetailsJim Storey
06/23/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED penatrations
INSP-Sprinkler Rough-in/Hydro6/23/19976/23/19976/23/1997PPASS
Details
JOHN tvfp, HYDRO, FLUSH missing hanger and plumbing pipe hanging off sprinkler found at rough in corrected
INSP-Supply line flush6/23/19976/23/19976/23/1997PPASS
Details
FLUSH
INSP - Ceiling grid6/19/19976/20/19976/20/1997PCANC
DetailsJim Storey
06/20/97 301 - cancled
INSP - Ceiling grid6/16/19976/16/19976/16/1997 PART
DetailsJim Storey
/ / 301 - SCLG-OK SUSPENDED CEILING EAST END OK
INSP - Wall cover6/13/19976/16/19976/16/1997APASS
DetailsJim Storey
06/16/97 301 - FIRE RATED ASSEMBLY INSP. OF LOBBY AREA OK.
INSP - Carpentry6/11/19976/12/19976/12/1997APART
DetailsJim Storey
06/12/97 301 - FIRE CORRIDOR....8# AND 5# OK FOR TILE ON CIELING
INSP - Framing/Rough-in5/20/19975/20/19975/21/1997PPASS
DetailsJim Storey
05/20/97 301 - CORRIDOR OK #18
INSP - Framing/Rough-in5/5/19975/5/19975/6/1997PNH
DetailsJim Storey
05/06/97 301 - trans to bob a.
INSP - Framing/Rough-in4/25/19974/25/19974/25/1997PCANC
DetailsJim Storey
04/25/97 301 - this was set for thursday pm see if you can make it out t
INSP - Framing/Rough-in4/23/19974/24/19974/25/1997APASS
DetailsJim Storey
04/24/97 301 - FRAM-OK FRAMING
INSP-Sprinkler Rough-in/Hydro4/22/19974/22/19974/22/1997PPART
DetailsJoe Tawney
04/22/97 406 - SPKLR ROUGH IN JOHN TV FIRE ROUGH IN OK TO COVER WHERE REQUIRED
INSP - Carpentry4/16/19974/16/19974/16/1997 PASS
Inside of education corridor ok for taping. Main reception area ok for cover. Also addressed safety glazing requirements.
INSP - Carpentry4/14/19974/15/19974/15/1997AFAIL
DetailsBob Archibald
FIREWALL. Not ready.
INSP - Carpentry4/14/19974/14/19974/14/1997 CANC
Details
04/15/97 333 - given to bob
INSP - Framing/Rough-in4/9/19974/10/19974/11/1997APART
DetailsJim Storey
interior frame ok for clinic area.
INSP - Carpentry3/28/19973/31/19973/30/1997APASS
Details
03/31/97 338 - FIREWALL
INSP - Framing/Rough-in3/24/19973/25/19973/26/1997PPART
DetailsJim Storey
03/26/97 301 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED OK TO ONE SIDE CLASS ROOM COR
INSP - Masonry3/12/19973/13/19973/13/1997APASS
DetailsJim Storey
03/13/97 301 - grouting at 8:30 a.m. MASN-REBAR OK
INSP - Masonry3/11/19973/12/19973/12/1997PPART
DetailsJim Storey
03/12/97 301 - covered by si
INSP - Masonry3/10/19973/11/19973/11/1997APASS
DetailsJim Storey
03/11/97 301 - masonry grout inspection MASN-REBAR OK
INSP - Miscellaneous2/18/19972/18/19972/18/1997 PEND
Masonry and structural steel,flat work in progress and being covered by special inspection.
INSP - Foundation1/17/19971/21/19971/21/1997APASS
DetailsBob Archibald
Covered by special inspection.
INSP - Foundation1/13/19971/14/19971/14/1997APASS
DetailsJim Storey
01/14/97 301 - FDN -OK FOUNDATION
INSP - Foundation12/30/199612/30/199612/30/1996PPASS
Details
ok
INSP - Masonry12/30/199612/30/199612/30/1996PPASS
Details
ok
INSP - Conference12/10/199612/10/199612/10/1996PPART
DetailsWes Worcester
DISCUSSED SPLICES IN PARALLEL IN BOND BEAMS THAT REQUIRE IN INCREASE IN SPLICE LENGHTH OF 30 PER CENT. I STATED SPLICES SHOULD BE ALTERNATED FOR MINIMUM COVER
INSP - Masonry12/10/199612/10/199612/10/1996PPART
DetailsWes Worcester
INSP - Foundation12/3/199612/4/199612/4/1996PPASS
DetailsBob Archibald
Special inspection.
INSP - Foundation11/14/199611/15/199611/15/1996PPASS
Details
11/15/96 333 - SLAB REBAR FTG -OK FOOTING
INSP - Masonry11/15/199611/15/199611/15/1996PPART
DetailsBob Archibald
MASONRY REBAR Special Inspection present.
INSP - Foundation11/5/199611/6/199611/6/1996APASS
DetailsBob Archibald
SLAB INSPECTION
INSP - Foundation10/28/199610/28/199610/28/1996 PASS
Kennel foundation walls.
INSP - Foundation10/24/199610/25/199610/25/1996PPASS
DetailsBob Archibald
FND.REBAR. Special inspection.
INSP - Foundation10/23/199610/24/199610/24/1996APASS
DetailsBob Archibald
REBAR. Covered by special inspection.
INSP - Foundation10/11/199610/11/199610/11/1996 PASS
3yrd. pour.
INSP - Foundation10/10/199610/10/199610/10/1996 PASS
Reinforcing clearances corrected prior to pour.
INSP - Foundation10/4/199610/4/199610/4/1996PPASS
DetailsBob Archibald
RE-BAR ON FOUNDATION WALL. covered by special inspection.
INSP - Foundation10/3/199610/3/199610/3/1996 PASS
Special Inspector on site, southwest walls, ok.
INSP - Footings10/1/199610/1/199610/1/1996 PASS
Special inspection being provided. Inspection report on job trailer wall.
INSP - Conference9/25/19969/25/19969/25/1996 PEND
Pre-construction conference w/general, architect, engineer, testing lab, mech.& elec. inspectors. Reviewed plan review sheets and approved drawings.
INSP - Foundation1/2/19971/2/19971/2/1996PPART
DetailsWes Worcester