INSP - Framing/Rough-in | 7/3/1996 | 7/3/1996 | 3/15/1997 | P | PART |
Jim Sly
|
|
|
07/03/96 316 - C/N OK to cover except corridor for inspection.
|
INSP - Final | 8/1/1996 | 8/1/1996 | 8/1/1996 | P | NR |
Jim Sly
|
|
|
|
Permanent Occupancy | | 8/1/1996 | 8/1/1996 | | DONE |
|
|
|
|
INSP - Final | 7/31/1996 | 7/31/1996 | 7/31/1996 | P | FAIL |
Jim Sly
|
|
|
07/31/96 316 - FINAL FOR C.O. Need Mechanical signed off.
|
INSP - Final | 7/29/1996 | 7/30/1996 | 7/30/1996 | P | FAIL |
Jim Sly
|
|
|
07/30/96 316 - Need electrical, mech, and fire dept. to sign off.
|
INSP - Ceiling grid | 7/25/1996 | 7/26/1996 | 7/26/1996 | A | PART |
Jim Storey
|
|
|
07/26/96 301 - trans to bob a. Not complete will need to verify at final.325.
|