INSP - Final | 5/19/1997 | 5/19/1997 | 5/19/1997 | P | PASS |
Jim Storey
|
|
|
05/19/97 301 - DENTAL OFFICE FNL -OK FINAL ì
|
Permanent Occupancy | | 5/19/1997 | 5/19/1997 | | DONE |
|
|
|
|
INSP - Final | 2/20/1997 | 2/21/1997 | 2/24/1997 | A | PASS |
|
|
|
final reinspect
|
INSP - Final | 1/28/1997 | 1/28/1997 | 1/28/1997 | | PART |
Jim Storey
|
|
|
/ / 301 - TEMP OCC. OK
|
INSP - Final | 1/6/1997 | 1/6/1997 | 1/6/1997 | P | PART |
Jim Storey
|
|
|
01/06/97 301 - FINAL REINSPECT CORR-CORREC-CALL FOR REINSP WHEN COMPLETED pending p&z and p.w. sign off ì
|
INSP - Final | 1/3/1997 | 1/3/1997 | 1/3/1997 | | PART |
|
|
|
/ / 405 - temp occ ok'd provided door hardware is replaced on monday
|
INSP - Temporary occupancy | 12/31/1996 | 1/2/1997 | 1/2/1997 | P | FAIL |
Jim Storey
|
|
|
01/02/97 301 - late thurs. p.m. CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP - Final | 12/31/1996 | 12/31/1996 | 12/31/1996 | P | CANC |
|
|
|
done in am, c/n issued
|
INSP - Final | 12/31/1996 | 12/31/1996 | 12/31/1996 | | FAIL |
|
|
|
/ / 405 - need 2 fe's and fire lane markings
|
INSP - Final | 12/31/1996 | 12/31/1996 | 12/31/1996 | | FAIL |
|
|
|
/ / 405 - need 2 fe's and fire lane markings
|
INSP - Final | 12/30/1996 | 12/30/1996 | 12/30/1996 | | FAIL |
Jim Sly
|
|
|
/ / 316 - C/N....need all trades ect. final sign offs.
|
INSP - Final | 12/27/1996 | 12/30/1996 | 12/30/1996 | P | CANC |
Wes Worcester
|
|
|
LATE PM PLEASE sent to J Sly
|
INSP - Framing/Rough-in | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PART |
Wes Worcester
|
|
|
shear wall inspection
|
INSP - Wall cover | 11/13/1996 | 11/13/1996 | 11/13/1996 | A | PASS |
Wes Worcester
|
|
|
shr wall ok
|
INSP - Wall cover | 11/13/1996 | 11/13/1996 | 11/13/1996 | P | PASS |
Wes Worcester
|
|
|
ck'd three shear walls (GWP at 6" oc)
|
INSP - Framing/Rough-in | 11/4/1996 | 11/4/1996 | 11/4/1996 | | PASS |
Jim Storey
|
|
|
11/01/96 301 - AS LATE AS POSSIBLE PLEASE CORR-CORREC-CALL FOR REINSP WHEN COMPLETED SHEER NAILLING OF GYP. FRAM-OK FRAMING
|
INSP - Framing/Rough-in | 11/1/1996 | 11/1/1996 | 11/1/1996 | P | FAIL |
Jim Storey
|
|
|
AS LATE AS POSSIBLE PLEASE
|
INSP - Framing/Rough-in | 10/29/1996 | 10/30/1996 | 10/30/1996 | P | PART |
Jim Storey
|
|
|
10/29/96 301 - OTH-OTHER AGENCIES NOT APPROVED ELE, PLUMB CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
INSP-Supply line flush | 10/1/1996 | 10/1/1996 | 10/1/1996 | | PART |
|
|
|
/ / 405 - walt culver 866 -1122, new hydrant ug thrust blocking checked, no hydro/flush
|
INSP-Supply line flush | 10/1/1996 | 10/1/1996 | 10/1/1996 | | PART |
|
|
|
/ / 405 - walt culver 866 -1122, new hydrant ug thrust blocking checked, no hydro/flush
|
INSP - Final | 9/30/1996 | 9/30/1996 | 9/30/1996 | P | NR |
|
|
|
09/30/96 405 - WALT CULVER - ###-####. 4:30? PM.(LATE) not ready
|
INSP - Footings | 9/9/1996 | 9/9/1996 | 9/9/1996 | P | PASS |
Jim Storey
|
|
|
09/09/96 301 - FRMS-OK FORMS-REBAR
|
INSP - Final | 1/2/1997 | 1/2/1997 | 10/29/1907 | P | FAIL |
|
|
|
door hardware wrong....knobs and thumbturns
|