INSP - Final | 9/23/1996 | 9/24/1996 | 9/24/1996 | A | PASS |
Alan Hauser
|
|
|
09/24/96 350 - ENTRY NUMBER 6105 SEND ON THE KEY LESS PAD REINSPECTION CORRECTIONS MADE FINAL
|
INSP - Letter of compliance | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11638
|
INSP - Letter of compliance | 9/24/1996 | 9/24/1996 | 9/24/1996 | | PASS |
Alan Hauser
|
|
|
/ / 350 - C/C#11638
|
INSP - Final | 9/20/1996 | 9/23/1996 | 9/23/1996 | A | NH |
Alan Hauser
|
|
|
09/23/96 350 - FINAL REINSPECTION no one home, left notice to call
|
INSP - Final | 9/18/1996 | 9/19/1996 | 9/19/1996 | A | FAIL |
Alan Hauser
|
|
|
09/19/96 350 - NO FINAL CORRECTIONS
|
INSP - Framing/Rough-in | 7/15/1996 | 7/15/1996 | 7/15/1996 | P | PASS |
Alan Hauser
|
|
|
07/15/96 350 - reinspection CATILEVERED I JOIST OK WITH BLOCKING ONLY AS PER MANUFACTURE OK TO COVER
|
INSP - Framing/Rough-in | 7/12/1996 | 7/12/1996 | 7/12/1996 | P | FAIL |
Alan Hauser
|
|
|
07/12/96 350 - STILL CORRECTIONS ON 2ND FLOOR CANTILEVERED PART
|
INSP - Framing/Rough-in | 7/10/1996 | 7/11/1996 | 7/11/1996 | A | PART |
Alan Hauser
|
|
|
07/11/96 350 - OK TO INSULATE, STILL CORRECTIONS ON FRAME TWO CUT I JOIS AT SOUTH WALL, WILL CHECK THESE ON INSULATION INSPECTION.
|
INSP - Framing/Rough-in | 7/9/1996 | 7/10/1996 | 7/10/1996 | P | NR |
Alan Hauser
|
|
|
07/10/96 350 - TALKED WITH WORKER WITH BUILDER, NEED MECH. AND PLANS AND
|
INSP - Framing/Rough-in | 7/3/1996 | 7/5/1996 | 7/8/1996 | A | CANC |
Carl Dependahl
|
|
|
07/05/96 340 - ALS AREA, SENT IN ERROR
|
INSP - Framing/Rough-in | 7/5/1996 | 7/5/1996 | 7/5/1996 | A | FAIL |
Wes Worcester
|
|
|
not ready, no electrical, mech corrections not done, $42 fee due
|
INSP - Footings | 5/28/1996 | 5/29/1996 | 5/29/1996 | P | PART |
Jim Sly
|
|
|
05/28/96 316 - EARLY START Poured W/O inspection....Pouring walls today. setbacks and walls OK.
|